eng20090426-Edward_Jones 2.pdf
City of Edmonds
TH
121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
Permit Application :Date
# BLD 20090426July 24, 2009
Project Name/Address:
Edward Jones Investments 313 Main St Sign
Contact Person/Address, Fax or E-mail:
Pacific Sign Erectors pacificsignerectors@msn.com
Reviewer: JoAnne Zulauf Division:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.us under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
1)7/24/09 Still Need. Since installing the signs will nescessitate using the right of way for a period of time,
a right of way construction permit will be required.
2)7/24/09 Still Need. A Street Use permit will be required for the use of the right of way of the sign to be
installed and for the awning.
Edmonds Community Development Code Chapter 18.70.000 Section B states A Street Use permit is
required “to place or maintain in, over or under any public place, right of way, roadway, parking strip,
and/or sidewalk, including the air space above them, any temporary or moveable object.”
I am attaching a permit applications which must be signed by the business owner, and an example of the
insurance certification required from the business owners insurance company.
PLEASE NOTE: Insurance certification must cover 300,000 Personal Injury and 100,000 Property
Damage. The City of Edmonds must be named as the “additional insured”.
Once the application and the insurance certification are received Engineering will approve permits.
Please resubmit 3 copies of the traffic control plans to an Engineering Technician. Please contact me at
425-771-0220 ext 1324 or by e-mail at zulauf@ci.edmonds.wa.us if you have specific questions regarding
these plan corrections.
DATE E-MAILED July 10, 2009