eng20110112_8319-238_St_SW_ROW-PSE_ENG1.pdf
City of EdmondsENG20110112
TH
121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
Engineering Plan Review Comments
PermitApplication:Date:
#ENG20110112May 12, 2011
th
Project Name/Address:
8319–238St SW
Contact Person/Address, Fax or E-mail:
Teresa Bradford –Teresa.bradford@pse.com
Reviewer: JENNIFER LAMBERTDivision:
ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.ci.edmonds.wa.usunder City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
Please revise Site Plan/ Traffic Control Planto show the following:
1.Water and sewer are Olympic View Water Sewer District (OVWSD) utilities. Please provide
approval from OVWSD for the location of the proposed gas main.
2.Please verify that 5’ separation can be maintained from the city Storm Line.
3.Please note that if thenumber of cuts within the paved portion of the asphalt occur as shown on
the plans, a½ width grind and overlay may be required.
4.On Traffic Control Plan Sheet 3 of 3, there is a note that half of the driveway will remain open.
This driveway indicated,is the entrance into the shopping center (i.e. Safeway). Due to the
significant traffic flow at this entrance flaggers will need to be present to direct traffic going both
east and westbound as well as entering and existing the shopping center.
a.Please revise the plans to show flaggers and appropriate signage or
b.Provide a Traffic Control Plan that will safely control traffic entering and exiting the
shopping center.
Please resubmit 3 copies of the revised site plan or traffic control plansand associated documents with a
written response to each item to an Engineering Technician. Please contact me at 425-771-0220ext 1321
or by e-mail at jennifer.lambert@ci.edmonds.wa.usif you have specific questions regarding these plan
corrections.
DATE E-MAILED5/12/2011PAGE(1)