Loading...
ENG20120256_Lake_Ballinger_Way_ROW-PUD.pdf City of Edmonds ENG20120256 TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORK DEPARTMENT Planning • Building • Engineering Engineering Plan Review Comments Permit Application :Date: # ENG20120256 8/1/12 Project Name/Address: 7417 Lake Ballinger Way – WO#382044 Contact Person/Address, Fax or E-mail: Arturas Floria Reviewer: JENNIFER LAMBERT Division: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: www.ci.edmonds.wa.us under City Government / Development Services Department / Engineering Division then scroll down to Handouts: Please revise site plan to show the following: 1.Please provide a Traffic Control Plan / Site Plan and include the following: a.Edge of pavement b.Sidewalk c.Edge of Right-of-way d.Approximate size and locations of all cuts 2.Show the locations of all city utilities. a.Storm, Sewer, and water all exist within Lake Ballinger Way. b.Show that a 5’ separation is maintained 3.From the Traffic Control Plan provided it appears that you intend to utilize a travel lane to complete the proposed work, will the sidewalk remain open? a.If so, please not as such on the plans. b.If not, please provide a pedestrian traffic control plan showing where pedestrians will be rerouted and show proper signage. Please resubmit 3 copies of the revised traffic control plans and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e- mail at jennifer.lambert@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. DATE E-MAILED 8/1/2012 PAGE(1)