ENG20130087_8720_191_PL_SW_ROW-PUD_ENG3.pdfCity of Edmonds
121 5T" AVENUE NORTH EDMONDS,
1
h, p titif"s i
� t�! �"�.' PUBLIC WORK DEPARTMENT
Planning • Building • Engineering
ENG20130087
WA 98020 • (425) 771-0220 FAX (425) 771-0221
Website: .w\v%v,cd1nondS w .qy
Engineering Plan Review Comments
Permit Application #: ENG20130087 ....................... . ..... — Date: 8/19/14
Project Name/Address: 9720 11„91 st PI SW
Contact Person/Address, Fax or E-mail Chuck Earle
Reviewer: JENNIFER LAMBERT Division: ENGINEERING
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at
our website: www.edmondcwa_uov under City Government / Development Services Department /
Engineering Division then scroll down to Handouts:
I” Review — 5/8/13
2"d Review — 8/19/14
Please revise site plan to show the following:
1. OK
2. OK
3. 8/19/14 — Comment was not addressed. One of the bore pits appears to be right on top of the
storm system.
5/8/13 Comment: Please show the storm location on 881h Ave W.
8/19/14 — Comment was partially addressed. There is a note that the new line will be a minimum
of 5' from the City utilities; however, it does not appear that this is possible. Please clearly show
that the 5' separation can be achieved. Due to the depth of the sewer, when they City replaces the
sewer the PUD line could be affected if placed less than 5'.
5/8/13 Comment: Please show that a 5' separation is maintained from the City Utilities.
ADDITIONAL COMMENT
8/19/14 — It appears that there is a PUD easement that is currently not being used. Please either
show the new PUD line located within the easement or revise the plans to accurately depict the
utility location (both existing and proposed).
Please resubmit 3 copies of the revised plans and associated documents with a written response to each
item to an Engineering Technician. Please contact me at 425-771-0220 ext 1321 or by e-mail at
tit ll r,lattrla dIngntlsw�v if you have specific questions regarding these plan corrections.
DATE E-MAILED 8/19/2014 PAGE (1)
/rAl 2
a
,',
r
q$
U
iJ
'
1
t
w
�
z
J
wa:
o
i
E
,
�qy
r"
i w
W I
N N,
d
jF p
s
a
a �
i
r
—
fp
a
v
o �
a
Vr z
r!
r
s
— u
u
y
4
6 n
I _
..
.i.�
M IAV H.1.99
a-
z
w
2
U)
U')
W
41
�
Z
G
CL
C:a
i
.�r�..,
b
Lu
Cl)
Lj
W
f i
�
tD
t
�
�L�LiA�LtlLI G'Jr]a
.�
* " I � r.
n
..1