Loading...
eng20140204, 0206 & 0207_Flow Reduction Study.pdf City of EdmondsENG2014-0204, 0206, 0207 TH 121 5AVENUE NORTHEDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: http://www.edmondswa.gov/ PUBLIC WORK DEPARTMENT Planning • Building • Engineering Plan Review Comments PermitApplication:Date: #ENG2014-0204, 0206, 0207 April30, 2014 Project Name/Address: Perrinville Creek Stormwater Flow Reduction Study Danika Globokardglobokar@aesgeo.com Contact Person/Address, Fax or E-mail: Reviewer: Chris RiveraDivision: ENGINEERING During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts referred to in these comments can be accessed at our website: http://www.edmondswa.gov/under City Government / Development Services Department / Engineering Division then scroll down to Handouts: ndrd Boretest 182St SW & 73Ave W. 1)Please show sewer main line on site plan. Refer to http://maps.edmondswa.gov/Default.htmto help locate city utilities. nd 2)Please revise site plan,relocating project to the east side of manholeon 182St. SW. 3)Boring not to take place in wheel path. Hole to be backfilled with bentonite. 4)A 2’x2’ cut in the asphalt shall be made to establish a clean patch. Asphalt shall be installed according to City of Edmonds details E2.3. thrd Bore test 77Pl W. & 193Pl. SW. 1) Please revise site plan relocating project within theright of way off of the street. rd Pl SW. 2)Please show water main along 193 3)Hole to be backfilled with bentonite. Restore landscape to like or betterconditions. st Bore test 7628191St SW 1) Please revise site plan relocating project within the right of way off of the street. 2) Hole to be backfilled with bentonite. Please resubmit the revised plansand associated documents with a written response to each item to a Engineering Technician. Please contact me at 425-771-0220ext 1339or by e-mail at chris.rivera@edmondswa.govif you have specific questions regarding these plan corrections. DATE E-MAILED4/30/2014PAGE(1)