eng20140668-ATT-2.doc
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.edmondswa.gov
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD201400668 / ENG20140431 October 28, 2014
th
Project Name/Address:
AT & T Wireless 6908 174 St SW
Contact Person/Address/Fax:
Kim Lintner Lintnerllc1@yahoo.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and
Public Works| Engineering under Departments:
Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to
Engineering Handouts for all Engineering Requirements.
1. Done.
2. Per AT&T Master Use agreement, Ordinance 3441 Section 19, a performance bond in the
amount of 125% of the estimated cost of restoring the right of way to preconstruction
conditions shall be collected by the City prior to permit issuance. Please provide a written
cost estimate to determine the bond amount.
The requirement for the cost estimate is a written estimate. An itemized estimate is
required and the scope of the estimate is to entirely return the site to it’s existing
conditions so would need to include removal of the equipment installed. In the past I have
accepted the estimate for the proposed construction. It is not the same as the removal
cost but it does cover all the scope of the materials and labor etc. That estimate could be
provided or an estimate itemizing the costs of removal and restoration would be
acceptable.
3. Done.
DATE FAXED/E-MAILED 6/29/2017 PAGE ___ OF __
12
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.