Loading...
eng20150285 - Seaview Drainage - E3.pdf CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: December 9, 2015 TO: Nick Chou choun@edmonds.wednet.edu FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: eng20150285 Project: Sherwood Elementary th Project Address: 8426–188St SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit three (3) sets of revised plans/documents with a written response to each of the items belowto a permit coordinator. nd Resubmittals can be made at the Development Services Department on the 2floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm. The Permit Center is closed on Wednesdays. City of Edmonds handouts, standard details and development code can be referenced on the City website. Review 1 –July 10, 2015 Review 2 –September 17, 2015 Review 3 –December 9, 2015 ok 1. ok 2. ok 3. December 9, 2015–Thank you for submitting an encroachment permit application. I 4. have reviewed the applicationand found that the recording documents are not in compliance with Snohomish County recording requirements.Please ensure all documents meet their requirements or they will berejected by theCounty at the time of recording and additional charges will be incurred. I have noted at least the followingwhich needs to be correctedandwas included in the documentationprovided with theencroachment permit handout: a.All documents shallbe completedin black ink.The encroachment agreement was signed in blue ink. b.All documents shall have a minimum 1”margin. Exhibits A & B do not meet this requirement. c.All documents shall have a font no less than 8pt.Exhibits A & B do not meet this requirement. As noted inthe encroachmentagreement, Exhibit B is to be a partial site plan scaled 1”=20’and showing thelocation of theencroachment. Revising Exhibit B as such will help meet Snohomish County recording requirements for margins and font size. 9/17/2015comment– a.Thank you for showing the easement and sanitary sewer main on Figure 4. This information is also to be provided on the plan set that is not bound in the drainage study. b.Comment b. below has not been addressed. An email was sent to the applicant on 9/14/2015 indicating an encroachment permit is in fact a requirement of this permit approval, however, the City would find it acceptable to condition the permit to require recording of the agreement prior to final construction approval. 7/10/2015 -A City of Edmonds owned sanitary sewer main runs through the playfieldin Easement AFN1975576. The sanitary sewer line is shown on page 12 of thedrainage report. a.Please show the easement and sanitary sewer main on Sheet C-3, Grading and TESC Plan. b.Documentation is required to acknowledge that improvements installed within the easement area are the ownership and maintenance responsibility of the School District. In addition, should the City need to replace the sanitary sewer main, repair/replacement ofthe drainage system would be the responsibility of the School District. Unless you have specific instrument to accomplish this, an encroachment permit application agreement could be submitted to the City for review and approval. Please refer to City handout E26. ok 5. Page 2of 2