Loading...
ENG20150490-Revision.pdf THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 10/26/1510/27/1510/27/1512/08/15 DATE 1 N/A 1/4 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG 109092829 EDMONDS 109092829 N office 425-505-3768425-424-6413425-424-6414253-405-2703425-766-1307N/AN/AN/A N/A PHONE NO PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 1"=20' MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY N/A N/A INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info For contacts below dial 1-888-CALL PSE (225-5773) PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS PERMIT NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. SCALE DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND M. JANSSON SITE KEVIN ANSON STANDARD GAS CONSTRUCTION NOTES:CONTACT J. GUAY MLOCK T. LY N/A NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. REAL ESTATE/EASEMENT N/AN/AN/A RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. N/A RETIREMENT LENGTH OF Vicinity Map ACTUAL PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY N/A ENGR - GAS 2" STW IP MAIN REPLACEMENT GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. DRAWN BY FUNCTION 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING ATTN:7529 BRAEMAR DR N/A N/AN/AN/A EDMONDS, WA 98026 ___________________________, PHONE______________. RETIREMENT LENGTH OF SAP BATCH YEAR & FOOTAGE PROPOSED Manufacturer THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. TESTED BYTESTED BY WATERWATER REVISE LINE OF MAIN ON BRAEMAR DR 159.070 & 159.069 N/AN/AN/A 109092829109092830108587104108587105 SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG SYSGGPM Order # GAS WK CTR TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 60 425-766-1307 NITROGENNITROGEN PLAT MAP Act Lgth ORIGINAL GAS MAIN INSTALLATION/RETIREMENT FF YEAR 60 PSIG GAS MAIN PRESSURE & TESTING PP DESCRIPTION OPERATING STANDARD 2525.2500. Est Length BOX (TEST LEAD) INSTALLATION. 1100'1066' FOOTAGE BETWEEN FITTINGS. TEST RESULTSTEST RESULTS ORIGINAL INFORMATION ON D-4 CARD) START TIMESTART TIME JOB AIRSTOP TIMEAIRSTOP TIMESYS MAOP N/AN/AN/A 156.068 Notification # Yes NoYes No Project Manager Contact Information: 4 11153693Emer Sect Type MPE KEVIN ANSON STW OP MAP BY ML john.guay@pse.com MATERIAL RETIRED SOAPSOAP / / / / / / / / 425-505-3768 Pipe Size JOHN GUAY 60CONTACTPHONE# UTILITIES Service/MeterService/MeterService/MeterService/Meter10/28/16SW 8-27-4 & SE 7-27-4 SAP Superior Dis. Reg. / FTSVC Retirement Main Retirement 2" DATE 2"HP Svc/MSA Ind. ServicePSE "Flagging Required" "Locates Required" PROJECT PHASE SNOHOMISH Ind. MSA 10.11.12.13.14.15.17.DESIGN PRESS 18.DESIGNED BY 1.2.3.4.5.6.7.8.9. RETIRED SIZE OF Type/Work TYPE TESTTYPE TESTPRESSURE PRESSURE INSTALL 2023 03/10 MAIN DATE OFFDATE OFF RETIRE Cell Phone: DATE ONDATE ON REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: GAS MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION, NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. Completed post installation inspection per GOS 2525.1200 and 2525.2700. REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. (CHECK BOX TO CONFIRM COMPLETION) REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. Recorded all required information on the as-built per GOS 2500.1700. REPLACEMENT CONSTRUCTION NOTES Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. KEY TO SERVICE ACTION LEGEND BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. Reviewed and complied with all construction notes. Left the work area in a clean and safe condition. STANDARD IP & LP GAS FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER PROJECT CONTACT INFORMATION: ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK. FITTER'S CHECKLIST PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500. ##### mark.jansson@pse.com INCLUDING AT OR BEYOND THE CONNECTION POINTS. david.lima@pse.com john.guay@pse.com ACTIVE SERVICES TO BE REPLACED DENOTED BY:T&TT&T### MARK JANSSON PER PSE GAS OPERATING STANDARD 2550.1600. 206-396-0691425-466-9047425-505-3768 JOHN GUAY DAVID LIMA 4680 06/11 # CONSTRUCTION QUESTIONS:# GAS OPERATING STANDARD 2525.2300. # STANDARDS 2525.2100 AND 2525.3600. ABANDONMENT OR DEACTIVATION. SHALL BE CONTACTED: FIELD NOTES: BILLING QUESTIONS: CONST MANAGER: CELL: EMAIL: FIELD DESIGNER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: OUTAGE. 10.11.12.13. 14.15. 1.2. 1.2.3.4.5.6.7.8.9. SHEET 3 R D R A M E A R B SCALE: NOT TO SCALE AREA PLAN RD RA MEA RB SHEET 2 R D R A M LENGTH E A R B DEPTH 173RD ST HOLE HOG TABLE LOCATION 76TH AVE W STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART ENDENDENDENDENDENDENDENDENDENDENDENDENDENDENDENDENDEND CALLOUT BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20BP21BP22BP23BP24BP25BP26BP27BP28BP29BP30BP31BP32BP33BP34BP35BP36 BP1BP2BP3BP4BP5BP6BP7BP8BP9 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 12/01/1510/26/1510/27/1510/27/1512/08/15 DATE 1 N/A 2/4 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109092829 425-505-3768425-424-6413425-424-6414253-405-2703425-766-1307N/AN/AN/A N/A PHONE NO 1"=20' N/A For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE M. JANSSON KEVIN ANSON CONTACT J. GUAY MLOCK T. LY N/A REAL ESTATE/EASEMENT N/AN/AN/A N/A PROJECT MGRAPPROVED BY CP APPROVAL Scale: N.T.S JOINT FACILITIES ARRANGEMENTS CHECKED BY BRAEMAR DR (STATION POINT 11+55) ENGR - GAS 2" STW IP MAIN REPLACEMENT DRAWN BY FUNCTION SECTION A-A MAPPING 7529 BRAEMAR DR EDMONDS, WA 98026 REVISE LINE OF MAIN ON BRAEMAR DR 159.070 & 159.069 N/AN/AN/A Scale: N.T.S. SYSGGPM DETAIL TIE-IN GAS WK CTR PLAT MAP DESCRIPTION A 1 N/AN/AN/A 156.068 Yes NoYes No Project Manager Contact Information: 4 Emer Sect OP MAP ML BY john.guay@pse.com 1 425-505-3768 JOHN GUAY CONTACTPHONE# UTILITIES 10/28/16 SW 8-27-4 & SE 7-27-4 1 DATE PSE "Flagging Required" "Locates Required" SNOHOMISH DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: 7510 7508 MATCHLINE A-A(SEE SHEET 3) 7 5 1 2 7515 7 5 1 4 7520SCALE: 1" = 20'-0" PLOT PLAN AA 1 9 2 5 7 7530 1 17400 IP GAS FLOW 29' 16' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 12/01/1510/26/1510/27/1510/27/1512/08/15 DATE 1 N/A 3/4 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109092829 425-505-3768425-424-6413425-424-6414253-405-2703425-766-1307N/AN/AN/A N/A PHONE NO 1"=20' N/A For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE M. JANSSON KEVIN ANSON CONTACT J. GUAY MLOCK T. LY N/A REAL ESTATE/EASEMENT N/AN/AN/A N/A PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS 2" STW IP MAIN REPLACEMENT DRAWN BY FUNCTION MAPPING 7529 BRAEMAR DR EDMONDS, WA 98026 Scale: N.T.S BRAEMAR DR (STATION POINT 17+60) SECTION B-B REVISE LINE OF MAIN ON BRAEMAR DR 159.070 & 159.069 N/AN/AN/A MATCHLINE B-B (THIS SHEET) SYSGGPM GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 156.068 B Yes NoYes No Project Manager Contact Information: 4 Emer Sect OP MAP 1 ML BY john.guay@pse.com 425-505-3768 JOHN GUAY CONTACTPHONE# UTILITIES 10/28/16SW 8-27-4 & SE 7-27-4 7 DATE 3 PSE "Flagging Required" 9 "Locates Required" 3 SNOHOMISH DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: 7 4 0 0 2047 7401 03 74 MATCHLINE B-B B (THIS SHEET) 5 1 4 7 B 5 2 4 7 SCALE: 1" = 20'-0" PLOT PLAN 7 4 0 4 1 1 0 5 7 (SEE SHEET 2) MATCHLINE A-A 3 0 5 7 7 0 5 7 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 12/01/1510/26/1510/27/1510/27/1512/05/15 DATE 1 N/A 4/4 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109092829 425-505-3768425-424-6413425-424-6414253-405-2703425-766-1307N/AN/AN/A N/A PHONE NO N.T.S. N/A For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE M. JANSSON KEVIN ANSON CONTACT J. GUAY MLOCK T. LY N/A REAL ESTATE/EASEMENT N/AN/AN/A N/A PROJECT MGRAPPROVED BY CP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS 2" STW IP MAIN REPLACEMENT DRAWN BY FUNCTION MAPPING 7529 BRAEMAR DR EDMONDS, WA 98026 REVISE LINE OF MAIN ON BRAEMAR DR 159.070 & 159.069 N/AN/AN/A SYSGGPM GAS WK CTR PLAT MAP DESCRIPTION N/AN/AN/A 156.068 Yes NoYes No Project Manager Contact Information: 4 Emer Sect OP MAP ML BY john.guay@pse.com 425-505-3768 JOHN GUAY CONTACTPHONE# UTILITIES 10/28/16 SW 8-27-4 & SE 7-27-4 DATE PSE "Flagging Required" "Locates Required" SNOHOMISH DESIGNED BY Cell Phone: REV# Manager:COUNTY 1/4 SEC 1 32 E-Mail: SAP# 109092829 1 BYPASS MATERIALS 45 44 43 42 41 40 23 22 21 20 19 18 17 16 15 14 BOX COMPLETE 1" THRU 4" POLYVALVES9996260 1 13 BOX SUPPORT 2" POLYVALVE9996257 1 12 VALVE 2" MPE5600259 1 11 CAP 2" MPE5200649 1 10 8500930 CP WIRE #10 TEST LEAD 10' 9 3 6000484 8 CP TEST LEAD BOX COMPLETE5000307 2 7 TRANSITION FITTING 2"7800809 1 6 CAP 2" WELD5200675 1 5 6000500 1 4 STOPPER 2" X 150 STD H-17160 B/O7600741 1 3 PIPE 2" MPE STRAIGHT7000263 20' 2 WIRE #14 TRACING8500940 1100' 1 1100' PIPE 2" MPE COIL7000261 QTY ITEMDESCRIPTIONPART NO. BILL OF MATERIAL