Loading...
Eng20160089_Herrera-8.9.16.docx August 9, 2016 City of Edmonds Public Works Department Engineering Division 121 5th Avenue North Edmonds, WA 98020 Attn: JoAnne Zulauf Subject: Stormwater Plan Review of Perrinville Drainage Re-Route (ENG2016-0089) Dear Ms. Zulauf: After reviewing the response to comments on the 18502 76th Avenue (Greg Payne Perrinville Retail Building Upgrade), we have the following comments: Offsite Drainage Report 8.All of the pipe inverts in the New CB “A” are listed at the same elevation (264.60’) in the Offsite Drainage Plan and the Offsite Drainage Schematic. 5/11/16 response: Applicant response is that storm drain IE’s are usually the same in a basin for same sized pipe. This is fine; no design change required. Sheet 1 of 1 – Offsite Drainage Plan 2.Provide a connection to the existing outfall to prevent over-splash and erosion at the turn of the ditch. 5/11/16 response: Suggestions for consideration in the existing outfall design include the following:  Diffuser tee at the bottom of the pipe surrounded by riprap (Figure 4.5.11, Volume V of the 2014 SWMMWW; Figure 4.11, Volume V of the 2005 SWMMWW)  Gabion baskets filled with quarry spalls (Figure 4.5.10, Volume V of the 2014 SWMMWW; Figure 4.10, Volume V of the 2005 SWMMWW)  Willow stakes to provide protection and screen the gabion basket/diffuser tee 8/9/16 response: The applicant has not shown any details as to how the stormwater velocity will be dissipated in the channel at the base of the slope prior to entering the Stilling Basin “D”. Applicant shall show how design meets the requirements of BMP C209: Outlet Protection of the current SWMMWW. 2200 Sixth Avenue | Suite 1100 | Seattle, Washington | 98121 | p 206 441 9080 | f 206 441 9108 PORTLAND, OR | MISSOULA, MT | OLYMPIA, WA | WINTHROP, WA | BELLINGHAM, WA Stormwater Plan Review of Perrinville Drainage Re-Route (ENG2016-0089) August 9, 2016 Page 2 Sincerely, Colleen Mitchell, PE Senior Engineer 8.9.16 - eng20160089_herrera cm