Loading...
ENG20160398.PDF08 OF E� OWN CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 1�c. 1 IZ, PHONE: (425) 771-0220 - FAX: (425) 771-0221 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20160398 SIDE SEWER PERMIT (I -Single Family) Permit Number: ENG20160398 Expiration Date: l l /18/2017 Job Address: 16404 75TH PL W. EDMONDS RDJ GROUP LLC 221 185TH PL SW BOTHELL, WA 98012 LICENSE 4: EXP: Y N JOB DESCRIPTION REPAIR Y PROPOSE TO REUSE LATERAL LID NUMBER: GRINDER PUMP N PROPOSE TO REUSE SIDE SEWER N DRAINAGE Existing home was demoed (BLD20160848). Side sewer for new single family residence. INFO ' 1 N PROJECT CROSSES OTHER PRIVATE PROPERTY N VERIFICATION OF RECORDED EASEMENTS COMPLETE INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and attorney fees by reason ofgranting this permit. CALL DIAL A -DIG (1-800-424-5555) BEFORE ANY EXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT.1326 24 HOUR NOTICE REQUIRED FOR ALL INSPECTION REQUESTS APPLICATION1 THIS APPLICATION IS NOTA PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPTIS ACKNOWLEDGED IN SPACE PROVIDED. Printed: Friday, November 18, 2016 ,�iuz�.CL:/ xy& t //f/8 fZOI(o RELEASED BY DATE XFILECOPY ❑ INSPECTOR COPY APPLICANT COPY STATUS: ISSUED ENG20160398 • Refer to City of Edmonds Side Sewer Information handout for approved pipe materials, inspections and other requirements. • A 6" cleanout with 12" locking cast iron lamphole cover is required at the property line. • Maintain 10' separation between the sanitary side sewer and the water service line. • A separate right-of-way construction permit is required for work within the City right-of-way. • Condition of the existing lateral to be verified by the City's Public Works Dept. to obtain approval for reuse. Contact Edmonds Sewer Division at 425-771-0235. • Condition of the existing sanitary side sewer to be verified prior to obtaining approval for reuse. TV inspection required. Video to be submitted to City for review. • Easement and/or permission from adjacent property owner is required prior to entry/work within adjacent property. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. • Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance ofthis permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance provision. • E Sanitary Side Sewer Inspection • E-Engineering Final PARTIAL INSPECTION PARTIAL INSPECTION FINAL INSPECTION APPROVED DATE: INITIAL: DATE: INITIAL: DATE: INITIAL: NOTES: NOTES: