ENG20170037-REVISED2.pdf
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17
DATE
1/4
...PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
109098145 EDMONDS
109098145
N
office
206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A
PHONE NO
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
1"=20'
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED
EXCEPT AS
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
N/A
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY Owner / Developer Contact Info
For contacts below dial 1-888-CALL PSE (225-5773)
PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
PERMIT
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
SCALE
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE
PER
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR
INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES
G.VUKOSAV
INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSEMAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300,
2525.3400
NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
STANDARD GAS CONSTRUCTION NOTES:CONTACT P.INDORFP.INDORF
N.MARTIN
K.ANSON
D.DAO
PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
REAL ESTATE/EASEMENT
REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.N/AN/AN/A
REPLACEMENT CONSTRUCTION NOTES
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
N/A
WORK
1-1/4" MPE AND 6" STW IP MAIN RELOCATE
PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
SITE
Vicinity Map
76TH AVE W & 212TH ST SW
REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
N/A
ENGR - GAS
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
DRAWN BY
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
FUNCTION
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING
ATTN:
N/A
N/AN/AN/A
STANDARD IP & LP GAS
EDMONDS, WA 98026
___________________________, PHONE______________.
Manufacturer
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
TESTED BYTESTED BY
WATERWATER
N/AN/AN/A
109098145108592084
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
CSPNSGPM
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.Order #163.069
#####
GAS WK CTR
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
45
425-766-1307
NITROGENNITROGEN
PLAT MAP
Act Lgth
ACTIVE SERVICES TO BE REPLACED DENOTED BY:
GAS MAIN INSTALLATION/RETIREMENT
FF
PER PSE GAS OPERATING STANDARD 2550.1600.
45 PSIG
GAS MAIN PRESSURE & TESTING
PP
DESCRIPTION
GAS OPERATING STANDARD 2525.2300.
OPERATING STANDARD 2525.2500.
Est Length
STANDARDS 2525.2100 AND 2525.3600.
BOX (TEST LEAD) INSTALLATION.
FOOTAGE BETWEEN FITTINGS.ABANDONMENT OR DEACTIVATION.16'
8'TEST RESULTSTEST RESULTS
INFORMATION ON D-4 CARD)
START TIMESTART TIME
AIRSTOP TIMEAIRSTOP TIMESYS MAOP
N/AN/AN/A
160.068
Notification #
Yes NoYes No
Project Manager Contact Information:
5
11093022Emer Sect
KEVIN ANSON
Type
parker.indorf@pse.com
STWSTW
OP MAP
BY
PARKER INDORF
SOAPSOAP
/ / / / / / / /
OUTAGE.425-463-6802
Pipe Size
60CONTACTPHONE#
UTILITIES
Service/MeterService/MeterService/MeterService/Meter
SAP Superior
Dis. Reg. / FT
DATE
6"6"HP Svc/MSA
Ind. ServicePSE
Retirement
"Flagging Required"
"Locates Required"
PROJECT PHASE
SNOHOMISH
Ind. MSASE 19-27-04
Relocate
10.11.12.13.14.15.17.10.11.12.13.DESIGN PRESS
18.14.15.DESIGNED BY
1.2.3.4.5.6.7.8.9.
1.2.3.4.5.6.7.8.9.
Type/Work
TYPE TESTTYPE TESTPRESSURE
PRESSURE
INSTALL
2023 03/10
DATE OFFDATE OFF
RETIRE Cell Phone:
DATE ONDATE ON
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
GAS
RETIREMENT
LENGTH OF
LENGTH
ACTUAL
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
(CHECK BOX TO CONFIRM COMPLETION)
Recorded all required information on the as-built per GOS 2500.1700.
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: InfraSource Construction Date ______________
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
RETIREMENT
LENGTH OF
SAP BATCH YEAR & FOOTAGE PROPOSED
DEPTH
Reviewed and complied with all construction notes.
Left the work area in a clean and safe condition.
HOLE HOG TABLE
ORIGINAL
YEAR
LOCATION
FITTER'S CHECKLIST
ORIGINAL
JOB
4680 06/11
MATERIAL
RETIRED
STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART
ENDENDENDENDENDENDENDENDENDEND
CALLOUT
RETIRED
SIZE OF
MAIN
BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19BP20
BP1BP2BP3BP4BP5BP6BP7BP8BP9
CLEARANCE
1' MIN.
LEGEND
FROM OTHER UTILITIES:
MINIMUM CLEARANCE
HORIZONTAL: 5'
VERTICAL: 1'
Scale: NONE
Scale: NONE
ROADWAY CROSS SECTION
ROADWAY CROSS SECTION
2
B
2
A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17
DATE
2/4
...PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109098145
LEGEND
206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
CONTACT P.INDORFP.INDORF
N.MARTIN
K.ANSON
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
1-1/4" MPE AND 6" STW IP MAIN RELOCATE
76TH AVE W & 212TH ST SW
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION
MAPPING
EDMONDS, WA 98026
4'
5'
N/AN/AN/A
CSPNSGPM
163.069
GAS WK CTR
4'PLAT MAP
19'
DESCRIPTION
22'
21'
N/AN/AN/A
160.068
Yes NoYes No
1 Project Manager Contact Information:
B
5
Emer Sect
parker.indorf@pse.com
OP MAP
BY
PARKER INDORF
425-463-6802
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
SNOHOMISH
SE 19-27-04
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
2
212TH ST
IP GAS FLOW
M
7
44
5
P
3
E
0
I
Scale: NONE
TIE-IN DETAIL
2
76TH AVE
SCALE: 1" = 20'-0"
PLOT PLAN
44
76TH AVE W
IP GAS FLOW
1
20'
35'
6'
A1
212TH ST
17'
15'
35'
5'
D
Y
L
IC
U
B
A
B
D
M
L
L
R
A
I
UA
T Scale: NONE
BH
N TIE-IN DETAIL
P
E1
3
D
1
6
3
1
7
6
3
7
6
7
1
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17
DATE
4/4
...PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109098145
206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
CONTACT P.INDORFP.INDORF
N.MARTIN
K.ANSON
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
1-1/4" MPE AND 6" STW IP MAIN RELOCATE
76TH AVE W & 212TH ST SW
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION
MAPPING
EDMONDS, WA 98026
N/AN/AN/A
CSPNSGPM
163.069
GAS WK CTR
PLAT MAP
DESCRIPTION
N/AN/AN/A
160.068
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
parker.indorf@pse.com
OP MAP
BY
PARKER INDORF
425-463-6802
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
SNOHOMISH
SE 19-27-04
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/18/172/17/171/18/17
DATE
5/5
...PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109098145
206-517-3404425-429-5486425-424-6426425-424-6549206-517-3404425-766-1307N/AN/AN/A
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
G.VUKOSAV
CONTACT P.INDORFP.INDORF
N.MARTIN
K.ANSON
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
1-1/4" MPE AND 6" STW IP MAIN RELOCATE
76TH AVE W & 212TH ST SW
PROJECT MGRAPPROVED BY
CP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION
MAPPING
EDMONDS, WA 98026
N/AN/AN/A
CSPNSGPM
163.069
GAS WK CTR
PLAT MAP
DESCRIPTION
N/AN/AN/A
160.068
Yes NoYes No
Project Manager Contact Information:
5
Emer Sect
parker.indorf@pse.com
OP MAP
BY
PARKER INDORF
425-463-6802
CONTACTPHONE#
UTILITIES
DATE
PSE
"Flagging Required"
"Locates Required"
SNOHOMISH
SE 19-27-04
DESIGNED BY
Cell Phone:
REV#
Manager:COUNTY
1/4 SEC
1
32
E-Mail:
SECTION 5-05 OF THE WSDOT/APWA SPECIFICATIONS.