Loading...
ENG20170040.pdf THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/30/171/30/171/30/171/26/17 DATE 1/3 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109102248 109102248 N office N/AN/AN/A 425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307 PHONE NO PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. 1"=20' MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY N/A Owner / Developer Contact Info INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY For contacts below dial 1-888-CALL PSE (225-5773) PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION, PERMIT NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. SCALE DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND E.VOLIANSKYI D.MATULICH L.GRIFFITH STANDARD GAS CONSTRUCTION NOTES:CONTACT K.ANSON D.DAO NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. REAL ESTATE/EASEMENT N/AN/AN/A RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. N/A Vicinity Map 2" BARE STEEL IP MAIN REPLACEMENT PROJECT MGR APPROVED BYCP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY WORK N/A ENGR - GAS GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. DRAWN BY FUNCTION SITE 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING ATTN: 7800 212TH ST SW 1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK. N/A N/AN/AN/A EDMONDS, WA 98026 ___________________________, PHONE______________. Manufacturer THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. TESTED BYTESTED BY WATERWATER RETIREMENT LENGTH OF ACTUAL 163.069/164.069 N/AN/AN/A SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG INCLUDING AT OR BEYOND THE CONNECTION POINTS. SYSGGPM Order # GAS WK CTR TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 45 109102248108595816 425-766-1307 NITROGENNITROGEN PLAT MAP Act Lgth GAS MAIN INSTALLATION/RETIREMENT FF 45 PSIG RETIREMENT GAS MAIN PRESSURE & TESTING LENGTH OF SAP BATCH YEAR & FOOTAGE PROPOSED PP DESCRIPTION OPERATING STANDARD 2525.2500.Est Length BOX (TEST LEAD) INSTALLATION. FOOTAGE BETWEEN FITTINGS.58'12'43'25'12' TEST RESULTSTEST RESULTS INFORMATION ON D-4 CARD)FIELD NOTES: 160.068/164.068 START TIMESTART TIME AIRSTOP TIMEAIRSTOP TIMESYS MAOP N/AN/AN/A Notification # Yes NoYes No ORIGINAL 4&5 Project Manager Contact Information: YEAR 11271995 Emer Sect KEVIN ANSON Type MPE STWSTWSTW PEOP MAP BY lisa.griffith@pse.com SOAPSOAP LISA GRIFFITH / / / / / / / / 425-424-6472 Pipe Size 60CONTACTPHONE# UTILITIES Service/MeterService/MeterService/MeterService/Meter SAP Superior ORIGINAL Dis. Reg. / FT SVC Replace DATE 2"6"2"2"6"HP Svc/MSA Ind. ServiceSE-19-27-04/NE 3PSE Retirement "Flagging Required" JOB "Locates Required" PROJECT PHASE Ind. MSA 10.11.12.13.14.15.17. 18.DESIGN PRESS DESIGNED BY 1.2.3.4.5.6.7.8.9. KING Type/Work TYPE TESTTYPE TEST PRESSURE PRESSURE INSTALLINSTALL 2023 03/10 RETIRERETIRERETIREDATE OFFDATE OFF Cell Phone: DATE ONDATE ON REV# Manager: COUNTY 1/4 SEC 1 32 E-Mail: MATERIAL RETIRED GAS RETIRED SIZE OF FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER MAIN PROJECT CONTACT INFORMATION: Completed post installation inspection per GOS 2525.1200 and 2525.2700. (CHECK BOX TO CONFIRM COMPLETION) Recorded all required information on the as-built per GOS 2500.1700. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER Foreman's Name (printed) ___________________________________ INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND Foreman's Signature________________________________________ KEY TO SERVICE ACTION Company: InfraSource Construction Date ______________ Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES david.matulich@pse.com INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSEMAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED david.lima@pse.comlisa.griffith@pse.com PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. DAVE MATULICH Reviewed and complied with all construction notes. LISA GRIFFITH REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.206-396-0691425-214-3020425-424-6472 REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. Left the work area in a clean and safe condition. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.DAVID LIMA REPLACEMENT CONSTRUCTION NOTES LENGTH CONSTRUCTION QUESTIONS: PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. SHALL BE CONTACTED: REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. BILLING QUESTIONS: CONST MANAGER: CELL: FIELD DESIGNER: CELL: CELL: EMAIL: EMAIL: PROJ MANAGER: EMAIL: BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. FITTER'S CHECKLIST DEPTH T&T T&T### STANDARD IP & LP GAS # HOLE HOG TABLE # # 4680 06/11 PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500. ##### LOCATION LEGEND ACTIVE SERVICES TO BE REPLACED DENOTED BY: PER PSE GAS OPERATING STANDARD 2550.1600. GAS OPERATING STANDARD 2525.2300. STANDARDS 2525.2100 AND 2525.3600. ABANDONMENT OR DEACTIVATION. STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART ENDENDENDENDENDENDENDENDEND CALLOUT BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19 OUTAGE. BP1BP2BP3BP4BP5BP6BP7BP8BP9 10.11.12.13. 14.15. 1.2.3.4.5.6.7.8.9. THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/30/171/30/171/30/171/26/17 DATE 2/3 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109102248 N/AN/AN/A 425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307 PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE E.VOLIANSKYI D.MATULICH L.GRIFFITH CONTACT K.ANSON D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 2" BARE STEEL IP MAIN REPLACEMENT PROJECT MGR APPROVED BYCP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING 7800 212TH ST SW EDMONDS, WA 98026 163.069/164.069 N/AN/AN/A SYSGGPM GAS WK CTR PLAT MAP ƒğźƓ ŅĻĻķ ŅƚƩ ƷŷĻ ğƩĻğͲ ƷŷĻ ƌƚĭğƷźƚƓ ƚŅ DESCRIPTION ĭğƓƓƚƷ ƚĭĭǒƩ ǒƓƷźƌ ǞğƩƒĻƩ ǞĻğƷŷĻƩͲ ROAD CROSS SECTION ROAD CROSS SECTION 160.068/164.068 N/AN/AN/A Yes NoYes No 4&5 Project Manager Contact Information: Emer Sect Scale: N.T.S. Scale: N.T.S. OP MAP BY lisa.griffith@pse.com ŅƩƚƒ ƷŷĻ ƚǒƷƌĻƷ ƚŅ w{ΏЊЋЉЍ͵ LISA GRIFFITH 425-424-6472 CONTACTPHONE# UTILITIES DATE SE-19-27-04/NE 3PSE "Flagging Required" "Locates Required" DESIGNED BY KING Cell Phone: REV# Manager: COUNTY 1/4 SEC 1 32 E-Mail: B A The valve #05009 at 30'ncl, 20'wcl is an position when construction is finished. ES valve separating sections 4&5. Valve should be in the OPEN ALL MEASUREMENTS ARE Scale: N.T.S. FROM MONUMENT C/L DETAIL VIEW 1 B B 7729 A IP GAS FLOW 78TH AVE W SCALE: 1" = 20'-0" PLOT PLAN A 1 IP GAS FLOW W S T KEY FOR PITS S H T 2 1 2 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/30/171/30/171/30/171/26/17 DATE 3/3 PAGE SAP Sup Order Nbr Drawing Number CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG EDMONDS 109102248 N/AN/AN/A 425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307 PHONE NO 1"=20' For contacts below dial 1-888-CALL PSE (225-5773) PERMIT SCALE E.VOLIANSKYI D.MATULICH L.GRIFFITH CONTACT K.ANSON D.DAO REAL ESTATE/EASEMENT N/AN/AN/A N/A 2" BARE STEEL IP MAIN REPLACEMENT PROJECT MGR APPROVED BYCP APPROVAL JOINT FACILITIES ARRANGEMENTS CHECKED BY ENGR - GAS DRAWN BY FUNCTION MAPPING 7800 212TH ST SW EDMONDS, WA 98026 163.069/164.069 N/AN/AN/A SYSGGPM GAS WK CTR PLAT MAP DESCRIPTION 160.068/164.068 N/AN/AN/A Yes NoYes No 4&5 Project Manager Contact Information: Emer Sect OP MAP BY lisa.griffith@pse.com LISA GRIFFITH 425-424-6472 CONTACTPHONE# UTILITIES DATE SE-19-27-04/NE 3PSE "Flagging Required" "Locates Required" DESIGNED BY KING Cell Phone: REV# Manager: COUNTY 1/4 SEC 1 32 E-Mail: SAP# 109102248 BYPASS MATERIALS 45 44 43 42 41 40 23 22 21 20 19 18 2 TEE SERVICE PUNCH 1/2" X 5/8" PE OUTLET7800575 17 16 10' CP WIRE #10 TEST LEAD8500930 1 157800776 HDPE FUSION TAPPING TEE 1-1/4" X 5/8" (GAUGE TEE) 14 1 REDUCER 2" X 1-1/4" MPE7200399 13 1 BOX COMPLETE 1" THRU 4" POLYVALVES9996260 12 1 BOX SUPPORT 2" POLYVALVE9996257 111 VALVE 2" MPE5600259 10 1 TRANSITION FITTING 2"7800809 9 1 CP TEST LEAD BOX COMPLETE5000307 8 1 TEE 2" SERVICE H-175017800711 7 1 BOLT KIT, 8" 15FVX, (UNINSULATED)5000097 6 1 FLANGE, WELD NECK, 6" CLASS 1506400440 5 1 7600782 STOPPER 6" X 150 STD SHORT STOPPER H-17275 T/W 4 58' 8500940 WIRE #14 TRACING 3 10' PIPE 2" MPE STRAIGHT7000263 58' 2 PIPE 2" MPE COIL7000261 1 12' PIPE 6" X .280" STW (FBE, X42)9995862 QTY ITEMDESCRIPTIONPART NO. BILL OF MATERIAL