THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
1/30/171/30/171/30/171/26/17
DATE
1/3
PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109102248
109102248
N
office
N/AN/AN/A
425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307
PHONE NO
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
1"=20'
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
N/A
Owner / Developer Contact Info
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
For contacts below dial 1-888-CALL PSE (225-5773)
PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING
CONSTRUCTION,
PERMIT
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
SCALE
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
E.VOLIANSKYI
D.MATULICH
L.GRIFFITH
STANDARD GAS CONSTRUCTION NOTES:CONTACT
K.ANSON
D.DAO
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
REAL ESTATE/EASEMENT
N/AN/AN/A
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
N/A
Vicinity Map
2" BARE STEEL IP MAIN REPLACEMENT
PROJECT MGR
APPROVED BYCP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
WORK
N/A
ENGR - GAS
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
DRAWN BY
FUNCTION
SITE
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.MAPPING
ATTN:
7800 212TH ST SW
1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.
N/A
N/AN/AN/A
EDMONDS, WA 98026
___________________________, PHONE______________.
Manufacturer
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
TESTED BYTESTED BY
WATERWATER
RETIREMENT
LENGTH OF
ACTUAL 163.069/164.069
N/AN/AN/A
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
INCLUDING AT OR BEYOND THE CONNECTION POINTS.
SYSGGPM
Order #
GAS WK CTR
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
45 109102248108595816
425-766-1307
NITROGENNITROGEN
PLAT MAP
Act Lgth
GAS MAIN INSTALLATION/RETIREMENT
FF
45 PSIG
RETIREMENT GAS MAIN PRESSURE & TESTING
LENGTH OF
SAP BATCH YEAR & FOOTAGE PROPOSED
PP
DESCRIPTION
OPERATING STANDARD 2525.2500.Est Length
BOX (TEST LEAD) INSTALLATION.
FOOTAGE BETWEEN FITTINGS.58'12'43'25'12'
TEST RESULTSTEST RESULTS
INFORMATION ON D-4 CARD)FIELD NOTES:
160.068/164.068
START TIMESTART TIME
AIRSTOP TIMEAIRSTOP TIMESYS MAOP
N/AN/AN/A
Notification #
Yes NoYes No
ORIGINAL 4&5
Project Manager Contact Information:
YEAR
11271995
Emer Sect
KEVIN ANSON
Type
MPE
STWSTWSTW
PEOP MAP
BY
lisa.griffith@pse.com
SOAPSOAP
LISA GRIFFITH
/ / / / / / / /
425-424-6472
Pipe Size
60CONTACTPHONE#
UTILITIES
Service/MeterService/MeterService/MeterService/Meter
SAP Superior
ORIGINAL Dis. Reg. / FT
SVC Replace
DATE
2"6"2"2"6"HP Svc/MSA
Ind. ServiceSE-19-27-04/NE 3PSE
Retirement
"Flagging Required"
JOB
"Locates Required"
PROJECT PHASE
Ind. MSA
10.11.12.13.14.15.17.
18.DESIGN PRESS DESIGNED BY
1.2.3.4.5.6.7.8.9.
KING
Type/Work
TYPE TESTTYPE TEST
PRESSURE
PRESSURE
INSTALLINSTALL
2023 03/10
RETIRERETIRERETIREDATE OFFDATE OFF Cell Phone:
DATE ONDATE ON
REV#
Manager:
COUNTY
1/4 SEC
1
32
E-Mail:
MATERIAL
RETIRED
GAS
RETIRED
SIZE OF
FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER
MAIN
PROJECT CONTACT INFORMATION:
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
(CHECK BOX TO CONFIRM COMPLETION)
Recorded all required information on the as-built per GOS 2500.1700.
MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER Foreman's Name (printed) ___________________________________
INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
Foreman's Signature________________________________________
KEY TO SERVICE ACTION Company: InfraSource Construction Date ______________
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR
INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES david.matulich@pse.com
INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSEMAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300,
2525.3400
NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
david.lima@pse.comlisa.griffith@pse.com
PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
DAVE MATULICH
Reviewed and complied with all construction notes.
LISA GRIFFITH
REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.206-396-0691425-214-3020425-424-6472
REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
Left the work area in a clean and safe condition.
REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.DAVID LIMA
REPLACEMENT CONSTRUCTION NOTES
LENGTH
CONSTRUCTION QUESTIONS:
PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
SHALL BE CONTACTED:
REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
BILLING QUESTIONS:
CONST MANAGER: CELL: FIELD DESIGNER: CELL: CELL:
EMAIL: EMAIL: PROJ MANAGER: EMAIL:
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
FITTER'S CHECKLIST
DEPTH
T&T
T&T###
STANDARD IP & LP GAS
#
HOLE HOG TABLE
#
#
4680 06/11
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.
#####
LOCATION
LEGEND
ACTIVE SERVICES TO BE REPLACED DENOTED BY:
PER PSE GAS OPERATING STANDARD 2550.1600.
GAS OPERATING STANDARD 2525.2300.
STANDARDS 2525.2100 AND 2525.3600.
ABANDONMENT OR DEACTIVATION.
STARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTARTSTART
ENDENDENDENDENDENDENDENDEND
CALLOUT
BP10BP11BP12BP13BP14BP15BP16BP17BP18BP19
OUTAGE.
BP1BP2BP3BP4BP5BP6BP7BP8BP9
10.11.12.13.
14.15.
1.2.3.4.5.6.7.8.9.
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/30/171/30/171/30/171/26/17
DATE
2/3
PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109102248
N/AN/AN/A
425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
E.VOLIANSKYI
D.MATULICH
L.GRIFFITH
CONTACT
K.ANSON
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
2" BARE STEEL IP MAIN REPLACEMENT
PROJECT MGR
APPROVED BYCP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION
MAPPING
7800 212TH ST SW
EDMONDS, WA 98026
163.069/164.069
N/AN/AN/A
SYSGGPM
GAS WK CTR
PLAT MAP
ƒğźƓ ŅĻĻķ ŅƚƩ ƷŷĻ ğƩĻğͲ ƷŷĻ ƌƚĭğƷźƚƓ ƚŅ
DESCRIPTION
ĭğƓƓƚƷ ƚĭĭǒƩ ǒƓƷźƌ ǞğƩƒĻƩ ǞĻğƷŷĻƩͲ
ROAD CROSS SECTION
ROAD CROSS SECTION
160.068/164.068
N/AN/AN/A
Yes NoYes No
4&5
Project Manager Contact Information:
Emer Sect
Scale: N.T.S.
Scale: N.T.S.
OP MAP
BY
lisa.griffith@pse.com
ŅƩƚƒ ƷŷĻ ƚǒƷƌĻƷ ƚŅ w{ΏЊЋЉЍ͵
LISA GRIFFITH
425-424-6472
CONTACTPHONE#
UTILITIES
DATE
SE-19-27-04/NE 3PSE
"Flagging Required"
"Locates Required"
DESIGNED BY
KING
Cell Phone:
REV#
Manager:
COUNTY
1/4 SEC
1
32
E-Mail:
B
A
The valve #05009 at 30'ncl, 20'wcl is an
position when construction is finished.
ES valve separating sections 4&5.
Valve should be in the OPEN
ALL MEASUREMENTS ARE
Scale: N.T.S.
FROM MONUMENT C/L
DETAIL VIEW
1
B
B
7729
A
IP GAS FLOW
78TH AVE W
SCALE: 1" = 20'-0"
PLOT PLAN
A
1
IP GAS FLOW
W
S
T
KEY FOR PITS
S
H
T
2
1
2
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES 1/30/171/30/171/30/171/26/17
DATE
3/3
PAGE
SAP Sup Order Nbr
Drawing Number
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
EDMONDS
109102248
N/AN/AN/A
425-424-6472425-424-6428425-424-6426425-214-3020425-766-1307
PHONE NO
1"=20'
For contacts below dial 1-888-CALL PSE (225-5773)
PERMIT
SCALE
E.VOLIANSKYI
D.MATULICH
L.GRIFFITH
CONTACT
K.ANSON
D.DAO
REAL ESTATE/EASEMENT
N/AN/AN/A
N/A
2" BARE STEEL IP MAIN REPLACEMENT
PROJECT MGR
APPROVED BYCP APPROVAL
JOINT FACILITIES ARRANGEMENTS
CHECKED BY
ENGR - GAS
DRAWN BY
FUNCTION
MAPPING
7800 212TH ST SW
EDMONDS, WA 98026
163.069/164.069
N/AN/AN/A
SYSGGPM
GAS WK CTR
PLAT MAP
DESCRIPTION
160.068/164.068
N/AN/AN/A
Yes NoYes No
4&5
Project Manager Contact Information:
Emer Sect
OP MAP
BY
lisa.griffith@pse.com
LISA GRIFFITH
425-424-6472
CONTACTPHONE#
UTILITIES
DATE
SE-19-27-04/NE 3PSE
"Flagging Required"
"Locates Required"
DESIGNED BY
KING
Cell Phone:
REV#
Manager:
COUNTY
1/4 SEC
1
32
E-Mail:
SAP# 109102248
BYPASS MATERIALS
45
44
43
42
41
40
23
22
21
20
19
18
2
TEE SERVICE PUNCH 1/2" X 5/8" PE OUTLET7800575
17
16
10'
CP WIRE #10 TEST LEAD8500930
1
157800776
HDPE FUSION TAPPING TEE 1-1/4" X 5/8" (GAUGE TEE)
14
1
REDUCER 2" X 1-1/4" MPE7200399
13
1
BOX COMPLETE 1" THRU 4" POLYVALVES9996260
12
1
BOX SUPPORT 2" POLYVALVE9996257
111
VALVE 2" MPE5600259
10
1
TRANSITION FITTING 2"7800809
9
1
CP TEST LEAD BOX COMPLETE5000307
8
1
TEE 2" SERVICE H-175017800711
7
1
BOLT KIT, 8" 15FVX, (UNINSULATED)5000097
6
1
FLANGE, WELD NECK, 6" CLASS 1506400440
5
1
7600782
STOPPER 6" X 150 STD SHORT STOPPER H-17275 T/W
4
58'
8500940
WIRE #14 TRACING
3
10'
PIPE 2" MPE STRAIGHT7000263
58'
2
PIPE 2" MPE COIL7000261
1
12'
PIPE 6" X .280" STW (FBE, X42)9995862
QTY
ITEMDESCRIPTIONPART NO.
BILL OF MATERIAL