Loading...
ENG20170170.pdf4c� CATYF EDMONDS1215THAVENUENORTH- EDMONDS, WA 98020 1)4 PHONE: (425) 771-0220 - FAX: (425) 771-0221 *PERMIT MUST BE AVAtLABLE ON SITE TATUS: ISSUED ENG20170170 0170 107 5TH AVE N#101 EDMONDS, WA 98020' L REA SON FOR OCCUPYING THE P. TEMPORARY USE OF 3 HR PARKING, FOR DELIVERY Date of proposed use: 05/01/2017 Hours 'ofuse: CONDITIONS None This Permit allows for extended use of time restricted -three hour parking spaces. Issuance of this permit doesn not allow for parking in areas with yellow painted curbing, ADA accessible spaces, fire lanes, or any location deemed unsafe, or unsuitable by the Traffic Engineer or Police Department. 10 a 14 Vol 111114 SINA I 1 The City will not be responsible for reserving spaces for your use. You may place signs on the sidewalk; (maintaining a, minimum, of44"clear travel area for pedestrians) up to 72 hours in advance ofthe lime you will be using the parking spaces, noting the date and times the spots will be in use. In addition, the City will not be responsible for enforcement or removal ofvehicles or for any costs related thereto. 2. You may place cones to reserve the spots any time after12:01' a.m. on the day you will be using the spaces. 3. You or your agent are not authorised to tow vehicles that encroach upon the reserved parking spaces., 4. The maximum allowable on -street parking use shall be eight hours, The hours ofuse may be between, 6:00 a.m. and 10:00 p.m. 5. A maximum of three parking spaces (sixty lineal feet) may be reserved. 7ATION IS NOTA PERMITUNTTL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY i Printed: Monday, M2X 01, 2017 TE FILE COPY ❑ POLICE DEPT. F APPLICANT COPY V T,1�1166, EXTENDED ON STREET PARKING PERMIT (For extended use of time -restricted three- hour parking spaces) .. /� DATE OF APPLICATION: APPLICANT NAME: Phone _ [ Y e6 APPLICANT MAILING ADDRESS: t O Z ' "' G or> �s STATE MOVING COMPANY NAME: Phone OR REASON FOR OCCUPYING THE SPACE(S): ADDRESS OF ON STREET PARKING: DATE OF PROPOSED USE: / HOURS OF PROPOSED USE: 2- ® Z SITE MAP: ENGINEERING: ❑ Approve ❑ Deny Initial Date Page 1