ENG20180138 - Edmonds permit extension request.msg
IPM.Note
ENG20180138 - Edmonds permit extension request
Rivera, Chris
Zwar, Lynette
Rivera, Chris
SMTP
LKZwar@Snopud.com
ENG20180138 - Edmonds permit extension request
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=RIVERA, CHRIS97C
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=RIVERA, CHRIS97C
Received: from barracuda.edmondswa.gov (192.168.100.38) by
EDMSVR-EXCH02.edmonds.local (10.10.3.20) with Microsoft SMTP Server id
14.3.408.0; Thu, 13 Sep 2018 13:33:56 -0700
X-ASG-Debug-ID: 1536870835-093252132339120001-m3JoLM
Received: from mail.snopud.com (mail.snopud.com [139.138.102.25]) by
barracuda.edmondswa.gov with ESMTP id 9Y2SPBedVZhDY4Zu (version=TLSv1
cipher=AES128-SHA bits=128 verify=NO); Thu, 13 Sep 2018 13:33:55 -0700 (PDT)
X-Barracuda-Envelope-From: LKZwar@Snopud.com
X-Barracuda-Effective-Source-IP: mail.snopud.com[139.138.102.25]
X-Barracuda-Apparent-Source-IP: 139.138.102.25
X-Barracuda-User-Whitelist: christina.wayland@edmondswa.gov
X-Barracuda-User-Whitelist: chris.rivera@edmondswa.gov
Received: from MBXP01.snopud.com ([fe80::1c0f:af:8eb2:d09a]) by
HUBCASP02.snopud.com ([::1]) with mapi id 14.03.0382.000; Thu, 13 Sep 2018
13:33:55 -0700
From: "Zwar, Lynette" <LKZwar@Snopud.com>
To: "'Rivera, Chris'" <Chris.Rivera@edmondswa.gov>, "'Wayland, Christina'"
<Christina.Wayland@edmondswa.gov>
X-Barracuda-User-Whitelist: chris.rivera@edmondswa.gov
X-Barracuda-User-Whitelist: christina.wayland@edmondswa.gov
CC: "Lawson, Debra" <DALawson@SNOPUD.com>, Joint Use <JointUse@SNOPUD.com>
Subject: ENG20180138 - Edmonds permit extension request
Thread-Topic: ENG20180138 - Edmonds permit extension request
X-ASG-Orig-Subj: ENG20180138 - Edmonds permit extension request
Thread-Index: AdRLn9nrr+418kqMTf6PryCCh2IAZw==
Date: Thu, 13 Sep 2018 20:33:54 +0000
Message-ID: <0CB48831ECC2194EAF7D63E9179F849D179DD658@MBXP01.snopud.com>
Accept-Language: en-US
Content-Language: en-US
X-MS-Has-Attach: yes
X-MS-TNEF-Correlator:
x-originating-ip: [192.168.133.46]
Content-Type: multipart/mixed;
boundary="_004_0CB48831ECC2194EAF7D63E9179F849D179DD658MBXP01snopudcom_"
MIME-Version: 1.0
X-Barracuda-Connect: mail.snopud.com[139.138.102.25]
X-Barracuda-Start-Time: 1536870835
X-Barracuda-Encrypted: AES128-SHA
X-Barracuda-URL: https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi
X-Barracuda-BRTS-Status: 1
X-Virus-Scanned: by bsmtpd at edmondswa.gov
X-Barracuda-Scan-Msg-Size: 6941
Return-Path: LKZwar@Snopud.com
X-MS-Exchange-Organization-AuthSource: EDMSVR-EXCH02.edmonds.local
X-MS-Exchange-Organization-AuthAs: Internal
X-MS-Exchange-Organization-AuthMechanism: 10
Zwar, Lynette
SMTP
LKZwar@Snopud.com
Lawson, Debra; Joint Use
Rivera, Chris; Wayland, Christina
ENG20180138 - Edmonds permit extension request
Good Afternoon,
We are asking for a permit extension for ENG20180138 (WO 100021799) to be extended 6 months. The approved permit already has an approved City traffic plan for closing the roadway. (The
crane will set up at the beginning of work, crane out the transformer, then leave.) This hasn’t changed. The job description and timeframe have changed. See details below:
Job Description
Maintenance to existing padmount transformer and install of new padmount transformer for customer. Work will be done with a crane set up in existing loading dock with closure of northbound
land of 2nd Ave N for safety. Lane closure will be for approx. 2-4 hours. Building has generator so no outage expected. Job is estimated to take approx. 16 hrs. Work will begin at
approx. 9am on a normal work day M-F and worked until complete. Work will be performed on a Sunday and will begin at approx. 6am and worked until complete.
Reason for Change
The reason for the extension is that the customer is not yet ready for the transformer. Their construction timelines were pushed out by his delays. The work day changed to Sunday because
the Post Office won’t allow us to block their loading dock during business hours. The transformers are located behind the Post Office loading dock and there is no other access. The
Post Office requires access to the dock Monday through Saturday.
Please let us know if you have questions! Thanks
Lynette Zwar
Joint Use & Permit Coordinator
Public Utility District No. 1 of Snohomish County
425-783-5610
425-267-6163 fax
LKZwar@snopud.com
ECA2B694EFDAB84295556F20CD2194AD@ci.edmonds.wa.us
<0CB48831ECC2194EAF7D63E9179F849D179DD658@MBXP01.snopud.com>
Rivera, Chris
Rivera, Chris
LKZwar@Snopud.com
LKZwar@Snopud.com
en-US
EDMSVR-EXCH02.edmonds.local
Internal
10
BT=0;II=01D44B9FD9EBAFEE35F24A8C4DFE8FAF208287620067;FIXUP=0.759;Version=Version 14.3 (Build 408.0), Stage=H4
https://barracuda.edmondswa.gov:443/cgi-mod/mark.cgi
1536870835-093252132339120001-m3JoLM
Chris.Rivera@edmondswa.gov
00000002/o=City of Edmonds/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=Rivera, Chris97c
Rivera, Chris
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Rivera, Chris97c
Chris.Rivera@edmondswa.gov
Rivera, Chris
Wayland, Christina
EX
/O=CITY OF EDMONDS/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=Wayland, Christina7f0
Christina.Wayland@edmondswa.gov
Wayland, Christina
Lawson, Debra
SMTP
DALawson@SNOPUD.com
DALawson@SNOPUD.com
Lawson, Debra
Joint Use
SMTP
JointUse@SNOPUD.com
JointUse@SNOPUD.com
Joint Use
201809131303.pdf
.pdf
201809~1.pdf
201809131303.pdf
application/pdf
1F58231AF8D90A4DADA287113BEE25C7@ci.edmonds.wa.usGood Afternoon,
We are asking for a permit extension for ENG20180138 (WO 100021799) to be extended 6 months. The approved permit already has an approved City traffic plan for closing the roadway. (The
crane will set up at the beginning of work, crane out the transformer, then leave.) This hasn’t changed. The job description and timeframe have changed. See details below:
Job Description
Maintenance to existing padmount transformer and install of new padmount transformer for customer. Work will be done with a crane set up in existing loading dock with closure of northbound
land of 2nd Ave N for safety. Lane closure will be for approx. 2-4 hours. Building has generator so no outage expected. Job is estimated to take approx. 16 hrs. Work will begin at
approx. 9am on a normal work day M-F and worked until complete. Work will be performed on a Sunday and will begin at approx. 6am and worked until complete.
Reason for Change
The reason for the extension is that the customer is not yet ready for the transformer. Their construction timelines were pushed out by his delays. The work day changed to Sunday because
the Post Office won’t allow us to block their loading dock during business hours. The transformers are located behind the Post Office loading dock and there is no other access. The
Post Office requires access to the dock Monday through Saturday.
Please let us know if you have questions! Thanks
Lynette Zwar
Joint Use & Permit Coordinator
Public Utility District No. 1 of Snohomish County
425-783-5610
425-267-6163 fax
HYPERLINK "mailto:LKZwar@snopud.com"LKZwar@snopud.com