ENG20190232 ROW Permit.pdfO', M
°�° CITY OF EDMONDS
121 5TH AVENUE NORTH - EDMONDS, WA 98020
a PHONE: (425) 771-0220 - FAX: (425) 771-0221
n�. tad
*PERMIT MUST BE POSTED ON JOBSnE*
STATUS: ISSUED ENG20190232
RIGHT OF WAY PERMIT (6-EUC)
Permit Number: ENG20190232 Expiration Date: 12/11 /2019
Job Address: 715 3RD AVE S, EDMONDS Location: 715 3rd Ave S
SNOHOMISH COUNTYPUD SNOHOMISH COUNTY PUD
P.O. BOX 1107 P.O. BOX 1107
EVERETT, WA 98206 EVERETT, WA 98206
(425)670-3216
LICENSE #: UBL• 313 005 741 EXP-
PUD needs to replace a 12kV switch. Traffic will be shifted allowing for continues flow, in order to park trucks during construction.
DISRUPTION INFORMATION
ASSESSED VALUE: $0.00 PROPERTY AREA: 0
SIDEWALK: (OXO) DURATION IN MONTHS: 0 FEE: $0.00 STREET DISRUPTION TRENCH CUT: ( 0 X 0 )
PARKING: ( OXO) DURATION IN MONTHS: 0 FEE: $0.00 YEAR OF OVERLAY: 0 FEE: $0.00
ALLEY: ( OXO) DURATION IN MONTHS: 0 FEE: $0.00
INDEMNITY- The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries,
damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and
attorney fees by reason ofgranting this permit.
THECONTRACTOR IS RESPONSIBLEFOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONEYEAR FOLLOWING THEFINAL
INSPECTION AND ACCEPTANCE OF THE W O RK.
• Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger mast
be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their
possesion.
• Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved
material prior to the end of the workday- NO EXCEPTIONS.
• Three sets of construction drawings of proposed work are required with the permit application.
CALLDIAIrA-DIG(1-800424-5555) BEFORE ANY EXCAVATION
CALL FOR INSPECTION (425) 771-0220 EXT.1326
24 HO UR NO TICE REQ UIRED FO R ALL INSPECTIO N REQ UESTS
THIS APPLICATION IS NOTA PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPTIS ACKNOWLEDGED IN
SPACE PROVIDED.
Printed: Tuesday. June 11.201
L:niS LV llfrcl _
:40101
BY
DATE
❑ FILE COPY ❑ INSPECTOR COPY APPLICANT COPY
STATUS: ISSUED
ENG2O19O232
• Restore ROW to City standards
• Restore Landscape to like or better conditions.
Alert affected residents and/or businesses prior to work start.
+ Conform to approved working drawings and Traffic Control plan.
• Maintain erosion & sedimentation control. Keep street clean.
• Call for required inspections as noted.
• Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
• Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fromthe noise limits
ofECC Chapter 5.30 only during the hours of 7:00amto 6:OOpmon weekdays and 10:00amand 6:00pmon Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his orher spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly fromthe issuance of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance not linfit in any way the City's ability to enforce any ordinance
provision.
• E-Traffic Control
+ &Engineering Final
PARTIAL INSPECTION DATE: INITIAL: NOTES:
PARTIAL INSPECTION DATE: INITIAL: NOTES:
FINAL INSPECTION APPROVED DATE: INITIAL:
of EDA'10
ROW PERMIT NO.: ENGl`J t '2 7,�'
ISSUE DATE: 6 i
RIGHT-OF-WAY CONSTRUCTION RECEIVED
PERMIT APPLICATION MAY 24 2019
PROJECT NAME: Replace inertia switch
CONTACT: Mike Lauer ENGINEERING DIVISION
CONTRACTOR:
Plione #: (425) 783-5154
Mailing Address:
Fax #:
State License #:
Entail #: MRLauer @snopud.com
City Business License #:
❑ Liability Insurance ❑ Bouded
ADDRESS OR INTERSECTION OF CONSTRUCTION:
715 3RD AVE S Edmonds
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE_ OF PROJECT:
Coinmercial Subdivision City Project Traffic Control (Only)
❑ Multi -Family ❑ Single Family ❑ Otlier
d EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket perinit? ❑ Yes
❑ No
ANY ASSOCIATED PERMITS? BLD#—
_ ENG#_
DESCRIPTION OF PROPOSED WORD (Re Specific) : PUD needs to replace a 12kV switch._
100fif- LMILL f'r¢pk��b
�-ta-e���nso ���]►10Ju�, F+au7
park trucks during construction.
WAS STREET OVERLAYED WITHIN THE LAST FIVE 5) YEARS? YES 0 NO ❑ Year:
PAVEMENT CUT: ❑ Yes ❑ No If yes, indicate size of cut:
CONCRETE CUT: ❑ Yes ❑ No If yes, indicate size of cut:
x
-- -._--x
RIGHT-OF-WAY
AREA
CLOSURE
TOTAL
DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + LF
X
LF
SF
Alley 72 Hrs + LF
X
X
LF
LF
SF
Parking 72 Hrs + LF
SF
APPLICANT TO READ AND SIGN
"Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
'Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday —NO EXCEPTIONS.
Indemnity. The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requirements in order for the permit to be valid.
SIGNATURE �. Ft. DATE � —�-� 1
ntra or or Agent
NO WORD SHALL BEGIN PRIOR TO PERMIT ISSUANCE
WORK IN TRAVEL LANE
(MAINTAINING TWO-WAY TRAFFIC, 35 MPH OR LESS)
W20-1
ltd —
,r
a
W1-4R -
0L
z a
� F-
a
w
U-
D
m
C9
z a
�= w
: ti3 s.,;i,v
RESUB
juN 0 6 2019
FNG�WEMG D1WWON
CIV OF EDMONM
0'
---- 0
0
O
—�u
00
0
O
10, 0 10'
MIN MIS
0
F-
Ld
ui
lY
I—
SPEED
LIMIT
SIGSPACINNG
A. B (MG)
SHIFTING
TAPER (FT)
V SHIFT 12' SHIFT
BUFFER
(FT)
55
25
200
35
65
30
200
45
90
85
35 1
350 1
65
125 1
120
s+t
' Nt9 BAQKiNG�' S 16tW S 1 n 50 P Ehc�p
1Z NO�RS tiN AWAMCf- Ofr CONS72UVlIdN
N oT t N M bAl f-i 4r 'T I M 6 0 F V $E OF FAMInl
a Kkt U-M out s► wN s 4- ftACi- Celue
uj
IZ:oran Oay or- CONS-ItwvlreN.
m
w
a
AL W1-4L
m
*..
�20-• 1
Ir
t
U
Ln
N
cc
Ln
au
u
0
0
in
al
SNOHOMISH COUNTY
n
0
TRAFFIC CONTROL PLAN - B
N
C
PIiBt U[LiiY Q15FfRCf hu �
ai
t`
PROJECT REPLACE INERTIA
SWITCH 12-5681
LOCATION 715 3RD AVE S.
EDMONDS, WA 98020-4107
ENGINEER MICHAEL LAUER
DATE 5/13/19 ORDER 100045625
a
PRONE 425-783-5154�
r
CELLULAR 425-239-0858�
-
if
PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY
LOCATION 715 3RD AVE S EDMONDS WA 98020--4107 LYNNWOODAREA
POLE No. PLI 171B NEI/4S 26 T 27 R 3 DATE 5/13/19 ORDER 100045625
REASON FOR WORK INERTIA SWITCH REPLACEMENT ENGINEER MRLAUER OPERATION 0030
12-56 1 DRAFTER. MRL U.G. NO. N/A
SCALE NTS
DATE %YORK COMPLETED
FOREMAN
FEES REQ'D ❑ YES ■ NO
\PRIMARYOVERHEAD
ESIDENTIAL
OMMERCIAL
NO. _
SE NDARY OVERHEAD
BASIC FEE S
t
METER CONV. POLE s
PRIMAR UNDERGROUND
❑ RESIDEN IAL
C7 COMMERE
BASIC FEE $
LEU NO.
S '=$
SECONDARY NDERGROUND
ASIC FEE S
APPROVED
ENG AS -BUILT VERIFICATION DATE _ DATE PRINTED
❑ PHASING, TAPS & FUSING SUBSTATION WSG/MPL
❑ POLE & VAULT STENCILS
❑ CABLE TAGS CIRCUIT NO. 12-405, PHASE 231
❑ FRAMING 12-343 231
❑ EQUIPMENT LOCATION
VERIFIED BY
DATE
NESC VIOLATIONS
■ NO CI YES (SEE NOTES)
PERMITS (DATE GRANTED)
❑ TREE TRIM
❑ STATE
❑ COUNTY
IN CITY
ENGR'S TEL. #
425-783-5154 .
ENGR'S CELL #
425--239--0858
�i
PLI 1718
❑ WSG SW 12-5681 - INERTIA
EASEMENTS CIRCUIT 12-405 N.0 G.O.
❑ REQUIRED 0 NOT REQUIRED 121
3' MPL
1 CIRCUIT 12-343
CONSTRUCTION NOTES
AO PLI 1718:
RMV EXISTING INERTIA G.O. SWITCH 12--5681
**SEE ATTACHED STANDARDS BULLETIN NO. 255 FOR HANDLING, PACKAGING
AND BAGGING INSTRUCTIONS FOR RETURNING TO THE WAREHOUSE FOR
FUTURE INSPECTION AND LEGAL REVIEW
INSTL 15KV 600A, 30 TANGENT GANG -OPERATED S&C SWITCH (12F713, D0505SC)
SEE DETAIL 1 FOR PROPOSED HANDLE MOUNTING
INSTL GREEN AND WHITE REFLECTIVE DECALS FOR YEAR MAINTAINED
ON HANDLE ABOVE SWITCH NUMBER PER NOTE 5 OF 12F713
INSTL SWITCH NUMBER BOARD #12---------- (W0201)
GROUND OP HANDLE
SWITCH TO REMAIN NORMAL OPEN
�r PO CXCANrt-710A) 'PF_R-Mj T- Co W 17k
6Ssv, ►��� p?- - Wtl, f6g-MI'1.
FQ's
DATE RELEASED
UNDERGROUND
LAT
FOREIGN CONTACTS
❑ JPN#
E3
C FEE S
FT.@S
`_$
❑ JOINT TRENCH FRONTIER & CATV
_
❑JOINT BORE FRONTIER &CATV
STREET LIGHTING
POLE STENCILING
WORK IN RIGHT
OVS
TO
❑ PRIMARYFROM
OFF POLE
❑ SECONDARYTAKE
FTAS
PRE-CONST. REQUIRMENTS
_ _(.
TREE TRIM ❑ PUD LOCATOR
MISCELLANEOUS
FED
BACKHOE 0 FLAGGING
VA❑
O ONE CALL DATE
PENo.
STREET LIGHTING
❑ YES 0 NO
$
M&R
AS -BUILT
S
GIs
TOTAL DUE S
DATE PAID
~Y
GIs QC
M&R
RECEIPT NO.
GIS Ph
JOINT USE
SERVICE ORDER NO.
LOCATION MAP PAGE 454 6F
0 EXISTING POLE
O EXISTING POLE -TO BE REMOVED
• NEW POLE
)19 NEW POLE TO REPLACE EXISTING POLE
(3) 336 AAC & (1) 3/0 AAC
BEFORE
o
WSG PLI 1718
CIRCUIT 12-405 SW 12- ________ - S&C
N.0 G.O.
2
3 0 MPL
1 50 CIRCUIT 12-123
(3) 336 AAC & (1) 3/0 AAC
AFTER
12KV SCHEMATIC
FIELD SIDE
SIVITCR ME
CONT 4
RGO
I
ROAD SIDE TRAFFIC FLOW
GANG OP SWITCH CONTROL .
ROD LOCATION DETAIL 1
NTS
SHEET 1 OF 1
a
a.
U
U
N
Lo
CD
0
O
o,
m
co
Ln
i
N
3
U
°
a
4)
af
/
to
N to
Lo
lu
a
C)
0
t
ao
Ln
1
N
/
rn
0
N
u
M
°
a
P
d
a
/
a�
J
/
0
.j
c
0
.N
to
c
OL[)
Fo
/rn
QCL
o°
rN
�Q
�a