ENG20190418 ROW Permit.pdfO,. E Dtijo�
° CITY OF EDMONDS
1215TH AVENUE NORTH - EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
*PERMIT MUST BE POSTED ON JOBSITE*
STATUS: ISSUED ENG20190418
RIGHT OF WAYPERM IT (3-Commercial)
Permit Number: ENG20190418 Expiration Date: 09/10/2019
Job Address: 307 BELL ST, EDMONDS
Location: 307 Bell St
Weisser Company LLC
CONTRACTORAPPLICANT
Weisser Company LLC
GO David Weiser
C/O David Weiser
PO Box7803
PO BOX 7803
Tacoma, WA 98417
Tacoma, WA 98417
(253)355-6418
LICENSE #: WEISSCL879DD EXP: 04/08/2021
Storing dumpster in 2 parking stalls on Edmonds St from Friday September 6th to be removed end of day Tuesday September 10th.
DISRIJPTION INFORMATION
ASSESSED VALUE: $5,267,000.00 PROPERTY AREA: 14375
SIDEWALK: (OXO) DURATION IN MONTHS: 0 FEE: $0.00 STREET DISRUPTION TRENCH CUT: ( 0 X 0 )
PARKING: (8X36) DURATION IN MONTHS: 0.06666 FEE: $270.34 YEAR OF OVERLAY: 0 FEE: WOO
ALLEY: ( OXO ) DURATION IN MONTHS: 0 FEE: $0.00
INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries,
damages or claims ofany kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any ofils departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and
attorney fees by reason ofgranting this permit.
THE CONTRACTOR IS RESPONSIBLE FOR WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONEYEAR FOLLOWING THE FINAL
INSPECTION AND ACCEPTANCE O F THE W O RK.
• Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must
be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their
possesion.
• Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved
material prior to the end of the workday- NO EXCEPTIONS.
• Three sets of construction drawings of proposed work are required with the permit application.
CALL DIALrA-DIG (1-800-424-5555) BEFOREANYEXCAVATION
CALL FOR INSPECTION (425) 771-0220 EXT.1326
24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REQUESTS
APPLICATION APPROVAL
THIS APPLICATION IS NOTA PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HIS/HER DEPUTY: AND FEES ARE PAID, AND RECEIPTIS ACKNOWLEDGED IN
SPACE PROVIDED.
Printed: Thursday, September 05, 2019
RELEASED BY
DA
FILE COPY ❑ INSPECTOR COPY EJ APPLICANT COPY
STATUS: ISSUED
ENG2O19O418
• Restore ROW to City standards
• Restore Landscape to like or better conditions.
• Call for locates of underground utilities prior to any excavation.
• Alert affected residents and/or businesses prior to work start.
• Conform to approved working drawings and Traffic Control plan.
• Verify clear bore crossings
• Utility patch restoration to be in accordance with Edmonds Standard detail E2.3
• Maintain erosion & sedimentation control. Keep street clean.
• Call for required inspections as noted.
• Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the permitted project.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and I0:00am and 6:OOpm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance
provision.
• B-Traffic Control
• E-Engineering Final
PARTIAL INSPECTION DATE:_ INITIAL: _ NOTES:
PARTIAL INSPECTION DATE: INITIAL: _ NOTES:_ _—
FINAL INSPECTION APPROVED DATE:___ INITIAL.
",t of EDAtO�
C.� 61J.
ROW PERMIT NO.: ENG `WLo(o 4-1-6
�7 ISSUE DATE:
LL
7
RIGHT-OF-WAY CONSTRUCTION
PERMIT APPLICATION
PROJECT NAME:�UC CONTACT:
CONTRACTOR: Phone #: 2 -� :
Mailing Address: Fax #:
State License #: . _
City Business License #:
ADDRESS OR INTERSECTION OF CONSTRUCTION:
Email #: ts nc(-ecDa<�:ovL—
Liabilityvin'sVrance ❑ Bonded
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only)
❑ Multi -Family ❑ Single Family
❑ EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit?
❑ Other
❑ Yes ❑ No
ANY ASSOCIATED PERMITS? BLD# ENG#
DESCRIPTION OF PROPOSED WORK (Be Specific) :
A
WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES NO Year:
PAVEMENT CUT: ❑ Yes ❑ No If yes, indicate size of cut: x
CONCRETE CUT: ❑ Yes ❑ No If yes, indicate size of cut: x
RIGHT -'OF -WAY
AREA
CLOSURE
TOTAL
DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + LF
Alley 72 Hrs + LF
Parking 72 Hrs + F
X
LF
SF
X
LF
SF
X
LF
SF
rt�
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this perm)
I have read the above
follow all requiremen
SIGNATURE
understand the permit requirements and acknowledge that I must
b, perm it to be valid.
DATE
or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
r
A •t•
r
CsWTVA CTt-g- Tb� vl Sj V x 3 G ' re2 D w-LPS-Wr- Sr,4 G in7 G
STAtZ-tiigb Fr2-IoRY SFPTFMU'r.W- 6 , -ro 6F i2F4-rDvEp TLtrsPl.}:)
SVpMMB&R- 16. 06e1r uw cl IREFLF r1;,E` Wrianv; 7b eFs PL 19
JT ALI, Cpjvv 6 5 O F pR.nP.sTf&Z -
Appllcant shall repair/replaoe all damagJ--
utilities or frontage improvements in City
"-& way per city standards that is oa
or occurs during the permitted project,
ww
m Q
cn Z_
O
!1 p
W cz)
'ri
uO
J
Q_
U
U
1— Z
C7 Q
U U
O
wcc
Z LU
AF'P OVEt7 AS NOTED
Griggs, Natalie
From: Doug Spee <DSpee@speewest.com>
Sent: Wednesday, September 4, 2019 9:56 AM
To: David Weisser; Griggs, Natalie
Subject: RE: Dumpster location
Perfect location.
Thanks,
Doug Spee
307 Bell Street, Edmonds, WA 98020 Office: 206-284-7733 Fax: 206-625-0770
From: David Weisser <dweisser@weisserco.com>
Sent: Wednesday, September 4, 2019 9:26 AM
To: Natalie Griggs <natalie.griggs@edmondswa.gov>; Doug Spee <DSpee@speewest.com>
Subject: Re: Dumpster location
Doug,
Per our conversation yesterday, see attached image, showing the location
of where we will place our job site dumpster.
Can you confirm that this is acceptable to you???
David Weisser I Principal
253.355.6418
vcard
weisserco.com
WEISSER
On Tue, Sep 3, 2019 at 4:11 PM David Weisser <dweisser@weisserco.com> wrote:
1