Eng-Comments-Email-12-16-2019.pdfFrom:
McConnell, Jeanie
To:
"Jenelle Taflin"
Cc:
Jason Green; Zulauf, JoAnne; DeLilla, Mike; Richardson, Zachary
Subject:
RE: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Date:
Monday, December 16, 2019 4:49:59 PM
Good afternoon Jenelle,
Thanks for the phone call. Again, my apologies for the delay in responding to you. As I mentioned,
we are in the process of implementing a new permit system and it has set us all back a bit.
JoAnne, Mike and I were able to meet to discuss the recent submittal for the subject project and
there are still some major utility conflicts that need to be worked through. At this point, we are
asking you to take a look at shifting some of the utilities over to 212th, instead of bringing them all in
off 72nd. We can't guarantee the feasibility of routing utilities off of 212th and additional work will
need to be done on your end to determine this. At this point, however, we are not able to approve
what has been submitted for connections on 72nd
I have included below a few of Mike DeLilla's comments to give some insight on what has been
discussed amongst City staff.
• All infrastructure needs to be shown to scale on the plans. The latest submittal indicates an
RP pad that is smaller than that which is required. In addition, screening may be required by
the Planning Division, which would require additional space.
• The fire hydrant is being placed between the two large gas mains that from the drawings
are less than 2 feet apart (outside to outside), which means that the fire hydrant cannot fit
there.
• A minimum 1' separation has not been achieved for the water service prior to it entering
the vault, which has the potential of driving the waterline much deeper, since the City's and
Lynnwood's sewer pipes would likely conflict. Also the vault has minimum clearances, which
will drive the elevation in and out of the vault. This will affect also the size of the vertical
thrust blocks needed for the RP and runs the risk of being adjacent and/or encasing part of
the new sewer.
• Any 90 degree bends on the water system will require thrust blocking against undisturbed
soil.
Per City standard detail WA-131, use of a 1 %" or 2" meter will require a 2" service line from
the main to the meter.
These comments are not all inclusive as the City is requesting a redesign of the utility system
connections. Additional comments may be provided once a redesign is submitted to the City for
review.
Please let us know if you have further questions. We are happy to engage in some back and forth
discussions prior to your next submittal.
Regards,
Jeanie
From: Jenelle Taflin <jtaflin@navixeng.com>
Sent: Friday, December 13, 2019 2:13 PM
To: Zulauf, JoAnne <JoAnne.Zulauf@edmondswa.gov>; DeLilla, Mike
<Mike.DeLilla@edmondswa.gov>
Cc: McConnell, Jeanie <Jeanie.McConnell @edmondswa.gov>; Jason Green <jgreen@navixeng.com>
Subject: RE: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Hi everyone,
Checking back in on this. We would like to be able to complete our plans and resubmit as soon as
possible. Any idea when we will receive feedback on our proposed utility revisions (see attached
original email from 11/19)? Thank you for your help!
Jenelle Taflin, P.E., LEED AP
Navix Engineering
d: 425.458.7896 1 c: 206.251.2842
From: Jenelle Taflin
Sent: Tuesday, December 10, 2019 10:02 AM
To: Zulauf, JoAnne <JoAnne.ZulaufPedmondswa.gov>; DeLilla, Mike
<Mike.DeLillana edmondswa.gov>
Cc: McConnell, Jeanie <Jeanie. McConnell(@edmondswa.gov>; Jason Green navixeng.com>
Subject: RE: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Hi JoAnne,
Hope you are feeling better. Any status on when we can expect to receive comments on our
proposed utility revisions? We have been at a standstill on this since we sent our proposed revisions
a few weeks ago. Thank you!
Jenelle Taflin, P.E., LEED AP
Navix Engineering
d: 425.458.7896 1 c: 206.251.2842
From: Jenelle Taflin
Sent: Wednesday, December 4, 2019 10:04 AM
To: McConnell, Jeanie<Jeanie.McConnell(@edmondswa.gov>
Cc: DeLilla, Mike <Mike.DeLilla (@edmondswa.gov>; Zulauf, JoAnne
<JoAnne.Zulauf(@edmondswa.gov>; Jason Green <jgreen(@navixeng.com>
Subject: RE: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Thank you, Jeanie!
Yes, we had sent Mike DeLilla the attached email on 11/19 for him to give us some feedback on
whether or not we were headed in the right direction with our proposed revisions, which we based
on a meeting we had with Mike and JoAnne. We haven't gotten any feedback as yet and would like
to know how to proceed. Thank you!
Jenelle Taflin, P.E., LEED AP
Navix Engineering
d: 425.458.7896 1 c: 206.251.2842
From: McConnell, Jeanie <Jeanie.McConnell(@edmondswa.gov>
Sent: Wednesday, December 4, 2019 9:56 AM
To: Jenelle Taflin <itaflin(@navixeng.com>
Cc: DeLilla, Mike <Mike.DeLillaPedmondswa.gov>; Zulauf, JoAnne
<JoAnne.Zulauf(@edmondswa.gov>; Jason Green <igreen(@navixeng.com>
Subject: RE: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Good morning Jenelle,
I wanted to reach out to let you know that JoAnne has been out sick the past couple of days and plan
review comments will be sent to you when she returns. It is my understanding that there remains to
be significant utility conflicts with the current project design. We will need to wait for JoAnne's
return to get into next steps as I am not privy to all the details at this time.
Regards,
Jeanie
Jeanie McConnell I Engineering Program Manager
City of Edmonds
425-771-0220, ext 1338
ieanie.mcconnell(@edmondswa.gov
Permit Center Hours:
M, T, Th, F — 8:00am — 4:30pm
Wednesdays — 8:30am - noon
Web Map: www.maps.edmondswa.gov
From: DeLilla, Mike <Mike.DeLilla(@edmondswa.gov>
Sent: Wednesday, December 4, 2019 9:43 AM
To: McConnell, Jeanie <Jeanie.McConnell (@edmondswa.gov>
Cc: Zulauf, JoAnne <JoAnne.Zulauf(cDedmondswa.gov>
Subject: FW: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
FYI
From: Jenelle Taflin <itaflini@navixeng.com>
Sent: Wednesday, December 4, 2019 9:20 AM
To: DeLilla, Mike <Mike.DeLilla(@edmondswa.gov>
Cc: Zulauf, JoAnne <JoAnne.Zulauf(@edmondswa.gov>; Jason Green <igreen(@navixeng.com>
Subject: Re: Anthology Edmonds (Senior Living Facility); Utility Plan Revisions
Hi Mike,
Could you please provide an update on your review of our proposed utility revisions? We are trying
to finalize our plans. Thank you!
Jenelle Taflin, P.E., LEED AP
Navix Engineering
11235 SE 6th Street, Suite 150, Bellevue, WA 98004
o: 425.458.7896 1 c: 206.251.2842
itaflin(@navixeng.com I linkedin.com/JenelleTaflin
www.navixeng.com
On Dec 2, 2019, at 8:40 AM, Jenelle Taflin <itaflinl@navixeng.com> wrote: