ENGINEER RESPONSE - BLDG.pdfDesign Build 5ervice5, Inc. �g' erin & COnS�trUGtlOn Ma g nagemen-t 28119 -120th 9t. S.E., Monroe, WA 98272 Phone /Fax: (360) 793-9659 E-mail: rheide@dbemonroe,com February 16, 2016 Henry Byam (Wesco Construction) PO Box 5003 Lynnwood, WA 98046 Phone 425-771-0926 ext. 237 hb@wescogroupinc.com Subject: Response to Comments Dated January 5, 2016 Plan Check: BLD2014-0821 Project: White SFR Project Address: 8545 Talbot Road As requested I reviewed the following comments and have the following responses. 5. Main Floor Plan a. The upper floor is comprised of two sub -diaphragms. Please show how the new columns will effectively transfer lateral loads into the foundation. Response: A detail of the column was provided on sheet 4/20 in my July 31s, response. The column is acting as a simple vertical beam supported at the top by a CC connected to the roof framing and the bottom by the main floor diaphragm and steel floor and column framing. There are 4-3/4" bolts specified to attach the bottom of the beam to the steel framing and a CCOQ welded to the top of the HSS6x6 column that takes the load into the roof framing. All welding is to be %4' fillet unless noted otherwise. A note is to be added to the roof and floor framing that the floor/roof trusses in line with these columns are to be designed to transfer 2500 Lb. from the truss into the floor/roof diaphragms. See details attached. Sheet A-5 15. Guard Rail above the open areas. Response: This is a fabricated steel railing per the new detail and specifications provided. Posts will be bolted/welded to the steel beam below. Sheet A-6 19. Column numbers are shown on the attached key sheets. 20. Wood columns are multiple studs in walls. Walls to be attached to the Footings/Slabs with 5/8"x6" Titen Screws at the Required anchor bolt spacing. Strong Bolts or Titen Screws. 21. Steel columns are to be attached to the concrete with 4-5/8" Strong Bolts per the detail provided. ij p } �- 6 Z) -1 1 'l I 142 1, V J f' Henry Byam Response to Comments Dated January 5, 2016 February 16, 2016 Page 2 of 2 Sheet A-7 23. Steel to Steel are columns with cap plates bolted to the steel beams with 4-3/4" bolts per detail on S-2. Steel to Wood beams are Simpson CCO per detail on S-2. 24. Steel Column to top of Stem wall connection is the same as to footing with 4-5/8" x5" Strong Bolts or 5/8"x10" Anchor Bolts. 25. All beam Hangers are HWU Hangers matched to beam depth and height so beams flush with top of wood nailer. Hangers to be welded to steel beams per Simpson requirements. 8102 and B103 are to have %" Plates welded to steel beams and wood beams to be notched to fit in under top flange per detail attached. Sheet A-8 26. New 21.5' Column was detailed in July 31, 2015 comment response. This column extend from the main floor, across the upper floor extending to the roof. The bottom was to be bolted to the steel beam supporting the main floor to transfer the lateral load into the main floor diaphragm. The top was to have a bucket welded on to hold up the roof beam and transfer the lateral load into the roof diaphragm. Sheet A -9A 28. There are two locations that present this detail. Both are in T -walls and can be supported by different height wall studs as shown on attached. 29. There are no studs over 12' tall that are not braced by corners very close to them. Walls are broken up by horizontal continuous beams to take the wind to the wall corners. B65 and b66 are one continuous beam. General 41. Details are shown on the Lateral detail Sheet S-1. This should address all the items you asked me to address. If you have any further questions or I can be of any further assistance please call me at the above number. Rick Heide, P.E. President Attachments City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: January 5, 2016 TO: Tony Shapiro A.D. Shapiro Architects �,��ant o co FROM: Andrew Gahan, Plans Examiner RE: Plan Check: BLD2015-1320 Project: White SFR Project Address: 8545 Talbot Road During a review of the plans by the Building Division for the above noted project, it was found that the following information, clarifications, or changes are needed. A complete review cannot be performed until the revised plans/documents, including a written response indicating where the `clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments. Note that the comnments from the original review appear below in italics. Original Non-structural: 1. Please clarify by what means the required energy credits from Table 406.2 of the 2012 Washington State Energy Code will be met. The information provided in your response must be added to the plans. 2. Clarify the method by which the whole house ventilation requirements will be met per the 2012 IRC section M150Z The information provided in your response must be added to the plans. 3. Please verify that all fixed and operable panels of swinging, sliding and bifold doors are equipped with safety glazing per IRC R308.4. OK 4. Door number D32 is shown along the north wall of the Jacuzzi room attached to the north end of the master suite. However, door D32 is unidentified on the door schedule. Please clarify. OK Original Structural: 5. Main Floor Plan a. The upper floor is comprised of two sub -diaphragms. It is clear how the two sub- diaphragrn.s are transferring shear load on three sides and intennedia.tely. However, please clarify the shear path of the lateral load generated by the upper floor diaphragm along the interior halves of the aforementioned sub -diaphragms. Please show how the new columns will effectively transfer lateral loads into the foundation. Provide details of the connections required above, below and at the mid - span diaphragm along the columns. b. It appears that the sub -diaphragms comprising the upper floor do not conform to the aspect ratios provided in the AMPA SDPWS section 4.2.4. Please justify. OK c. Please provide calculations to show that the upper floor diaphragms are not overstressed without blocking. OK 6. Please provide framing layouts for the roof and floor framing from the manufacturer for each level of the structure with engineered lumber/trusses, as a deferred submittal. OK Additional Comments Sheet Al 7. Note on plans that stucco installation is to conform to IRC R703.6, Sheet A-3 8. Add a note `SEE SHEET Al FOR WINDOW/DOOR SCHEDULES.' 9. Provide detail bugs to reference the relevant foundation details to help guide proper review, construction and inspection. Sheet A-4 10. Note on the plans that the pool will be submitted under a separate permit. 11. Please specify on the plans the method to be used to fill and drain the Jacuzzi. While the pool can be applied for under a separate permit, the above considerations should be made for the pool as well. 12. Provide the details required for the HFX assembly specified at the garage doors. At minimum, please include the manufacturer's typical detail sheet in the plans to help guide proper construction and inspection. 13. Add a note `SEE SHEET A13 FOR WINDOW/DOOR SCHEDULES.' 14. Provide a note indicating where the shear wall schedule can be found. No shear wall schedule could be found during this review. Sheet A-5 15. Provide a detail with specifications or calculations for the guard rails above the open to below area per IRC Table R301.5. 16. Specify on the plans the method to be used to fill and drain the Jacuzzi off the Master Bedroom. 17. Add a note `SEE SHEET A13 FOR WINDOW/DOOR SCHEDULES.' 18. Provide a note indicating where the shear wall schedule can be found. No shear wall schedule could be found during this review. Sheet A-6 19. It appears that the columns are called out by number, but it is unclear to what that number is referring. Please provide a column schedule correlating to the column call -outs or label each column appropriately. 20. Provide details and/or specifications for wood column to footing connections. 21. Provide details for steel column to footing connections. 22. Install detail bugs or at minimum a reference to the foundation detail sheet. Sheet A-7 23. Provide steel connections details for the various configurations to be utilized including steel to steel and steel to wood connections. 24. Provide steel column to top of stem wall connection details. 25. Specify each of the beam hangers required. Sheet A-8 26. Provide connection details for the new 21.5' HSS6x6x3/8 column including top connection, mid -span floor connection and foundation connection details. 27. Clarify what the B/1 call -out is representing. It appears that it may be a detail, but no such detail could be found. Sheet A -9A 28. Provide a detail for locations where three beams interface at a single column such as where B63, B52 and B53 interface. 29. Studs over 12' require a stud height check per IRC R301.3. Please provide calculations showing structural adequacy at those studs in excess of 12' in height. 30. Per Item#27 above, it appears that a detail sheet may be missing from the submitted plan set as no details could be found to correlate with the call -outs on the plan. Please clarify. Page 3 of 4 31. Please provide a shear wall schedule and make reference to it on this sheet. Sheet A-10 32. Detail A refers to Page S-1, yet no S-1 could be found. Please clarify. 33. Detail C has a note "SEE PAGE FOR STEEL COLUMN CONNECTION". Please clarify what is intended with this note. 34. Specify how the 1x6 nailers at the top and bottom of the steel beam will be connected to the flanges. Sheet A-11 35. Similar to Item#32 above, several references are made to Sheet S-1, yet no such sheet could be found. 36. Section 113 refers to R402.2.2.8. This is not a valid section from the 2012 IBC. Please clarify what this is referencing. 37. Each of the sections on this sheet refer to another place for concrete and reinforcing information. This information could not be found on the plans. Sheet A-12 38. Add a note to the plans that the swimming pool will be applied for under a separate permit or as a deferred submittal. Sheet A-13 39. For consistency and accuracy, please label ALL glazing that is required to be safety glass. General 40. The engineer has included several details including B/1, F/l, H/1, 1/1 and a cantilevered foundation detail/schedule that do not appear on the plans. Please include these details and reference them in the appropriate locations. 41. Please include typical shear transfer details for connections at the roof, floor to floor and at the foundation to clarify the shear load path. 42. No general construction notes could be found in the plan set other than notes referring specifically to stairs. General notes are commonly desirable for job specific clarifications as well as typical notes. Please verify that it is the design team's intention to exclude any sort of general notes. Page 4 of 4 SIMPSON STRONG -TIE COMPANY INC. 5956 W. Las Positas Blvd., Pleasanton, CA 94588 t (800) 999-5099 www.strongtie.com OMF Frame Summary: Notes p �1 2 3 - Model: 0MF2S-999-219x136x266 Size45 _..,. Beam 1-"S"ize" m.._,. ... .... __ _ B9, Steel Beam Depth 8.5" Beam 2 Size 4.5 B9, Steel Beam Depth. 8.5" Column Size 4 C9, Steel Column Depth: 9" Dimension W1 Dim _ ..._... n 3.6 ._.e._... _.... ..�._ __. ..�.� ....�.. 18"-01" W2 Dimension 3.6 20'-0 H1 Dimension -4 2 Dimension 2 ............................... ...n......�_ 11'-4" H1 Clear Dimension 1 10w. -3 H2 Clear Dim...._..._ ._..,....�...� ension 2'7 -.�.-.�,,,_.s�..w.....,.,_.._ 10'-1 1/2" Column C.C. Spacing 19"-0'" Steel Beam Length 18'-3" .....' m Steel Column Length _ _ ..Plate 2.." 2"-2" End Boliin ..�_�.�.._�.�.�...._.... Bolting ....�_.._�...._.......__. Pre -Tensioned End Plate Bolts 7/8Dia A325 Bolts 1. H1 and H1 clear dimensions assume 1-1/2" thick non -shrink grout. 2. H2 dimensions assume 1-1/2" thick field installed nailers. 3. Anchorage solution may require additional studs on side of columns, see anchorage design output for final W1 and W2 dimensions. 4. Column and beam sizes shown are depth of steel only and do not include nailers. 5. For frames with C1 8H or C21 H columns, beams require 4x beam top nailers. 6. For frames with C1 8H or C21 H columns, W1 and W2 assume (2) 2x inside nailers. 7. Dimension from top of sheathing to bottom of beam 2 nailer. 8. Dimension from bottom of base plate to top of cap plate. Frame ID: Y1 m Date: 1/23/2014 Page 4 of 20 JAI ji 4-2X6 HF,2 ash ,yx Lln.lq 11 2JY,2lY4 STEEL TUBE kIr 6X6X3H/8 BB SS X Mw vi > N! YEN Y, x 11 HSS 6X6X3/8 B86 GLB STEEL TUBE CAP 0 0 ZU '74 7 'AR WALL SI -8 - --------- fir . 3-2X6^ HF#z mss. - --------- - ,... ........... ..... r1 STEEL " PIPE ` L STEEL 1.N.0. o�r«.mXw _ rW21B X93 � I FLOG J 0 I s _._ z.M _— .... N :EL ixi 5"0 STD ISTEEL A' J �ry PIPE a .. ..m. 5"0 C 4� n d � 9 u a li a W21X55 OR 57 6 p W21X55 OR 57 ��m..7. — -- `-- - B106 —. tl q p I I I 6 xv, CIA L1 3-2X6 5. STD STEEL HF#2 PIPE U.N.O. zMw p 5"0 STD STEEL (� PIPE U.N.O. /� m u o I 6GUJ r�1 FLOOR IS HANG+ FROM ALL ! z LU cl 0 0 cfF .1 11 0 Y VII 1� "I "I N: N— LU w O rt U) LL z LU cl 0 0 0 LL LU w a rt U) .L4 1� 114 t, fl, ul ti 4J 4i zt r w m T Cp 11.1 19 D:v 19 Cl) 19 FA 19: 0 bM to tr q "I ,l O LL LL w m LL LU J7_� J�J7 LL 0 C/) U) I' T 0 to CD �14 rvgg if QM 4J M5 1:614 0 Ut: I? U)4"f,:D! M 8 23 w m w O LL N C, 0 w CD M Tw 14-1, rz; C3 0 U 0 x 4J 04 0 U I . tlf`po45 Oris 2 L -. � � T 19 IL I? 1r1-? IV y 19 Iq 19 ly 19 ly 4 b b 60 Fz) :c If In .ID !CCD —1) It "1 10 ll5 Cr I-) Cr N N gllra� .lv c MW m 10 10 In 20 4- o < In ca EY '59 L- ID N < m in U al < 10 - alk N C) rn III th p� 11- 11 -CLO •t�- o m "I In ID N M N cz� , (," 1) 1'1�1�"',p "L5 0 e4 Y, � Sl A—K I( -- CPO Uav m Nh,.'p- n, V^ C, c � 4 L, (h4-1 (b67— I� IFI 3-2X6 HF#2 6jx 1,5 GL.a