Loading...
ENGINEER RESPONSE - BLDG.pdfTODD PERBIX Structural Engineer 4621 SW Admiral Way Seattle, WA 98116 twperbix.com Memorandum Date: 2/4/16 To: 1-1121) Architects carmen@h2darchitects.com Attn: Carmen Re: Plan Review Comments y��d � �rmmarcw p� E ISS ,, d ��)F I WONDS From: Todd Perbix SE Project: Mangum Residence Project #: BLD2015-1619 Copy to: The following are our responses to structural comments made by Andrew Gahan of the City of Edmonds in a Comment Letter dated February 3, 2016. Item 5: The question marks are vestigial and will be removed. Item 6: Please refer to the calculations. Straps are placed above and below the windows which, acting with the continuous vertical jamb studs, serve to allow the wall height to be considered the height of the window rather than plate to plate. Nonetheless, the ratio of h/I still slightly exceeds 2 and the calculations account for this in the manner required by SDPWS 4.3.4. Thank you. Please feel free to call with any questions. End of Memo