Engineering and Storm Prelim Comments 2-Spence-PLN20170057.pdfI►A I HLVA us] 7_l►110LVA I REQUEST FOR ADDITIONAL INFORMATION Date: April 11, 2018 To: Brad Shipley, Associate Planner From: Jeanie McConnell, Engineering Program Manager Subject: PLN20170057, Spence 2-lot short plat 17606 72"d Ave W The comments provided below are based upon review of the preliminary development plan & preliminary drainage report for the subject short plat. Additional information is requested from the applicant at this time in order to continue review of the application and provide preliminary approval. Please ask the applicant to provide a written response to each of the comments below and revise and resubmit plans accordingly. Comments 1 — December 27, 2018 Comments 2 — April 11, 2018 GENERAL 1. ok 2. ok UTILITIES 3. ok 4. ok 5. ok 6. April 11, 2018 — Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at Zachary.richardson(a,edmondswa.gov with any specific questions you may have regarding his comments. December 27, 2018 comment - Please submit a stormwater report consistent with the 2012/14 Stormwater Manual and the city's Stormwater Addendum. Please include full infiltration calculations (see Appendix B of the Addendum to determine the specific City of Edmonds testing requirements). Ensure the stormwater management design for the proposed single family lot is reflective of the eve line of the house, driveway, and any patios, walkways, etc. Show a stormwater mitigation system on the plans based on the infiltration rate and the infeasibility checklists. If there will be an outfall, show what it connects to and where. Plans show connection to a catch basin that is not on the city system. Please show the catch basin as proposed. Provide approximate invert elevations for all points of connection as well as length and size of pipe, including the City storm system inverts if applicable. Thank you. STO RM WATE R REVIEW COMMENTS City of Edmonds Engineering Division To: Engineering Reviewer Date: April 2, 2018 Project Name: Spence Short Plat Permit Number: PLN20170057 Address: 17606 72nd Ave W Review Type: Preliminary Plat (Feasibility) Submittal Date: 3/2/2018 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation: I recommend that PLN20170057 be withheld until the comments below are adequately addressed. Review Comments: 1. The project does not appear to be satisfying the retrofit requirement per ECDC 18.30.060.D.b.i; the project must mitigate storm water using MR #5 for 25% of the existing impervious surfaces on lot 1 in addition to mitigation for new plus replaced surfaces on Lot 2. 2. It is unclear why the engineer selected rain gardens as the most appropriate BMP for the site; List 1 must be reviewed in -order (top to bottom) and it appears that the design infiltration rate above 5 in/hr allows for the use of full infiltration and pervious pavements on -site. Revise design to implement first feasible BMP option on list and/or revise report to significantly expand on the infeasibility of each BMPs not selected for use. 3. Per Edmonds Addendum Checklist #4, an additional correction factor of 0.9 (for influent control) is required to be applied to the design infiltration rate; revise drainage report as needed to use corrected design infiltration rate. Page 1 of 1