Engineering Civil Comments 2 (2).pdfCITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: July 27, 2018
TO: Kayla Clark, Select Homes
kayla.clark@outlook.com
FROM: JoAnne Zulauf, Engineering Technician
joanne.zulauf@edmondswa.gov
RE: Subdivision File #: pin20170046
Project: Select Homes 3-Lot SP
Project Address: 18807 88th Ave W
During review of the revised submittal, it was found that the following information, corrections, or
clarifications are needed. Please submit two (2) sets of revised plans/documents with a written
response to each of the items below to an engineering technician.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
GENERAL
1. Please provide an itemized engineers cost estimate for both on -site and off -site (right-of-way)
improvements, including all utilities, traffic control, NGPA fencing and
restoration/enhancement plantings. Use the King County Site Improvement Bond Quantity
Worksheet and utilize the "write-in" sections where appropriate.
7/23/18 Please add plastic covering to page 2
Move items on page 4 from the "future right of way improvements" column
Sheet EC-01 EXISTING CONDITIONS
7/23/18 New Comment: Please correct the overwriting on plan.
Sheet AL-01 EXISTING CONDITIONS
11. Engineering Requirements for this project state that 88th Ave W and 188th St SW shall be
widened along property frontage as needed to comply with street standards for the specific
roadway classification. Please provide a road cross section for both 88th and 188th
a. 7/23/18 The detail for 188th shows 11 ft to edge of curb but the actual drawing shows
11.7 to edge of curb. It is preferable to keep sidewalk aligned with existing conditions
as long as the 11 ft drive lane is attainable. Please revise if there is in fact an extra .7
feet available.
TRANSPORTATION ENGINEER REVIEW
Refer to plan review comments below by City Transportation Engineer, Bertrand Hauss.
Please contact Bertrand directly at 425-771-0220 or by email at
bertrand.hauss(&edmondswa.1!ov with any specific questions you may have regarding his
comments.
Sheet TC-01 — TRAFFIC CONTROL
7/23/18 Comment:
1. The Detail provided (Typical Application 10) in the Traffic Control Plan doesn't apply to this
scenario since a 3rd flagger needs to be present. In addition, this work includes work @ an
intersection (not curved roadway). The additional flagger is needed since the flagger along 88th Ave.
W (NB movement) will be too far from the ALL -WAY stop -controlled intersection to control the
other (2) approaches (SB on 88th and EB on 188th)
STORMWATER ENGINEER REVIEW
Refer to Plan review comment below by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.rich ardson(a edmondswa.2ov with any specific questions you may have regarding his
comments.
7/23/18 Comment: Please revise all drainage easement labels to 'private'.
Fire District and the Planning Division do not have any additional comments.
Page 2 of 2