Loading...
Engineering Comment Responses PLN20180027_F.PDFrsi 0J DESIGN May 1, 2018 Jeanie McConnell City of Edmonds Development Services Department — Engineering Program Manager 121 5t' Avenue North Edmonds, WA 98020 Re: Review Comments for Plan Check PLN20180027 Lot Line Adjustment at 23525-84th Ave W. Dear Ms. McConnell: We have received your review comments dated April 25, 2018 for the above -referenced project. We have updated our drawings accordingly. Below are our written responses to your comments. Corrections 1. A building permit application is currently in for review with the City (BLD20171842) that proposes a sanitary sewer line across Lot A of the subject lot line adjustment. Please revise the recording documents to include the required easement area. In addition, the recording documents will need to clearly state ownership and maintenance responsibilities for the sewer lien located within the easement. Response: A private sewer easement will be recorded separately from this survey over the as -built location of the sewer facilities. The creation of Lot A should not be conditional to having this sewer easement in place, however it is understood that approval and occupancy of any improvements upon Lot A will require appropriate easements to be recorded. 2. Sheet 1 Restrictions should be updated to include the 10-ft drainage easement per Lotus Lane Plat depicted on Sheet 2, along with a recording number. Response: Restrictions listed on Sheet 1 are per the referenced title report. A note has been added per request to reference the platted easement. Please let me know if you have additional questions or comments regarding this project. Sincerely, CORE DESIGN, INC. Glenn . pragu , L Principal, Sr. Project Manager