Engineering Comments #2.docx
City of Edmonds
TH
121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221
Website: www.ci.edmonds.wa.us
PUBLIC WORKS DEPARTMENT
Engineering Division
Plan Review Corrections
Plan Check : Date:
# BLD20120583 October 5, 2012
Project Name/Address:
Belton Homes New SFRs 21909 78th Pl W
Contact Person/Address/Fax:
Terri terri@sundquisthomes.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov :
Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to
Engineering Handouts for all Engineering Requirements.
Site Plan:
1. Done.
2. Done.
3. Done.
4. Done.
5. Done.
6. Done.
7. Done.
8. Done.
9. Done.
Storm/Utility
1. Done.
2. Done.
3. Done.
4. Done.
5. Done.
6. Done.
7. Done.
8. Done.
9. Show 4”side sewer clean out at house and 6” clean out at property line. Note that 6” clean
out shall have a 12” Cast Iron Lid with ½” Hex Bolts. Excessive slope. Consider 6” side
sewer on property and provide detail of anchoring.
DATE FAXED/E-MAILED 6/29/2017 PAGE ___ OF __
12
10. Done.
11. Done.
12. Done.
13. Please add note on plan regarding power undergrounding to read “All utilities will be
installed underground.”
14. Provide a Site Classification Worksheet. A worksheet can be found on our website in the
Engineering E #72 Stormwater Handout. Impervious surface calculations on site plan and
civil sheet are different. Please revise.
15. Done.
Erosion/Grading
16. Done.
17. Add note to plans: “All disturbed areas on and off site shall be compost amended to meet
requirements of BMP T5.13 in the Stormwater Manual, Vol V, Chapter 5”.
18. Done.
19. Done.
20. Done.
21. Done.
22. Done.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.
DATE FAXED/E-MAILED 6/29/2017 PAGE ___ OF __
22