Plan Review Corrections
Plan Check : Date:
# BLD20120581 October 4, 2012
Project Name/Address:
Belton Homes New SFRs 21914 78th Pl W
Contact Person/Address/Fax:
Terri terri@sundquisthomes.com
Reviewer: JoAnne ZulaufDivision:Engineering
During review of the subject submittal, it was found that the following information, corrections, or
clarifications would need to be addressed. All Handouts and Standard Details referred to in these
comments can be accessed at our website: www.edmondswa.gov :
Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to
Engineering Handouts for all Engineering Requirements.
Please respond to the red comments below:
Site Plan:
1. Done.
2. Done.
3. Done.
4. Done
5. Done
6. Please call out sidewalk and note width.
7. Done.
8. Done
9. Done
Storm/Utility
1. Show tightline from house to YD stub out. Excessive slope, please provide detail of
anchoring.
2. Done.
3. How will driveway runoff be collected and directed to storm system? If intending to slope to
YD in shared drive, add arrows showing direction of flow. Call out any thickened edge or
curbing to be installed to guide water to yard drain.
4. Done.
5. Done.
6. Done.
7. Done.
DATE FAXED/E-MAILED 6/29/2017 PAGE ___ OF __
12
8. Show water service line from meter to house, call out size, material and length. Water
service is shown connecting at yard drain or crossing over yard drain. Please revise.
9. Show 4”side sewer clean out at house and 6” clean out at property line. Note that 6” clean
out shall have a 12” Cast Iron Lid with ½” Hex Bolts. Excessive slope. Consider 6” side
sewer on property and provide detail of anchoring.
10. Done.
11. Done.
12. Done.
13. Please add note on plan regarding power undergrounding to read “All utilities will be
installed underground.”
14. Provide a Site Classification Worksheet. A worksheet can be found on our website in the
Engineering E #72 Stormwater Handout. Impervious surface calculations on site plan and
civil sheet are different. Please revise.
15. Done.
Erosion/Grading
16. Done.
17. Add note to plans: “All disturbed areas on and off site shall be compost amended to meet
requirements of BMP T5.13 in the Stormwater Manual, Vol V, Chapter 5”.
18. Done.
19. Done.
20. Done.
21. Done..
22. Done.
New Comment
1. Add note that water line shall cross over the sewer line and that a 20’ PVC sleeve is
required for the water line centered at the crossing.
Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please
contact me at 425-771-0220 if you have specific questions regarding these plan corrections.