Loading...
Engineering Comments 1 - BLD20190909-Sebastian.pdfOF EDV0 CITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION 6'st 1g90 (425) 771-0220 City Website: www.edmondswa.gov DATE: October 3, 2019 TO: Marcus Jenkins marcus@architectsnw.com FROM: Jeanie McConnell, Engineering Program Manager Jeanie.mcconnell@edmondswa.gov RE: Application #: BLD20190909 Project: Sebastien - Single Family Residence Project Address: 21222 Pioneer Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. GENERAL 1) A right-of-way permit is required to perform work within the City right-of-way (ROW). A ROW Permit Application shall be completed by the contractor and submitted to the City prior to issuance of the building permit. 2) Submit Side Sewer Permit Application form 3) Include construction sequence. Refer to sample on City website. 4) If a stormwater management system is constructed on the site, a Stormwater Covenant will need to be recorded against the property. This item will be reviewed in more detail once the entirety of these comments have been responded to. 5) Show entire private easement area throughout the plan set. Reference Auditors File Number for and specify what the easement is for. The information provided with the building permit submittal indicates a 21-ft wide easement. 6) Consistent with Edmonds Community Development Code 18.80.060.D, driveway slopes shall not exceed 14% slope unless authorized by the public works director in accordance with certain criteria contained within the aforementioned code section. An email was included with the permit submittal stating that a variance of 20% is requested; however, the criteria listed within the code was not addressed. Please submit a letter addressed to the City Engineer, Rob English, specifically addressing the code criteria. Upon receipt of the letter, staff will review the proposal with the police and fire departments to obtain their concurrence, which is one of the criteria to be met. 7) Due to the house being setback from the ROW, a fire/aid address sign will be required at the driveway approach. The City's Public Works Operations and Maintenance Department will fabricate fire/aid address sign. Add a notes to the civil construction plans stating: The City's Public Works Operations and Maintenance Department to fabricate fire/aid address sign. The contractor/owner shall contact the Engineering Division by email at en ing eeringpermits e,edmondswa. og_v 2-weeks in advance of the requested sign fabrication. A sign fabrication fee will be collected prior to permit issuance. Fire/Aid address signs are $75 per sign. 8) Please provide a written response from the geotech that the civil construction plans are consistent with the geotech report and recommendations. SHEET C1— COVER SHEET 1. Revise General Construction Notes to state the current year for WSDOT/APWA specifications. 2. Update Utility Contacts as follows: a. Revise spelling of Edmonds under water, sewer and storm b. Replace telephone utility with Frontier, the provider within the City of Edmonds. SHEET C2 — EROSION CONTROL PLAN & NOTES 1. A silt fence is currently shown along the high side of the lot. Clearing limits should be clearly marked in the field as several trees are remaining on the site, but this should be done with an orange barrier fence or something similar, not a silt fence. Please revise plans as needed. 2. The plan sheet reference for Detail 8 states C2.1. Please revise to C3. 3. A force main has been called out for pumping from the sediment trap to the sediment tank. Callout pipe material, size, pump requirements, etc. Also provide a key for the line type. 4. Relocate sediment tank to private property. 5. Label edge of pavement. 6. Add note: All disturbed areas to be compost amended per 2014 SWMMWW BMP T.5.13. SHEET C3 — EROSION CONTROL DETAILS 1. The complete, approved City standard details shall be provided in the plan set. Remove and replace details as needed. SHEET C4 — GRADING AND UTILITIES PLAN 1. Label roof drain tightline and footing drains. Show point of connection to the storm outfall pipe. Please note, the roof drain tightline and footing drains shall not tie together at the home. Connection shall be at least 10-ft away from the home. 2. Show footing drains, as required, for the retaining wall. Where will the footing drains connect to the storm outfall pipe? 3. A 6" cleanout with 12" cast iron lamphole cover is required on the sanitary sewer line, on the right-of-way side of the property line. Show on plans. 4. Show all dry utilities and required utility separation. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and 5' from any City main lines. Page 2 of 3 5. Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. 6. Please add a note to the plans that all final restoration within the right-of-way shall be completed by the contractor not the City of Edmonds. 7. Note W2 indicates a 1" water service is to be installed. Are you also requesting a 1" meter or will you only need a 3/4" meter. It doesn't look like there's a requirement for a fire sprinkler system, but should this become a requirement, then a minimum 1" meter and 1 1/2" water service line will be needed. 8. Please label all pipe material — water, sewer & storm. 9. Both the sewer and storm systems have pipe sections proposed at over 20% slope. Pipe laid at over 20% slope shall be anchored. Due to the storm pipe connecting to a catch basin at one end of the run, if the pipe run is limited to two sections of pipe then anchoring will not be required. 10. The following comments pertain to the storm pipe crossing in the City right-of-way: a. Storm pipe located within the City right-of-way shall be 12" in diameter, with 2-feet of cover. Where less than 2-feet of cover, ductile iron pipe shall be used. b. A catch basin will need to be placed at the edge of pavement on the west side of Pioneer Way. The private 6" storm pipe will connect to this CB. c. The new 12" run in the ROW can extend from the new CB to existing CB#10038 if feasible. d. Refer also to comments from Stormwater Engineer. 11. Label edge of pavement. 12. Standard detail TR-546 is referenced for the driveway approach. Please include standard detail in the plan set. 13. Provide a cross section of the driveway showing the following: a. Retaining wall & edge of pavement b. Utility locations and depths c. Cross slope in the driveway — how will storm water flows be directed to CB D7? 14. Update Utility Notes as follows: S 1 — Update standard detail reference to SS-200 and include detail within the plan set. S3 & S5 — Update standard detail reference to SS-200 S7 — Update standard detail reference to SS-202 and include detail within the plan set. 15. Provide a surface area chart for the site, including the following: Type of area Square footage Stormwater Facility Lawn and Landscape Roofs Hard surfaces STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(d,edmondswa.2ov with any specific questions you may have regarding his comments. Page 3 of 3