Engineering Comments 1 - Revised.pdfof Ellzvo CITY OF EDMONDS N PLAN REVIEW COMMENTS ., ENGINEERING DIVISION 14'sr. , s9° (425) 771-0220 City Website: www.edmondswa.gov DATE: January 28, 2019 TO: Jacob Imbery FROM: Natalie Griggs, Engineering Technician Natalie.griggs@edmondswa.gov RE: Application 9: BLD20181595 Project: Proposed ADU Project Address: 18121 70d' PI W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, new updated standard details with new reference numbers, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. January 11, 2019 Comments January 28, 2019 Comments GENERAL 1) Please submit Side Sewer Permit Application form for the proposed side sewer serving the ADU. 2) Show sewer invert elevations at proposed ADU and connection to existing to verify a minimum of 2% slope and 2 feet of cover. • Label pipe material on the plans. 3) The proposed side sewer to serve the ADU appears to cross proposed underground dry utilities (power, phone, cable, etc.). A minimum of 12" separation between dry utilities and sewer must be maintained in perpendicular crossings. Please show this requirement is being achieved (e.g. cross section). 4) January 28, 2019: Based on review by the Building Department, the existing 3/4" water meter will not provide sufficient capacity to feed the existing single-family residence and proposed ADU. For this reason, the existing meter will need to be upsized to a 1" meter, which will require a new tap by the City on the City's water main. The applicant will be required to pay for the new tap on the main and the new meter. Fees are as outlined below: • Installation of a 1" water meter is $2,970 • With the installation of a larger meter, general facility charges (GFC) will also be required in the amount of $7,574. (The GFC for the 1" meter is $12,624. A credit for the existing 3/a" meter GFC is $5,050.) • Therefore, the total for the 1" water meter installation will amount to $10,544. Please note, the City of Edmonds is currently evaluating GFC's for ADUs. If you would like to proceed toward issuance of this permit at this time, the fee for the 1" water meter is $10,544. If you would like to wait until a decision has been made on the GFC's, which may affect the total cost, that is an option as well. 5) Please revise plans to include the following: • Please add a note that a 1" meter is to be installed. Show the water meter located in the right-of-way, such that the back of the meter is on the property line. Please label the pipe material and note tracer wire to be installed on the water service line. Page 2 of 2