Engineering Comments 1.pdfof ED40CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr. ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: December 17, 2018
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Application #: BLD20181466
Project: Chung - Single Family Residence
Project Address: 725 Edmonds Way Lot 2
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a written
response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, New updated standard details with new reference numbers, application
and other forms, and development code may be referenced on the City website:
www.edmondswa.gov under Services/Permits and Development.
GENERAL
1) Plan submission shall show short plat infrastructure as existing in lightght pen. Only
that portion of construction necessary to construct the house on Lot 2 and hook up to the
utility stub outs (created by the short plat process) shall be shown on this plan. All utilities
between the stub outs and the residence shall have length, pipe width and type labeled along
with inverts at connections. No "existing to be removed" items shall be shown on the plans.
2) Remove section of Lot 1 impervious surface removed information. It is not counted here.
3) Please lighten line for all information for the other two lots. Only darken lines for the new
construction to Lot 2.
4) Submit Side Sewer Permit Application form
5) Include a City Engineering Division approval block on all plan sheets. Refer to sample on
City website.
6) Include construction sequence. Refer to sample on City website.
7) Include General Construction Notes. Refer to sample on City website. Please change the
WSDOT/APWA version to the current year.
8) Add City of Edmonds standard details for all tesc, storm, sewer, driveway, and access road
etc. information.
9) Add Olympic View Water Sewer District standard details for the water meter and
connection.
10) A rockery is shown along the access road. The City of Edmonds does not review or approve
rockeries. Construction of rockeries is prohibited within the City of Edmonds under certain
circumstances and in certain situations per Edmonds Community Development Code
18.40.020. Please review the code section to verify this rockery falls outside of the
prohibitions. Top and toe elevations for the rockery are required at each end of the wall and
at every two feet of change.
11) A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. Ensure the stormwater
covenant meets Snohomish County Record Drawing requirements. The document must be
complete, but will not be recorded prior to permit issuance. Prior to construction, final
location of facilities are to be verified (by field inspection and asbuilt) and then the covenant
will be recorded.
12) Show all private easement information for this lot only within the plan set submittal.
13) Show the short plat proposed frontage improvements as existing. Remove from the plan
everything that is existing to be removed.
14) Please note: additional comments not included in this review may be produced after
reviewing the next submittal.
TESC-You can use a copy of the tesc plan from the short plat -just add a copy to each set of
drawings in each permit.
1) Show filter fence on the plans and incorporate and reference New City standard detail.
2) Show construction entrance on the plans and incorporate and reference New City standard
de.
3) Please show and add a note to the plans that filter socks will be added to any catch basins
downstream from the construction site. Incorporate and reference New City standard detail
Ems.
4) Orange protective barrier fencing shall be placed at the drip line of trees to remain and
around areas proposed for low impact development techniques, such as rain gardens,
infiltration systems, etc., to protect the area from compaction.
5) Please provide the location of the temporary stockpile. Add a note that the stockpile is to be
covered within 24 hours
6) Please add a note to the plans that all disturbed soils will be compost amended per BMP
T5.13.
7) Add note: Install and maintain all TESC measures according to approved plans, City of
Edmonds standard details, and all other measures that may be required during construction.
SEWER
1) Label pipe material and size. The sewer lateral, (from the main to the edge of easement,
shall be 6". Service line shall be 6" where shared. Once line is only used by Lot 2, it can be
reduced to 4".
2) A clean out is required at the property line between Lot 3 and Lot 2.
3) Provide invert elevations at the main, the cleanout at the easement line and at the house so
that a minimum 2% slope and minimum 2' pipe coverage can be verified. If the slope of the
pipe exceeds 20% the pipe will need to be anchored.
STORM
Page 2 of 3
1) No stormwater system is shown on this plan. Add the stormwater mitigation system and
connections.
2) Show where the footing drains will discharge.
3) Show where the rockery drainage will discharge.
4) Provide invert elevations for all pipes at catch basins and manholes. Please note that a
minimum of 2' of cover is required for all pipes located under driveable surfaces and 1' of
cover under landscape areas.
5) Please add a note to the plans that if the rim to invert elevation exceeds 5-feet then a type II
manhole will be required.
STORMWATER ENGINEER REVIEW
Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(a edmondswa.i!ov with any specific questions you may have regarding his
comments.
Page 3 of 3