CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr. ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: January 9, 2019
FROM: JoAnne Zulauf, Engineering Technician
joanne.zulauf@edmondswa.gov
RE: Application #: bld20181498
Project: Doug's Mazda Service Center
Project Address: 22130 Highway 99
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents with a written
response to each of the items below to a permit coordinator.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
GENERAL
1. Please confirm on the King County Site Improvements Worksheet that all improvements in the
right of way are included in the correct column, for example, the hydrant and fire connection
work is in the right of way. As it is now, all water improvements are listed under private
improvements.
2. Please review Traffic Impact Handout E82. Complete the worksheet for the Change in Use
section noting the increase in square footage of the structure or provide an independent
calculation.
3. Fire/Aid address sign required at 76th. Note on plans should require 2-week minimum notice to
PW Sign Shop — 425-771-0235.
4. The Edmonds Community Development Code states that parking lots shall be paved. The city
engineer may allow gravel parking for temporary parking lots, or where parking is primarily
long term. Please show the lot as paved or provide information that supports the area as being
primarily long term.
5. All parking lots shall have an approach that is a minimum of 20 ft paved. Show that this is met
*if* the argument for keeping the lot gravel is approved.
6. Add note: Utility patches with less than 20-feet of separation shall be combined and full width
or half width overlay will be required depending on the extent of disturbance. Where utility
patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway.
Where utility patches extend into both travel lanes then a full width overlay is required.
SANITARY SEWER
1. Please note that sewer cleanout shall have a 12" lamphole cover with 1/2" hexbolts.
2. Call out size of existing sewer.
3. If this is a new connection to this sewer line then the line must be TV'd to verify condition for
reuse. The lateral will also need to be TV'd by the city's Operations Division to verify
condition for its reuse. If either the existing private sewer line or the lateral is not approved for
reuse, they will need to be replaced. Add these notes to the plans if this is a new connection
otherwise note that the pipe is just being replaced.
STORMWATER ENGINEER REVIEW
Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(a edmondswa.i!ov with any specific questions you may have regarding his
comments. (NOTE TO REVIEWER: Any comments provided will be located in the
Engineering electronic address files. Combine PDF's with Engineering comments to attach as
one packet in Permit Trax.