Loading...
Engineering Comments 1.pdfof Ellzvo CITY OF EDMONDS N PLAN REVIEW COMMENTS ., ENGINEERING DIVISION 14'sr. , s9° (425) 771-0220 City Website: www.edmondswa.gov DATE: January 11, 2019 TO: Jacob Imbery FROM: Natalie Griggs, Engineering Technician Natalie.griggs@edmondswa.gov RE: Application #: BLD20181595 Project: Proposed ADU Project Address: 18121 70d' PI W During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, new updated standard details with new reference numbers, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. GENERAL 1) Please submit Side Sewer Permit Application form for the proposed side sewer serving the ADU. 2) Show sewer invert elevations at proposed ADU and connection to existing to verify a minimum of 2% slope and 2 feet of cover. a. Label pipe material on the plans. 3) The proposed side sewer to serve the ADU appears to cross proposed underground dry utilities (power, phone, cable, etc.). A minimum of 12" separation between dry utilities and sewer must be maintained in perpendicular crossings. Please show this requirement is being achieved (e.g. cross section).