During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a written
response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, new updated standard details with new reference numbers, application
and other forms, and development code may be referenced on the City website:
www.edmondswa.gov under Services/Permits and Development.
GENERAL
1) Please submit Side Sewer Permit Application form for the proposed side sewer serving the
ADU.
2) Show sewer invert elevations at proposed ADU and connection to existing to verify a
minimum of 2% slope and 2 feet of cover.
a. Label pipe material on the plans.
3) The proposed side sewer to serve the ADU appears to cross proposed underground dry
utilities (power, phone, cable, etc.). A minimum of 12" separation between dry utilities and
sewer must be maintained in perpendicular crossings. Please show this requirement is being
achieved (e.g. cross section).