Loading...
Engineering Comments 1.pdfof ED40 CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr_ ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 3, 2019 FROM: JoAnne Zulauf, Engineering Technician Joanne.zulauf@edmondswa.gov RE: Application #: bld20190917 Project: CHC Addition Project Address: 23320 Highway 99 During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Sheet L1.01— LANDSCAPE PLAN 1. Please submit a landscape plan. 2. Highway 99 is a designated "Key Route" in the City's Street Tree Plan. Designated key routs and all other arterials require a large spreading Street Tree. Please add note: The exact street tree species to be planted will be determined by our parks services manager. 3. Street trees on key routes and arterials shall be a 3" caliper with 7 ft branching height at time of planting. 4. Add Note: "A separate irrigation permit must be obtained from the City Public Works Department. Prior to final acceptance provide a copy of the backflow test report to the City's Cross -Connection Control Specialist. Test reports can be faxed to 425.744.6057 or e-mailed to leff.koblyk(a edmondswa.gov. Backflow testing will be required on an annual basis thereafter."