Engineering Comments 1.pdfof ED40CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr_ ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: September 10, 2019
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Application #: BLD20190839
Project: Smith - Single Family Residence
Project Address: 7726 202nd Pl SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a written
response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.gov under Services/Permits and
Development.
GENERAL
1) Please add all standard details that are applicable to project construction. Available on the
city website. Update plans.
2) Submit ROW Permit Application form
3) Submit Side Sewer Permit Application form
4) Include construction sequence. Refer to sample on City website.
5) Include General Construction Notes. Refer to sample on City website. Please change the
WSDOT/APWA version to the current year.
6) A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. Ensure the stormwater
covenant meets Snohomish County Record Drawing requirements. The document must be
complete, but will not be recorded prior to permit issuance. Prior to construction final
location of facilities are to be verified (by field inspection and asbuilt) and then the covenant
will be recorded.
7) Please revise the call out for the sewer easement to "Public Sewer and Storm Easement
AFN: 1877039 (5 ft)".
8) Please label the driveway as asphalt from the paved road to the property line.
9) Remove current notes regarding size of trench cuts in the road and add note to plans:
"Utility patches shall be combined and full width or half width overlay will be required
depending on the extent of disturbance. Where utility patches fall entirely within one travel
lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into
both travel lanes then a full width overlay is required."
WATER
1) Please label size of water meter.
2) Show that there is a minimum of 3' of horizontal separation between the water service and
dry utilities (i.e. power, phone, gas, cable, etc.). See below.
SEWER
1) Is there a reason that the sewer connection is not from the easement? If you have not done
so, please contact the sewer division at 425-771-0235 to discuss the preferred location to
make the new connection.
2) Show a 6" cleanout on the right of way side of the property line. Please add a note that the
6" cleanout at the property line shall have a 12" cast iron lamphole cover with '/2" hexbolts.
3) Provide invert elevations at the cleanout at the property line .
DRY UTILITIES
1) Show all dry utilities and required utility separation. Please add a note that a minimum of 3'
separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer,
water, and storm and 5' from any City main lines.
STORMWATER ENGINEER REVIEW
Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(&,,edmondswa.t!ov with any specific questions you may have regarding his
comments.
Page 2 of 2