Engineering Comments 1.pdfof Ell-'vo CITY OF EDMONDS PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: December 20, 2017 TO: Corey Recla corey@pcamservices.com FROM: Jennifer Lambert, Engineering Technician Jennifer.lambert@edmondswa.gov RE: Application 4: BLD20171702 Project: Galleon Condominiums Project Address: 8549 242" d St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. NOTE TO REVIEWER: These plan review comments are organized by utility/element being reviewed. If civil plan sheets are submitted, then after the GENERAL section, comments should be organized by plan sheet. GENERAL ***The Engineering Division is unable to complete the review at this time since no site plan has been submitted. Please submit a site plan for review. Additional comments may follow once the plan has been submitted for review.*** 1) Submit ROW Permit Application form if you will be completing any work with the City right-of-way. 2) Please submit a site plan showing any existing and proposed storm lines located on the subject site. 3) Label the pipe sizes for existing and proposed storm lines. 4) If there is an existing stormwater management system, please show the system on the plans. 5) Show all City and private easements. 6) Show all City utilities that are adjacent to the site. 7) All utilities should be shown from the city main line/lateral to the structure. 8) Show all existing and proposed/repair (if any) frontage improvements. 9) Show all appropriate temporary erosion control measures. a. Filter fence -reference City standard detail E L L b. Construction entrance - reference City standard detail E 1.2. c. Filter socks —note on plans that they will be added to any catch basins downstream from the construction site. Incorporate and reference City standard detail E1.3. d. Orange protective barrier fencing - to be placed at the drip line of trees to remain and around areas proposed/existing low impact development techniques, such as rain gardens, infiltration systems, etc., to protect the area from compaction. e. Temporary stockpile - Add a note that the stockpile is to be covered within 24 hours 10) Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13. Page 2 of 2