Loading...
Engineering Comments 1.pdfCITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425)771-0220 City Website: www.edmondswa.gov DATE: October 10, 2019 FROM: JoAnne Zulauf, Engineering Technician JoAnne.Zulauf@edmondswa.gov RE: Application #: BLD20191176 Project: Select Home Lot 8 - Single Family Residence Project Address: 9618 215th PI SW During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. GENERAL 1) Please submit a Side Sewer Permit Application form TESC 1) Please add note that plat tesc will be maintained during sfr construction or provide a tesc plan for the sfr. SEWER 1) Provide invert elevation at the sewer stub. STORM 1) Show where the retaining wall drainage will discharge to. 2) There is no connection from the perf stub out to the plat drainage stub out.