Loading...
Engineering Comments 1.pdfof ED40CITY OF EDMONDS �° PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr_ ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 6, 2018 FROM: JoAnne Zulauf, Engineering Technician JoAnne.Zulauf@edmondswa.gov RE: Application #: BLD20180942 Project: Select Homes - Single Family Residence Project Address: 20105 Maplewood Drive During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. GENERAL 1) Please note that all standard details have been updated and have new reference numbers. Review the changes on the city website and update plans. 2) Submit ROW Permit Application form 3) Submit Side Sewer Permit Application form 4) In the General Construction Notes, please change the WSDOT/APWA version to the current year. 5) A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 6) Existing driveway approach is not reusable, it is cracked and has grass growing in it. Please show the entire driveway approach to be new asphalt. 7) Please add this note to plans. A cut may be required if the lateral cannot be approved for reuse. "Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required." 8) Add top and toe elevations to the proposed block walls. STORMWATER ENGINEER REVIEW Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson.