Engineering Comments 1.pdfCITY OF EDMONDS
PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425)771-0220
City Website: www.edmondswa.gov
DATE: May 29, 2018
TO: Ron McNurlen
McNurlen@comcast.net
FROM: JoAnne Zulauf, Engineering Division
JoAnne.Zulauf@edmondswa.gov
RE: Application #: BLD20180613
Project: Dolan- Addition
Project Address: 515 Homeland Dr.
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please submit two (2) sets of revised plans/documents
including a written response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, New Updated Standard Details, application and other forms, and
development code may be referenced on the City website: www.edmondswa.gov under
Services/Permits and Development.
General Note:
1) Please note that all standard details have been updated and have new reference numbers.
Review the changes on the city website and update plans.
2) Submit ROW Permit Application form
3) A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. Ensure the stormwater
covenant meets Snohomish County Record Drawing requirements. The document must be
complete, but will not be recorded prior to permit issuance. Prior to construction, final
location of facilities are to be verified (by field inspection and asbuilt) and then the covenant
will be recorded.
4) Please note: additional comments not included in this review may be produced after
reviewing the next submittal.
Sheet 1: Cover Sheet
5) Please revise General Notes to be consistent with the example notes available on the city
website. Updates have been made since the version of general notes used on plan:
a. Replace 2014 to 2018 WSDOT/APWA Standards
b. Remove "Revised 09.30.14" where it occurs
c. Revise Note #21 to reflect contact to be Jeff Koblyk and the email
JEFF . KOB LYKgEDMOND S WA. GO V
Sheet 2: SWPPP and Demolition Plan
1) Show existing trees on plan and indicate which ones will be removed. Orange protective
barrier fencing shall be placed at the drip line of trees to remain and around areas proposed
for low impact development techniques, such as rain gardens, infiltration systems, etc., to
protect the area from compaction.
6) Add silt fence along north clearing limits as well as northeast limits adjacent to slope.
Reference new city standard detail.
7) Add a note that the stockpile is to be covered with anchored plastic within 24 hours of last
use.
8) Under Stabilized Construction Entrance Notes sweeping information shall be consistent with
General Notes #24 regarding prohibiting washing of streets.
9) Move the note regarding using the driveway for the construction entrance to the "Stabilized
Construction Entrance Notes". Call out driveway as temporary construction entrance on
plan.
10) Please show a call out on the drawing and add a SWPPP note to the plans that a filter sock
will be installed in the downstream catch basin at 5th Ave. Reference the new city standard
detail on plans.
11) All existing utilities shall be shown from the city main line/lateral to the structure. Please
show the existing sewer, water, storm, and dry utilities (gas, cable, etc.) on the plan.
12) If any utilities are going to be added or relocated, please show on Drainage/Utility Plan -
Sheet 3 or a separate sheet if it will be easier to read.
STORMWATER ENGINEER REVIEW
Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(a,edmondswa.t!ov with any specific questions you may have regarding his
comments.
Page 2 of 2