Loading...
Engineering Comments 1.pdfCity of Edmonds 121 5" AVENUE NORTH • EDMONDS, PUBLIC WORKS DEPARTMENT Engineering Division Plan Check #: BLD20120286 WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us Date: May 22, 2012 Project Name/Address: Nelson Garage 723 Hanna Park Rd Contact Person/Address/Fax: Kozo Nozawa kozo@prentissarchitects.com Reviewer: JoAnne Zulauf Division: Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa.gov by choosing the Government tab and Public Works) Engineering under Departments: Please Note: Building Handouts do not include updated Engineering Division Requirements. Refer to Engineering Handouts for all Engineering Requirements. Please provide a written response to all comments. Thank you General Plan: Please provide an erosion/sediment control plan for this work. It can be combined with the erosion control plan for the demo. This would meet the erosion control plan requirements for each of the permits. Site Plan: 2. Are there are any utilities (sewer or water) connected to the garage? Are there any new connections planned? If so, please show the connections to garage and where they connect to the other utilities on the site, or if they connect directly to the main utilities. 3. If there are any sewer connections, please provide invert elevations for connection at garage and the connection to the rest of the system. Stormwater: 4. It appears that you will be required to change the location etc of the garage. Any of the foundation that is removed must be treated as "new" impervious surface. Please provide the impervious surface calculations for the garage on the site plan and make sure the square footage Is included in the calculations on the Drainage plan. DATE FAXED/E-MAILED 5/23/2012 PAGE 1 OF 2 5. The plan notes a total of 335.7 cubic yards of cut/fill. This number does not agree with the grading total on the Drainage plan. Please revise this plan or the drainage plan to reflect actual amount. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE FAXED/E-MAILED 5/23/2012 PAGE -2- OF -2-