Loading...
Engineering Comments 1-Lot Line Adjustment.pdfY MEMORANDUM Date: December 4, 2017 To: Jen Machuga, Associate Planner From: JoAnne Zulauf, Engineering Technician Subject: PLN20170050, Landsverk - Lot Line Adjustment 19511 941h PI W Engineering has reviewed the subject lot line adjustment application. Please address the following comments and submit a revised plan for review. The current proposal assumes that the right of way Excelsior Place has been vacated and is no longer public property. The city has no record of the right of way being vacated. There are two options to gain approval of a lot line adjustment: o Complete the road vacation process. Once the vacation is complete the Thank you. proposed lot configuration can be considered; or o Revise the proposal to show the Excelsior right of way. Please note, an access point for new parcel C shall be shown and new parcel A cannot span over the right of way. City of Edmonds