Engineering Comments 2 BLD20161538.pdfOF EDV0 CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION 6'st 1 g90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 6, 2017 TO: Aidan Bird abirdgstudioms.com FROM: Jeanie McConnell, Engineering Program Manager jeanie.mcconnell@edmondswa.gov RE: Application #: bld20161538 Project: Westgate Village Project Address: 10032 Edmonds Way During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please redline plans or submit three (3) sets of revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Comments 1- June 23, 2016 Comments 2 — September 6, 2017 GENERAL 1. September 6, 2017 — Thank you for providing an engineer's cost estimate. Please revise as follows: a. Include traffic control for work performed within the City right-of-way b. Revise sidewalk lineal footage to include curb ramps at the driveway c. Include striping for stop bar and arrows d. Include trash enclosure e. Include parking stall striping within the building f. Include oil/water separator g. Update cost estimate as needed based on the following plan review comments. 6/23/2016 - Provide an itemized engineers cost estimate for both on -site and off -site (right-of- way) improvements, including traffic control and all utility installations. Use the King County Bond Quantity Worksheet (available on the county website) and utilize "write-in" sections where appropriate. The amount of the bond will be based on 120% of the City approved estimate for the off -site improvements. h. A 3.3% inspection fee is calculated for the project based on 120% of the City approved estimate for the entire project improvements. 2. ok 3. ok 4. September 6, 2017 — Response letter states this will be provided by the contractor. Please note, the traffic control plan will need to be submitted to the City prior to permit issuance. 6/23/2016 comment - Provide a Traffic control plan for review and approval. 5. September 6, 2017 — On 8/6/2017 an email was sent regarding the need to update the traffic impact analysis to be consistent with the current project proposal. An incorrect number of apartments, retail square footage and fee rates have been used. To date, I have not seen a revised analysis. Please submit for review and approval. 6. September 6, 2017 — Thank you for updating the plans with the last submittal to show the public pedestrian easement area required for that portion of the sidewalk that falls within private property. As the easement is to be approved by City Council, please provide a reduced size plan sheet (8 V2 x 11 if possible) that specifically details the easement area. • The easement will be taken to Council Committee as the first step (and prior to permit issuance). The next Council Committee meeting is September 26'. • Final approval before City Council will need to occur prior to project completion and at a point when the sidewalk has been constructed to confirm exact location. Please have the requested documentation to me no later than September 191h, in order to make the 9/26 council committee date. This document can be emailed directly to me — ieanie.mcconnell(a-),edmondswa.2ov Sheet CV-1.0 - COVER SHEET 1. ok Sheet CV-1.1— GENERAL NOTES 1. ok 2. ok 3. ok Sheet D-1.0 — DEMOLITION AND ESC PLAN 1. Revise Demolition Key Notes as follows: G: September 6, 2017 — Sheet D-1.0 was updated to reflect relocation of the sign, but references C-1.0 for new location. In reviewing C-1.0 the new location was not found. Please clarify 6/23/2016 comment - The truck route sign on Edmonds way shall be removed when needed during construction and preserved so that it can be re -installed prior to project final. Please revise note or add a new note to reflect this. Also there is a private business sign on private property near Edmonds Way on the old single-family parcel that is to be removed. Please update plans to reflect this. H: September 6, 2017 — Response letter states the re -use of existing DDCVA will be evaluated by OVWSD during their review/approval process. In reviewing the Utility Plan Sheet C-3, it is unclear that the DDCVA is being proposed for relocation. To resolve any Page 2 of 6 potential conflict with OVWSD approvals, please add an approval block to the demolition plan for OVWSD, in addition to the Edmonds approval block. T 6/23/2016 comment - Confirm with OVWSD that this is acceptable. L: ok M: ok 2. A 3. ok 4. A 5. ok 6. A 7. ok 4. A Sheet C-1.0 - SITE PLAN 1. ok 2. A 3. September 6, 2017 - Response letter states notes were added. The stop bar and turn arrows have been shown on the plans, but I didn't see reference to repainting the centerline, travel lanes, etc. Please revise. 6/23/2016 comment - Please add a note to the plans that states the painted stop bar, centerline, etc. will be restriped prior to project completion. 4. ok 5. ok 6. ok 7. ok 8. ok 9. ok 10. A Sheet C-2.0 - GRADING AND DRAINAGE PLAN 1. ok 2. A 3. ok 4. A 5. ok 6. ok 7. ok 8. ok Sheet C-2.1 - ENLARGED GRADING PLANS 1. ok 2. ok Sheet C-3.0 - UTILITY PLAN 1. September 6, 2017 - Response comment states the existing 8" sewer line is located on adjacent private property not controlled by this project and therefore a connection is shown to the main in Edmonds Way. However, the 8" line is a City main line and the City Page 3 of 6 has an easement across the adjacent parcel: AFN 1858336. Please revise the plans to show connection to this existing 8" main line and not in Edmonds Way. 6/23/2016 comment - A sewer manhole shall be installed with an 8" connection to a City sewer main. The sewer main located in Edmonds Way is a 24" line and the sewer main along the west nection to the 8" main line. 2. September 6, 2017 — Thank you for adding the callout. One of the references to Key Note P is not pointing to the sewer entry. Please revise. 6/23/2016 comment - Callout sewer pipe size for lines exiting the building. 3. ok 4. A 5. ok 6. ok 7. September 6, 2017 — Response letter states the pre -application meeting documentation and City GIS information indicated the sewer will be provided by OVWSD. However, upon further review of the project, it has been realized that the original parcel 10032 Edmonds Way is actually a City of Edmonds customer. Furthermore, connection to the 8" line to the northwest of the property creates the least amount of impact to traffic and street disruption and is the preferred approach. Please revise plans accordingly. 6/23/2016 comment - The water system shall be approved by the Olympic View Water and Sewer District. Consider two different plan sheets (a sewer/general utility plan and a separate water plan) or include approval blocks for both Edmonds and Olympic View on the same plan sheet. Sheet C-5.0 — SEWER DETAILS 1. September 6, 2017 — Please refer to Sheet C-3.0 comments 1 and 7 above. 6/23/2016 comment - Revise details to reflect City of Edmonds details. Page 4 of 6 Sheet C-6.3 — STORM DRAINAGE DETAILS 1. ok 2. ok Sheet C-8.2 — PAVING AND SITE DETAILS 1. ok Sheet L101— LANDSCAPE CALLOUT PLAN 1. ok 2. ok Sheet L131— PLANTING PLAN 1. ok 2. Septeber 6, 2017 comment — Plan still states "TBD". Please revise plan accordingly. 6/23/2016 comment — Street tree callout on Edmonds Way should be revised to indicate Acer Rubrum Bowhall Maple. STORMWATER REPORT The following comments are provided from Robert Edwards, Stormwater Engineer. Please contact Robert directly at 425-771-0220 or by email at Robert.edwards(aedmondswa.2ov with any specific questions you may have regarding these comments. September 5, 2017 Comments: Background This is classified as a Large Project because it involves 1 or more acres of land disturbing activity. Large Project are subject to Small Site Minimum Requirements 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, and 11. Minimum Requirement #1— Preparation of Stormwater Site Plan Comments: 1. Storm Drainage Report, Page 108: WWHM modeling is to use the Puget East rain gage, not the Everett rain gage. This is accessible by selecting the WS-DOT data on the project screen. This comment remains unaddressed. The engineer's response "no guidance to use another rain gage is identified in City code or stormwater addendums" is incorrect. The use of the Puget East rain gage has been in effect at the City of Edmonds for 7-years. This is cited in the 2010 Stormwater supplement on page 18, table 4-4, or more recently in the 2017 Addendum, page 5, Section 2-6. Please provide updated hydrologic/hydraulic modeling analyses compliant with this requirement. 2. Storm Drainage Report Pages 119 and 123: Several of the selected BMPs rely on infiltration. The geotechnical report did not perform an infiltration evaluation. An infiltration evaluation needs to be performed and infiltration rate(s) need to be determined for final design of these BMPs. This comment remains unaddressed. As this submittal is for permit and construction, final design must be prepared. Please provide infiltration testing for this final design. 3. Geotechnical Report, Page 9: Infiltration investigation was not performed. This comment remains unaddressed. As this submittal is for permit and construction, final design must be prepared. Please provide infiltration testing for this final design. Page 5 of 6 4. Sheet CV-1.0, General Notes, 435, specify which compaction test is required. (e.g., modified proctor, ASTM D1557) This comment remains unaddressed. The design engineer, being the engineer of record, must specify the proposed compaction testing. 5. Sheet C-2.0, Structure IA: The plans propose a "Type 2 CB (54")*" The proposed CB ties into an existing 36-inch diameter concrete pipe. The maximum pipe allowance for a 54-inch CB is 30-inch concrete pipe. For help in designing Type 2 CBs, see WSDOT Standard Plan B-10.20-01. Please clarify the use of an asterisk in this context. 6. All plan sheets and report are either unstamped, unsigned, or marked "Preliminary Not For Construction" The submittal is for permit and construction and is considered to be a final design. As such, all plans and reports must be stamped and signed per WAC 196-23-20. Please provide stamped and signed plans and reports. 7. Response letter dated July 14, 2017: The letter is addressed to the City of Renton at the City of Renton's address. This project is in the City of Edmonds. Our address is 121 5th Avenue North, Edmonds WA 98020. Minimum Requirement #2 — Construction Stormwater Pollution Plan Comments: None Minimum Requirement #3 — Source Control of Pollution Comments: None Minimum Requirement #4 — Preservation of Natural Drainage Systems Comments: None Minimum Requirement #5 — Onsite Stormwater Management Comments: None Minimum Requirement # 6 — Runoff Treatment Comments: None Minimum Requirement #7 — Flow Control Comments: None Minimum Requirement #8 — Wetland Protection Comments: None Minimum Requirement #9 — Operation and Maintenance Comments: None Minimum Requirement # 10 — Offsite Analysis and Mitigation Comments: None Minimum Requirement #11 — Financial Liability Comments: None Page 6 of 6