Engineering Comments 2.pdfof ED40CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr. ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: March 25, 2019 2nd Comments
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Application #: BLD20181467
Project: Chung - Single Family Residence
Project Address: 719 Edmonds Way Lot 3
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a written
response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, New updated standard details with new reference numbers, application
and other forms, and development code may be referenced on the City website:
www.edmondswa.gov under Services/Permits and Development.
Addresses have been assigned to these lots, please revise all plans accordingly.
Lot 1 721
Lot 2 719
Lot 3 725
GENERAL
1) Done.
2) Done.
3) Done.
4) 3.25.19 Not Done. Submit Side Sewer Permit Application form
5) Done.
6) Done.
7) Done.
8) Done.
9) Done.
10) Ok
11) 3.25.19 Not submitted. A Stormwater Covenant is required to be recorded against the
property based on the proposed stormwater facilities for the project. Please complete the
covenant, including notarization and any required exhibits and submit to the city. Ensure the
stormwater covenant meets Snohomish County Record Drawing requirements. The
document must be complete, but will not be recorded prior to permit issuance. Prior to
construction, final location of facilities are to be verified (by field inspection and asbuilt)
and then the covenant will be recorded.
12) Done.
13) Don.e
14) Done.
15) Done.
16) Done.
17) Ok
TESC-You can use a copy of the tesc plan from the short plat -just add a copy to each set of
drawings in each permit.
1) Done.
2) 3.25.19 Construction entrance is to protect the right of way from debris. It should be located
at the entrance of the short plat on Lot 3. The area where the construction entrance is shown
now is proposed to have pervious pavement. Outline the area and make note that heavy
equipment should avoid the area as much as feasible. Show construction entrance on the
plans and incorporate and reference New City standard de-
3) Done.
4) 3.25.19 Future location of pervious pavement should be protected to the extent possible.
Please add fence to part of it. Orange protective barrier fencing shall be placed at the drip
line of trees to remain and around areas proposed for low impact development techniques,
such as rain gardens, infiltration systems, etc., to protect the area from compaction.
5) Done.
6) Done.
7) Done.
SEWER
1) Done.
2) Done.
3) Done.
STORM
1) Done.
2) 3.25.19 Please show the location they will discharge into the soil per note on C3. Show
where the footing drains will discharge.
3) Done.
4) Done.
5) Done.
STORMWATER ENGINEER REVIEW
Refer to separate plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(&,,edmondswa.gov with any specific questions you may have regarding his
comments.