Engineering Comments 2.pdfCITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: July 12, 2019
TO: Jesse Jarrell @ Western Engineers & Surveyors
jessej@wesi.co
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Subdivision File #: pin20180038
Project: Ta + Hoa Phan Dung 2-lot Short Plat
Project Address: 8616 196th St SW
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please redline plans or submit two (2) sets of revised
plans/documents with a written response to each of the items below to an engineering technician.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
GENERAL
1. 7/15/19 Please review attached edits for approval. Please provide an itemized engineers cost
estimate for both on -site and off -site (right-of-way) improvements, including all utilities, traffic
control, NGPA fencing and restoration/enhancement plantings. Use the King County Site
Improvement Bond Quantity Worksheet and utilize the "write-in" sections where appropriate.
• At a minimum, a bond is required to be placed for all erosion control measures and right-of-
way improvements.
• Please note, if you intend to post a bond in order to record the subdivision and ahead of
constructing the required improvements, the bond amount shall be based on the entire scope
of the project.
• The amount of the bond will be based on 120% of the City approved estimate. The City will
• inform you of the appropriate bond amount after review of the cost estimate. Please obtain
the appropriate subdivision improvement bond forms from the City — available on the City
website.
• Inspection fees for this project will be calculated at 3.3% of the 100% City approved
estimate for all improvements.
2. Done.
3. Done.
4. 7/15/19 Not Done. Street trees are required for properties along 196"'. Please show two street
trees located behind the sidewalk at approximately 30' on center. Add note: Species to be
determined by Park Manager.
5. Done.
Sheet 2 — GRADING AND SWPPP PLAN — Done.
SHEET 3 Missing from submittal.
SHEET 4 ROAD AND DRAINAGE NOTES
New Comment: Please add a note regarding curb replacement. "When replacing curb, it may be
that a 2 ft sawcut is not always required on state routes and 196"' is a state route. Engineer
Inspector will determine if cut is required."
New Comment: Apologies for missing this the first time around: A Stormwater Covenant is
required to be recorded against the property based on the proposed stormwater facilities for the
project. Please complete the covenant, including notarization and any required exhibits and submit
to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing
requirements. The document must be complete, but will not be recorded prior to permit issuance.
Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt)
and then the covenant will be recorded.
SHEET 5 ROAD AND DRAINAGE NOTES AND DETAILS Okay.
SHEET 7 WATER AND SEWER PLANS AND NOTES
1. 7/15/19 There is a note for the 6" c/o etc. with a leader to the house. Please revise. Note that 6"
cleanout required at the property line with 12" lamphole cover with '/2" hexbolts.
2. Done.
3. 7/15/19 Please use a darker line weight for the new services and light for existing. It is unclear
what portion of the sewer line is existing. Add note: If re -using existing side sewer: property
owner must have condition verified. Provide report to the City's Public Works Dept.
4. Done.
5. Done.
6. Done.
7. Done.
Sheet X of X — TRAFFIC CONTROL
1. Done.
STORMWATER ENGINEER REVIEW
Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(a,edmondswa.gov with any specific questions you may have regarding his
comments.
Page 2 of 2
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
LM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 TTY Relay 711
Project Name: Ta Short Plat Date: 5/9/2019
Location: 8616 196th Street SW, Edmonds, WA 98026
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
x no
Project No.:
Activity No.:
PLN20180038
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
9M �-TtSC 2L� ZZB. �S x l Zv = � Z5, ;4M4-18
A LL V�5 l 3 Y`r . "i 8 x 1 z.o OZo � 9 $, 453. 75L4
Tyl,bp. $ U 5 , 31 ^1. I �) x
Page 1 of 9
3.31,='6a,15-1-LlI
EC E V E4
JUN 2 6 2210
DEVELOPMENT SEWC;; F,
COUNTER
Bond Quantity Worksheet_updated.xlsx
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet S15 Web date: 04l03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
300
1
450
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
762
1
610
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
762
1
1524
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
90
1
360
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
1800
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS '** (see page 91
Catch Basin Protection
$ 75.00
Each
3
1
225
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
$ 4,968.60
$ 1,490.58
$ 6,459.18
A
Bond Quantity Worksheet_updated.xlsx
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/0312015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
30
270.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.298
2,980.00
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
30
150.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI-8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
GI-9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
300
7,500.00
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
1444
2,888.00
Monuments, 3' Ion
GI - 19
$ 250.00
Each
Sensitive Areas Sin
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers
GI - 24
$ 120.00
HR
16
1,920.00
'Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete I
GI - 28
$ 55.00
SF
Wall, rockery I
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
2.340.00
13,368.00
`KCC 27A authorizes only one bond reduction.
Bond Quantity Worksheet_updated.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI-4
$ 35.00
SY
20
700.00
95
3,325.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
60
750.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
160
1,120.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
60
111.00
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
60
120.00
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
33
1,254.00
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 32.00
SY
(/
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and disposa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping. thermoplastic. ( for crosswalk )
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
SUBTOTAL
5101 2esm
4,445.00
`KCC 27A authorizes only one bond reduction.
Bond Quantity Worksheet_updated.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" to
course) 9 1/2" Rock= 8" base & 1.5" top course
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
362
10,136.00
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SY
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
HMA Road, 4" w/ 6" CSBC
RS - 8
$ 29.00
SY
20
580.00
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road. 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desi
RS - 15
Thickened Edge
IRS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
580.00
r
`KCC 27A authorizes only one bond reduction.
Bond Quantity Works heet_updated.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$ 21.00
1 SY
Bollards - fixed
D - 2
$ 240.74
rfjch
Bollards - removable
D - 3
$ 452.34
1 Each
(CBs include frame and lid
CB Type I
D - 4
$ 1,500.00
Each
1
1,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type ll, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type ll, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
Cleanout, PVC, 8"
D- 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
50
500.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
Culvert, PVC, 8"
D- 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
340 -wo-w
2,000.00
'KCC 27A authorizes only one bond reduction.
Bond Quantity Works heet_updated.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D- 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D- 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30'
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench 1,436 base+)
D - 50
$ 28.00
LF
52
2892
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
'KCC 27A authorizes only one bond reduction.
Bond Quantity Worksheet_updated.xlsx
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. I Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Water Meter
WI - 1
$ 3,000.00
Each
1
3000
WI-2
Each
WI-3
CY
WI-4
LF
WI-5
FT
WI-6
SY
WI-7
WI-8
WI-9
w1-10
SUBTOTAL 3,000.00
SUBTOTAL (SUM ALL PAGES): 113LPI "2"0
30% CONTINGENCY & MOBILIZATION: 314 08,'7j 2-.707:50
GRANDTOTAL: t �I�D q, 3 14,732.50r
COLUMN: B
Page 8 of 9
`I gol 33; +9roc
V/ I $ aU -3 9,957.30
4441 F71.30 43,148.30
D
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Bond Quantity Worksheet_updated.xlsx Report Date: 5/9/2019
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name:
PE Registration Number:
Jesse Jarrell
45844
Web date: 04/03/2015
Date: 5/9/2019
Tel. #: 425-356-2700
Firm Name: Western Engineers & Surveyors, Inc.
Address: 9740 Evergreen Way, Everett, WA 98204 Project No: PLN20180038
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A) $ 6,459.2
(C) $
(D) $ A4g, IL M. V 4-3;148:3
(T) s&5 31 M � 6 340.a
Minimum is $2000.
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
x 0.30 $ 487402.0
Minimum is $2000.
Date:
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kingcounty.goy/permits Version: 03/02/2015
Bond Quantity Worksheet_updated.xlsx Report Date: 5/9/2019
After recording return to:
City Clerk
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Document Title(s)
Declaration of Covenant - Private Stormwater Facility
Reference Number(s) of Related Documents
City of Edmonds (permit number)
Grantor(s) (Last, First and Middle Initial)
Grantee(s) (Last, First and Middle Initial)
City of Edmonds
Legal Description (abbreviated form; i.e., lot, plat or section, township, range, quarter/quarter)
Assessor's Property Tax Parcel/Account Number at the Time of Recording:
The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or
completeness of the indexing information provided herein.
DECLARATION OF COVENANT
Private Stormwater Facility
WHEREAS, the undersigned Declarant(s) have installed one or more stormwater
facilities under Edmonds Community Development Code Chapter 18.30 known as a "low impact
development best management practices (LID BMP)" as selected below:
❑ Permeable Pavement ❑
❑ Rain Garden / Bioretention Cell ❑
❑ Drywell ❑
Infiltration Trench
Gravelless Chamber
Other
WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the
execution and recording of this Declaration of Covenant; NOW, THEREFORE,
THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the
Property") located at the following address:
in the City of
Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated
herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of
himself/herself/themselves/itself and his/her/their/its successors and assigns, as follows:
Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit
A and have the authority to impose this covenant on the property and bind all future owners,
successors, and assigns of the Declarant(s). The Declarant(s), future owners, successors,
and assigns of the Declarant(s) shall be referred to collectively as "Owners."
2. The Owners of the Property agree that the Property contains one or more stormwater
management facilities referred to as an "LID BMP," which was installed to mitigate the
stormwater quantity and quality impacts of some or all of the impervious or non-native
pervious surfaces on the property. "Low impact development" means development
conducted in a way that seeks to minimize or completely prevent alterations to the natural
hydrology of the site. Low impact development includes site planning and design to reduce
alterations of natural soil and vegetation cover, minimize impervious surfaces, and specific
practices that help to replicate natural hydrology such as permeable pavements, green
roofs, soil amendments, bioretention systems, and dispersion of runoff.
3. The Owners shall maintain the size, placement, and design of the LID BMP as depicted on
the approved site plan, Exhibit B, and design details shall be maintained and may not be
changed without written approval either from the Engineering Division of the City of
Edmonds or through a future development permit from the City of Edmonds. Chemical
fertilizers and pesticides shall not be used where LID BMP is located. All costs of
maintenance and repair shall be the sole responsibility of the Owners.
4. The Owners shall inspect LID BMPs annually for physical defects. After major storm
events, the system shall also be checked to ensure that the overflow system is working
properly. The Owners also shall maintain all LID BMPs so they function as designed on a
year-round basis.
5. The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to
enter upon the Property described on Exhibit A at all reasonable times for the purpose of
inspecting the private stormwater LID BMP facility. If, as the result of any such inspection,
the City of Edmonds determines that the LID BMP is in disrepair, requires maintenance or
repair, or is otherwise not functioning as provided in the BMP site plan, the City Engineer
or his designee shall have the right, but not the obligation, to order the Owners to maintain
or repair the same.
6. If the City of Edmonds determines that the LID BMP requires maintenance or repair
pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the
deadline within which such maintenance or repair must be completed. Said notice may
further advise that, should the violator fail to perform required maintenance or make repairs
within the established deadline, the work may be done by the city or a contractor designated
by the City Engineer and the expense thereof shall be charged to the Owners. The City's
officers, agents, employees, and contractors shall have the right, which is hereby granted
by the Owners, to enter upon the Property described on Exhibit A in order to perform such
work. The Owners shall bear the cost of all work performed.
7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers,
officials, employees and agents from any and all claims, demands, suits, penalties, losses,
damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of or
in any way resulting from the approval of the LID BMP(s), the installation and presence
of the LID BMP(s), and the acts or omissions of the Owners, their officers, employees,
contractors, and agents relating to the construction, operation and maintenance of the LID
BMP(s) on the Property, except for the City's intentional and willful tortious acts, and
waive and release the City of Edmonds from any and all claims for damages and injunctive
relief which the Owners may themselves have now or in the future, by reason of the
construction, maintenance and operation of said LID BMP(s).
8. This covenant shall run with the land and be binding upon the Owners.
Dated:
DECLARANT(S):
(Signature)
(Print Name)
(Signature)
(Print Name)
State of Washington
ss.
County of Snohomish
APPROVED:
CITY OF EDMONDS
(Signature)
(Print Name)
(Title)
On this day personally appeared before me
{Declarant(s)} to me known to be the individual, or individuals described in and who executed
the within and foregoing instrument, and acknowledged that he/she/they signed the same as
his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned.
SUBSCRIBED AND SWORN before me this day of , 201_.
(Signature)
(Name legibly printed or stamped)
Notary Public in and for the State of Washington.
Residing at:
My commission expires
Exhibit A
Legal description
Exhibit B
Site Plan