Loading...
Engineering Comments 2.pdfof ED40CITY OF EDMONDS �° PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr_ ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 9, 2019 TO: Kristin Hanson hansondesign@hotmail.com FROM: JoAnne Zulauf, Engineering Technician JoAnne.zulauf@edmondswa.gov RE: Application #: BLD20190849 Project: Azar - Addition Project Address: 8202 Talbot During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. TESC Done. STORM 1) 9/9/19 The sf under Lot coverage for the proposed new res/porch is listed at 2031. This amount should be the structure only, no roofline. In green for the impervious surface, the new roof is listed at 1158 sf. That does not make sense. The impervious surface should include the eves so it will always be a larger number than the lot coverage. Please revise. 9/9/19 Why is the breezeway crossed off? The impervious surface should be added to the proposed imp surface numbers unless that concrete already exists. If it does, please label as existing. Please provide the impervious surface calculations per example table below. Type of area Square footage Year Constructed -For Existing Existing Roofline Existing Driveway Existing Etc... Proposed Add Roofline Proposed Patio Proposed Etc... 2) Done. 3) Done.