Engineering Comments 2.pdfof ED40CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr. ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: March 19, 2019, May 8, 2019 FROM: JoAnne Zulauf, Engineering Program Manager Joanne.zulauf@edmondswa.gov RE: Application #: bld20181634 Project: Vons Bell ST - 4 unit Project Address: 650 Bell St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Please submit revised plans/documents with a written response to each of the items below to a permit coordinator. Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details and development code can be referenced on the City website. Please remove all clouding from the civil plans. GENERAL 1. 519119 Not received. Please submit as a separate document. Not used specifically as part of the stormwater report. (but it was not in the storm report as noted.) Provide an itemized engineers cost estimate for both on -site and off -site (right-of-way) improvements, including traffic control and all utility installations. Use the King County Bond Quantity Worksheet (available on the county website) and utilize "write-in" sections where appropriate. a. The amount of the bond will be based on 120% of the City approved estimate for the off - site improvements. b. A 3.3% inspection fee is calculated for the project based on 100% of the City approved estimate for the entire project improvements. 2. Done. 3. 519119 Not received. Please submit as a separate document as it will be recorded at the county. A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. 4. Done. SHEET C01 TESC PLAN - Done SHEET CO2 GRADING PLAN -Done SHEET CO3 FRONTAGE IMPROVEMENTS -Done SHEET C04 DRAINAGE AND UTILITY PLAN 1. Done. 1) Done. 2. Done. 3. Okay per Building 1) 519119 This note and the next one are not contradictory. Please add them verbatim. This one is regarding the sewer lateral pipe from the main to the property line. The next one is about the side sewer pipe from property line to the house. Add note to plan: If the existing sewer lateral is proposed to be reused, the City's Public Works Department will need to TV the lateral to determine if it is acceptable to re -use. Add notes to the plans to contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection. 4. 519119 Please add. Add note to plan: The existing side sewer will need to be TV'd by the contractor and video must be submitted to the City for review and approval to re -use. 5. Done. 6. Done. 7. Done. 8. Done. 9. Done. 10. Done. 11. Done. Sheet X of X — TRAFFIC CONTROL 1. 519119 Not received 2. 519119 Not received Sheet X of X — LANDSCAPE PLAN - Done STORMWATER ENGINEER REVIEW Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson. Please contact Zack directly at 425-771-0220 or by email at zachary.richardson(a,edmondswa.t!ov with any specific questions you may have regarding his comments. Page 2 of 2