Engineering Comments 2.pdfof ED40CITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr. ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: March 19, 2019, May 8, 2019
FROM: JoAnne Zulauf, Engineering Program Manager
Joanne.zulauf@edmondswa.gov
RE: Application #: bld20181634
Project: Vons Bell ST - 4 unit
Project Address: 650 Bell St
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents with a written
response to each of the items below to a permit coordinator.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
Please remove all clouding from the civil plans.
GENERAL
1. 519119 Not received. Please submit as a separate document. Not used specifically as part of
the stormwater report. (but it was not in the storm report as noted.) Provide an itemized
engineers cost estimate for both on -site and off -site (right-of-way) improvements, including
traffic control and all utility installations. Use the King County Bond Quantity Worksheet
(available on the county website) and utilize "write-in" sections where appropriate.
a. The amount of the bond will be based on 120% of the City approved estimate for the off -
site improvements.
b. A 3.3% inspection fee is calculated for the project based on 100% of the City approved
estimate for the entire project improvements.
2. Done.
3. 519119 Not received. Please submit as a separate document as it will be recorded at the
county. A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. The document must be complete,
but will not be recorded prior to permit issuance. Prior to construction final location of facilities
are to be verified (by field inspection and asbuilt) and then the covenant will be recorded.
4. Done.
SHEET C01 TESC PLAN - Done
SHEET CO2 GRADING PLAN -Done
SHEET CO3 FRONTAGE IMPROVEMENTS -Done
SHEET C04 DRAINAGE AND UTILITY PLAN
1. Done.
1) Done.
2. Done.
3. Okay per Building
1) 519119 This note and the next one are not contradictory. Please add them verbatim. This
one is regarding the sewer lateral pipe from the main to the property line. The next one is
about the side sewer pipe from property line to the house. Add note to plan: If the existing
sewer lateral is proposed to be reused, the City's Public Works Department will need to TV
the lateral to determine if it is acceptable to re -use. Add notes to the plans to contact
Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection.
4. 519119 Please add. Add note to plan: The existing side sewer will need to be TV'd by the
contractor and video must be submitted to the City for review and approval to re -use.
5. Done.
6. Done.
7. Done.
8. Done.
9. Done.
10. Done.
11. Done.
Sheet X of X — TRAFFIC CONTROL
1. 519119 Not received
2. 519119 Not received
Sheet X of X — LANDSCAPE PLAN - Done
STORMWATER ENGINEER REVIEW
Refer to attached plan review comments by City Stormwater Engineer, Zachary Richardson.
Please contact Zack directly at 425-771-0220 or by email at
zachary.richardson(a,edmondswa.t!ov with any specific questions you may have regarding his
comments.