Engineering Comments 2.pdfCITY OF EDMONDS PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov DATE: October 7, 2019 FROM: JoAnne Zulauf Engineering Technician RE: Application #: bld20190884 Project: CHC Fill and Grade Project Address: 23320 Highway 99 1.The following items must be submitted and reviewed prior to permit issuance. a. Olympic View Water and Sewer District approved plans. b. Covenant -signed and notarized -not recorded. 2.Please submit a Performance Bond in the amount of $21,118.50. See attached revised bond quantity worksheet. 3.A pedestrian easement is required for the 3ft of public sidewalk that will be encroaching on CHC private property. A legal description and exhibit showing the strip of sidewalk is required. Attached is the standard city pedestrian easement form to complete. As this requirement was overlooked on the first round of comments, it will not prevent the permit from being issued. W20190884_chc-2.docx Page 1 of 1 Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015 LM King County CITY COPY Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600. 206-296-6600 M Relay 711 Project Name: Community Health Center Expansion Date: 9/17/2019 Location: 23320 Highway 99 Project No.: Activity No.: Clearing greater than or equal to 5,000 board feet of timber? yes X no If yes, Forest Practice Permit Number: (RCW 76.09) 5LD2,019 .13 ?-SLJ Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. RPW } TIr 5C. 1-715 `l$ .15 9 t ZD `* - La- ► , t 1 g , 6 0 3 o N'N - hLL IMP 5o1198. 5q x 3.3°l. _ l (pl(o. 35 1n6p. f-eO Page 1 of 9 Completed li-wks-sbq-xls (CHC).xls RESUB SEP 2 0 2019 Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015 Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & compaction -embankment ESC-1 $ 6.00 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 95.00 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF 135 1 203 Fence, Temporary (NGPE) ESC-7 $ 1.50 LF 480 1 720 Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.80 SY Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 2.00 SY Piping, temporary, CPP, 6" ESC-12 $ 12.00 LF Piping, temporary, CPP, 8" ESC-13 $ 14.00 LF Piping, temporary, CPP, 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 4.00 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'x15'x1' ESC-17 SWDM 5.4.4.1 $ 1,800.00 Each 1 1 1800 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 3,200.00 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 2,200.00 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 1.00 SY ESC-23 SWDM 5.4.2.5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR 10 1 1100 Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR WRITE -IN -ITEMS **** (see page 9) WJ r - Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 Completed li-wks-sbq-xls (CHC).xls $ 3,822.50 $ 1,146.75 $ 4,969.25 A Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 $ 6.00 CY Backfill & Compaction- trench GI - 2 $ 9.00 CY Clear/Remove Brush, by hand GI-3 $ 1.00 SY Clearing/Grubbing/Tree Removal GI - 4 $10,000.00 Acre Excavation - bulk GI - 5 $ 2.00 CY Excavation - Trench GI - 6 $ 5.00 CY Fencing, cedar, 6' high GI-7 $ 20.00 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 20.00 LF Fencing, chain link, gate, vinyl coated. 2C GI - 9 $ 1.400.00 Each Fencing, split rail, 3' high GI - 10 $ 15.00 LF Fill & compact - common barrow GI - 11 $ 25.00 CY Fill & compact - gravel base GI - 12 $ 27.00 CY 133.333 3.600.00 Fill & compact - screened topsoil GI - 13 $ 39.00 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 65.00 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 90.00 SY Gabion. 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading, fine, by hand GI - 17 $ 2.50 SY Grading, fine, with grader GI - 18 $ 2.00 SY 133.333 266.67 Monuments, 3' long GI - 19 $ 250.00 Each Sensitive Areas Sin GI - 20 $ 7.00 Each Sodding, V deep, sloped ground GI - 21 $ 8.00 SY Surveying, line & grade GI - 22 $ 850.00 Day Surveying, lot location/lines GI - 23 $ 1,800.00 Acre Traffic control crew ( 2 flaggers) GI - 24 $ 120.00 HR Trail, 4" chipped wood GI - 25 $ 8.00 SY Trail, 4" crushed cinder GI - 26 $ 9.00 SY Trail, 4" top course GI - 27 $ 12.00 SY Wall, retaining, concrete GI - 28 $ 55.00 SF Wall, rockery GI - 29 $ 15.00 SF Page 3 of 9 SUBTOTAL 3,866.67 *KCC 27A authorizes only one bond reduction Completed li-wks-sbq-xls (CHC).xls Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant Cost Quant. Cost Quant. Cost ROADIMPROVEMENT No. AC Grinding, 4' wide machine < 1000sy RI - 1 $ 30.00 SY AC Grinding, 4' wide machine 1000-2000 RI - 2 $ 16.00 SY AC Grinding, 4' wide machine > 2000s RI - 3 $ 10.00 SY AC Removal/Disposal RI - 4 $ 35.00 SY Barricade, type III ( Permanent) RI-6 $ 56.00 LF Curb & Gutter, rolled RI-7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF Curb and Gutter, demolition and disposal RI - 9 $ 18.00 LF Curb, extruded asphalt RI - 10 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF Sawcut, asphalt. 3" depth RI - 12 $ 1.85 LF Sawcut, concrete, per 1" depth RI - 13 $ 3.00 LF Sealant, asphalt RI - 14 $ 2.00 LF Shoulder, AC, ( see AC road unit price ) RI - 15 $ - SY Shoulder, gravel. 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 38.00 SY 133.333 5,066.67 Sidewalk, 4" thick, demolition and dispos RI - 18 $ 32.00 SY Sidewalk, 5" thick RI - 19 $ 41.00 SY Sidewalk. 5" thick, demolition and dispos RI - 20 $ 4000 SY Sign, handicap RI - 21 $ 85.00 Each Striping, per stall RI - 22 $ 7.00 Each Striping, thermoplastic, ( for crosswalk) RI - 23 $ 3.00 SF Striping, 4" reflectorized line RI - 24 $ 0.50 LF Page 4 of 9 SUBTOTAL 5,066.67 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Completed li-wks-sbq-xis (CHC).xls Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost ROAD SURFACING No. K' Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course) Additional 2.5" Crushed Surfacing RS - 1 $ 3.60 SY HMA 1/2" Overlay. 1.5" RS - 2 $ 14.00 SY HMA 1/2" Overlav 2" RS - 3 $ 18.00 SY HMA Road, 2", 4" rock, First 2500 SY RS - 4 $ 28.00 SY HMA Road, 2", 4" rock, Qtv. over 2500 Sl RS-5 $ 21.00 SY HMA Road. 3". 9 1/2" Rock. First 2500 SY RS-6 $ 42.00 SY HMA Road, 3", 9 1/2" Rock, Qty Over 250 RS - 7 $ 35.00 SY Not Used RS - 8 Not Used RS - 9 HMA Road, 6" Depth, First 2500 SY RS - 10 $ 33.10 SY HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 $ 30.00 SY HMA 3/4" or 1 ", 4" Depth RS - 12 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 13 $ 15.00 SY Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 $ 10.00 SY PCC Road (Add Under Write -Ins w/Desic gi RS - 15 Thickened Edge RS - 17 $ 8.60 LF Page 5 of 9 SUBTOTAL Unit prices updated: 03/02/2015 'KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. I Cost QuantT Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe Access Road, R/D D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each (CBs include frame and lid) CB Tvpe I D - 4 $ 1,500.00 Each CB Tvpe IL D - 5 $ 1.750.00 Each CB Type 11. 48" diameter D - 6 $ 2,300.00 Each for additional depth over 4' D - 7 $ 480.00 FT CB Type II, 54" diameter D - 8 $ 2,500.00 Each for additional depth over 4' D - 9 $ 495.00 FT CB Type 11. 60" diameter D - 10 $ 2.800.00 Each for additional depth over 4' D - 11 $ 600.00 FT CB Type II, 72" diameter D - 12 $ 3,600.00 Each for additional depth over 4' D - 13 $ 850.00 FT Throuah-curb Inlet Framework (Add) D - 14 $ 400.00 Each Cleanout, PVC, 4" D - 15 $ 150.00 Each Cleanout, PVC, 6" D - 16 $ 170.00 Each Cleanout, PVC, 8" D - 17 $ 200.00 Each Culvert. PVC. 4" D - 18 $ 10.00 LF 100 1.000.00 Culvert, PVC, 6" D - 19 $ 13.00 LF It,00 260 3,250.00 Culvert, PVC, 8" D - 20 $ 15.00 LF I'1 Culvert. PVC, 12" D - 21 $ 23.00 LF Culvert. CMP. 8" D - 22 $ 19.00 LF Culvert, CMP, 12" D - 23 $ 29.00 LF Culvert, CMP, 15" D - 24 $ 35.00 LF Culvert, CMP, 18" D - 25 $ 41.00 LF Culvert. CMP. 24" D - 26 $ 56.00 LF Culvert, CMP, 30" D - 27 $ 78.00 LF Culvert, CMP, 36" D - 28 $ 130.00 LF Culvert, CMP, 48" D - 29 $ 190.00 LF Culvert. CMP. 60" D - 30 $ 270.00 LF Culvert, CMP, 72" D - 31 $ 350.00 LF Page 6 of 9 SUBTOTAL H J;O -9 4,250.00 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Culvert, Concrete, 8" D - 32 $ 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF Culvert. Concrete. 15" D- 34 $ 42.00 LF Culvert. Concrete. 18" D - 35 $ 48.00 LF Culvert, Concrete, 24" D - 36 $ 78.00 LF Culvert, Concrete, 30" D - 37 $ 125.00 LF Culvert. Concrete. 36" D - 38 $ 150.00 LF Culvert, Concrete, 42" D - 39 $ 175.00 LF Culvert, Concrete, 48" D - 40 $ 205.00 LF Culvert. CPP. 6" D - 41 $ 14.00 LF Culvert, CPP, 8" D - 42 $ 16.00 LF Culvert, CPP, 12" D - 43 $ 24.00 LF Culvert. CPP, 15" D - 44 $ 35.00 LF Culvert, CPP, 18" D - 45 $ 41.00 LF Culvert, CPP, 24" D - 46 $ 56.00 LF Culvert, CPP, 30" D - 47 $ 78.00 LF Culvert. CPP. 36" D - 48 $ 130.00 LF Ditching D - 49 $ 9.50 CY Flow Dispersal Trench (1,436 base+) D - 50 $ 28.00 LF French Drain (3' depth) D - 51 $ 26.00 LF Geotextile, laid in trench, polypropylene D - 52 $ 3.00 SY Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 2.000.00 Each Pond Overflow Spillwav D - 55 $ 16.00 SY Restrictor/Oil Separator, 12" D - 56 $ 1,150.00 Each Restrictor/Oil Separator, 15" D - 57 $ 1,350.00 Each Restrictor/Oil Separator. 18" D - 58 $ 1.700.00 Each Riprap, placed D - 59 $ 42.00 CY Tank End Reducer (36" diameter) D - 60 $ 1,200.00 Each Trash Rack. 12" D - 61 $ 350.00 Each Trash Rack, 15" D - 62 $ 410.00 Each Trash Rack, 18" D - 63 $ 480.00 Each Trash Rack, 21" D - 64 $ 550.00 Each Page 7 of 9 SUBTOTAL Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit QuantT Price Quant. Cost Quant, Cost PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY NA NA 2" AC, 1.5" top course & 2.5" base cours PL - 2 $ 28.00 SY NA NA .4" select borrow PL - 3 $ 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL-4 $ 14.00 SY NA NA UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate Utility Pole(s) Relocation UP-1 Lump Sum Street Liaht Poles w/Luminaires UP-2 $ 7.500.00 Each 'WRITE -IN -ITEMS (Such as detention/water quality vaults.) No. Stormwater Vault WI - 1 Each Block Wall WI - 2 $ 16.00 SY Yard Drain WI - 3 $ 225.00 EA 8 1,800.00 Tree Grates WI - 4 $ 6.00 EA 1000 6000 Landscaping / Planter Boxes WI - 5 $ 1.000.00 SF 10 10.000.00 WI-6 WI-7 WI-8 WI-9 WI-10 SUBTOTAL SUBTOTAL (SUM ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 6,000.00 $ (, U 5 6,000:00 7G19.5 1,800.017 ((�.5 7;800:00 B C LI S00. 06- Zzj� 53�.3�24,983:33" 1(0(� l • 50 7.495-00- 3 31 l�l9.8 32,478.33 D Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Completed li-wks-sbq-xls (CHC).xls Report Date: 9/20/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Original bond computations prepared by: Name: Date: PE Registration Number: Tel. #: Firm Name: Address: Project No: Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D) = TOTAL Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND* REDUCTION (A) (B) (C) FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND* TEMPORARY OCCUPANCY AT $ ��3y, ZJ 4,969.3 SUBSTANTIAL COMPLETION *** $ It a(�. 5� .7-,800.0- (D) $ 33, Iql. Sq 32;47"- (A+B) $ I-7, 5ff8.151-2.,769.a-- (T) $cj� �7�$ . 45,247--.6•- Minimum is $2000. T x 0.30 $ 13,574.3 Minimum is $2000 (B+C) x 0.25 = $ 1;950,0 _ Minimum is $2000. Date: * NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of 9 Unit prices updated: 03/02/2015 Check out the DDES Web site at.www.kin_qcounty._qoy1permits Version: 03/02/2015 Completed li-wks-sbq-xis (CHC).xls Report Date: 9/20/2019 I Return Address: City Clerk City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 PEDESTRIAN EASEMENT Property Address: Assessor's Property Tax Parcel No.: IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, , ("GRANTORS") hereby grant to the CITY OF EDMONDS, a Washington Municipal Corporation ("GRANTEE"), a permanent public pedestrian easement for the location and operation of a sidewalk and necessary appurtenances, over, across, through, and below the following described property, together with the right of access to the easement at any time for the stated purposes. The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, and is more particularly described and depicted in Exhibit A, attached hereto and incorporated herein by this reference. GRANTORS understand and agree for themselves and their successors and assigns not to cause or allow the construction or maintenance of any building or other structure in or upon the area conveyed without the prior written consent of GRANTEE, which may be granted or allowed in GRANTEE'S sole discretion. GRANTORS understand and agree that GRANTEE may cause the summary removal of any such building or structure so placed without GRANTEE'S consent and that GRANTORS shall make no claim for and shall hold GRANTEE harmless from any claim by a third person for damage to or destruction of the property so removed. GRANTEE agrees to indemnify, defend and hold GRANTORS harmless from any and all liability or damage, including attorneys' fees and costs, incurred or arising directly from GRANTEE's use of the easement as stated above, except those arising from any of GRANTORS' acts, omissions or negligence. GRANTORS expressly reserve all rights not inconsistent with those granted to GRANTEE herein. DATED THIS DAY OF Grantor STATE OF WASHINGTON ) ) ss COUNTY OF SNOHOMISH) 2019_ On this day personally appeared before me to me known to be the individuals described in and who executed the within and foregoing instrument and acknowledged that signed the same as free and voluntary act and deed, for the uses and purposes therein mentioned. UNDER MY HAND AND OFFICIAL SEAL THIS DAY OF , 20 NOTARY PUBLIC in and for the State of Washington, residing at Pedestrian Easement (002) (with SEC edits) 7.15.19.doc Accepted by the City Council dated day of 2019. CITY OF EDMONDS David O. Earling, Mayor ATTEST/AUTHENTICATED: Scott Passey, City Clerk 1:11;97 ZG1�/91 ."WoC6]1C6] 7uA Office of the City Attorney Pedestrian Easement (002) (with SEC edits) 7.15.19.doc