Loading...
Engineering Comments 2-Landsverk-LLA-PLN20170050.pdfDate: To: From: Subject: MEMORANDUM April 18, 2018 Jen Machuga, Associate Planner Jeanie McConnell, Engineering Program Manager PLN20170050, Landsverk - Lot Line Adjustment 19511 94tb Pl W Engineering has reviewed the second submission of the plans on March 6th for the subject lot line adjustment application. Please address the following comments and submit a revised plan for review. Comments 1 — December 4, 2017 Comments 2 — April 18, 2018 April 18, 2018 — The applicant's response cover letter, dated March 12, 2018, states that the street vacation will be submitted concurrently. Please note the Engineering Division is not able to complete review of the lot line adjustment until the street vacation application has been reviewed and decision has been made by the City Council. December 4, 2017 - The current proposal assumes that the right of way Excelsior Place has been vacated and is no longer public property. The city has no record of the right of way being vacated. There are two options to gain approval of a lot line adjustment: o Complete the road vacation process. Once the vacation is complete the proposed lot configuration can be considered; or o Revise the proposal to show the Excelsior right of way. Please note, an access point for new parcel C shall be shown and new parcel A cannot span over the right of way. Thank you. City of Edmonds