Loading...
Engineering Comments 3-email-Westgate Village-bld20161538.pdfFrom: McConnell, Jeanie To: "Luke Randles" Cc: "Anthony Jansen"; Johns, Kristin Subject: Westgate Village - bld20161538 Date: Tuesday, November 21, 2017 10:49:17 AM Good morning Luke, I have completed review of the civil construction plans and the recently revised/resubmitted water and sewer plan sheets. At this time we'd like to receive two sets of civil construction plans printed on paper not larger than 24x36. All plan review revisions that were "clouded" throughout the review process are to be shown without clouding. In addition, if you could please make the following minor revisions before printing, that would be great. 1) D-1.0 — please note existing asphalt entrance/drive shall be maintained for as long as possible during construction. 2) C-1.0 — please add note with the 8-foot dimension and the 5-foot dimension along the property frontage that this refers to the proposed sidewalk and landscape planter respectively. With the easement area hatching and other notes this is a bit difficult to decipher. 3) C-3.0 — a. Please label the sanitary sewer easement on the west side of the property as a "public" easement b. Revise Construction Key Note C to reflect Grease Interceptor "under separate plumbing permit". c. In Enlarged View of sanitary sewer system, add note similar to: Obtain construction easements on adjacent McDonald's property, as needed, prior to start of sewer manhole installation. 4) C-5.0 — Remove Grease Interceptor detail In addition to the above, the last steps that need to be taken prior to Engineering Division building permit sign off include the following: 1) Please submit 2 copies of the approved Olympic View Water & Sewer District plan sheets for inclusion in the final civil plan set. 2) Revise the Engineers Cost Estimate to include the following: a. Sanitary sewer improvements b. Bioretention cell c. Baker tank d. Power pole relocation Please let me know if you have any questions. I am here until noon tomorrow and then off for the holiday weekend. Happy Thanksgiving! -Jeanie Jeanie McConnell - Engineering Program Manager j eanie.mcconnellOedmondswa.gov 425-771-0220, ext 1338 Web Map: www.maps.edmondwa.gov Permit Center Hours: M, T, Th, F - 8:00am - 4:30pm Wednesdays-8:30am - noon