Engineering Comments 4.pdfof ED40CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
ENGINEERING DIVISION
�sr_ ig90 (425) 771-0220
City Website: www.edmondswa.gov
DATE: July 12, 20194`h review
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Application #: BLD20181593
Project: Dynasty Homes - Single Family Residence
Project Address: 18109 Homeview Dr. (7329 182nd St SW)
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents including a written
response to each item below.
Resubmittals can be made at the Development Services Department on the 2nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, New updated standard details with new reference numbers, application
and other forms, and development code may be referenced on the City website:
www.edmondswa.gov under Services/Permits and Development.
1. 7112119 Same as original comment: Exhibit A and Exhibit B are missing from the
covenant. The covenant is to be notarized but not recorded. Please provide a complete
covenant with the two required exhibits. Exhibit B, the site plan, shall be easily readable -no
contours just show the proposed residence outline and the storm system and label it.
5.20.19 May response letter states a new site plan was submitted but there is none in the
resubmittal. Also the covenant must be signed and notarized by the property owner.
3.14.19 The assessor will not accept the exhibit attached. It must be clean and clearly
readable. Please remove all extraneous lines and information. The drawing shall only show
property lines, an outline of the house and driveway, and the outline of the infiltration
trenches. No contours or any other info is necessary. A Stormwater Covenant is required to
be recorded against the property based on the proposed stormwater facilities for the project.
Please complete the covenant, including notarization and any required exhibits and submit to
the city. Ensure the stormwater covenant meets Snohomish County Record Drawing
requirements. The document must be complete, but will not be recorded prior to permit
issuance. Prior to construction, final location of facilities are to be verified (by field
inspection and asbuilt) and then the covenant will be recorded.
2. 7112119 DONE. 5.20.19 New Comment: Please provide top and toe elevations for each
end of the driveway walls and at every two feet of change.
3. 7112119 New Comment The "Cover and Site Plan " shows the driveway in a different
location that the rest of the plan sheets.