Engineering Comments 4.pdfof ED40 CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS ENGINEERING DIVISION �sr_ ig90 (425) 771-0220 City Website: www.edmondswa.gov DATE: September 24, 2018 4th Submittal TO: Monica Koehl, Beyler Consulting, mkoehlgbeylerconsulting com FROM: JoAnne Zulauf, Engineering Technician joanne.zulauf@edmondswa.gov RE: Subdivision File #: p1n20160035 Project: Chung 3-Lot Short Plat Project Address: 721 Edmonds Way There are two items that are necessary to approve these plans. Please respond with all the information necessary to satisfy the two items. Items number 3, and 4 can wait until the plans are ready to issue. 1. We cannot accept a separate civil set for OVWSD that does not match the sheets of the main set. A contractor will not be able to work from two separate civil sets. Also the sheets that were supposed to be approved by OVWSD are not signed. Please submit copies of Sheet C8, C9 and C10 from the main civil set signed by OVWSD. The signatory block has been on each of those sheets from the beginning. Do not resubmit M pages from the separate civil set that was created. We will not accept them. 2. Please submit the King County Site Improvements Worksheet so the bond amount can be determined. This needs to be completed by the engineer. The property owner will not be able to note all the lengths of pipe, catch basins, etc. The worksheet is available on the King County Website. Please add all sewer and water improvements too. Use the add -in area at the bottom of page 9 if needed. This will be reviewed upon submittal. Please complete as comprehensively as possible to avoid comments and another delay. Once this is submitted, reviewed and approved, the bond amount can be provided to the property owner. 3. Please submit a side sewer application. An application is attached. 4. A right of way application signed by a licensed contractor signed is required to issue the plans. This can wait until the plans are ready to pick up.