Engineering Comments.pdfCITY OF EDMONDS
CIVIL PLAN REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: June 5, 2019
TO: Donna Breske
donnab@donnabreske.com
FROM: JoAnne Zulauf, Engineering Technician
Joanne.zulauf@edmondswa.gov
RE: Subdivision File #: pin20180057
Project: Groset 2-Lot Short Plat
Project Address: 22027 961h Ave W
The plans and stormwater report have been approved. Please provide the following items to
complete the review process:
1. Please provide an itemized engineers cost estimate for both on -site and off -site (right-of-way)
improvements, including all utilities (sewer storm and water), traffic control, NGPA fencing and
restoration/enhancement plantings. Use the King County Site Improvement Bond Quantity
Worksheet and utilize the "write-in" sections where appropriate.
• At a minimum, a bond is required to be placed for all erosion control
measures and right-of-way improvements.
• Please note, if you intend to post a bond in order to record the
subdivision and ahead of constructing the required improvements, the
bond amount shall be based on the entire scope of the project.
• The amount of the bond will be based on 120% of the City approved
estimate. The City will inform you of the appropriate bond amount
after review of the cost estimate. Please obtain the appropriate
subdivision improvement bond forms from the City — available on the
City website.
• Inspection fees for this project will be calculated at 3.3% of the 100%
City approved estimate for all improvements.
2. Please provide a right of way permit application signed by the contractor. (this can be provided
at time the plans are issued if not able to provide now).