Loading...
Engineering Comments-3.pdfof ED,v CITY OF EDMONDS CIVIL PLAN REVIEW COMMENTS 4�3"'A ENGINEERING DIVISION .(425) 771-0220 City Website: www.edmondswa.gov DATE: November 5, 2018, March 5, 2019, July 12, 2019 TO: Taylor Engineering ClearvisionHome@gmail.com FROM: JoAnne Zulauf, Engineering Technician Joanne.zulauf@edmondswa.gov RE: Subdivision File #: pin20070059 Project: Clear Vision 2 lot Short Plat Project Address: 18227 80th Ave W 7112119 Not received. The site plan does not show the ped easement area nor do the short plat recording plans. Since we are getting to the end of this process we will need the full documents correctly submitted as soon as possible. - Attached you will find the city's pedestrian easement template. --Please complete and provide recordable exhibits as referenced in the easement language. --Enter "Snohomish County Recording Requirements" in Google to learn what the document format should be. --Do not sign and notarize until City has reviewed and approved. 3.5.19 Not Received. The location of the mailbox requires a portion of the public sidewalk to be over private property. A pedestrian easement shall be granted to the city for this area. The approval of such shall be brought before City Council. The first step is a Council Committee process and the second step is approval before the full Council. The following shall be provided by the applicant: a. Vicinity Map b. Site Plan showing improvements and location of easement; and/or c. Site Plan showing public right-of-way dedication The next available meeting date is Deeember- 11,2April 2019 the next second Tuesday from when you submit the dots. It takes about 2 months. See previous comment letters for more information regarding the process. 7112119 A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. Ensure the stormwater covenant meets Snohomish County Record Drawing requirements. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction, final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded. Attached. 7112119 Please see the attached bond quantity worksheet with markups. If there are no changes required, please acknowledge your agreement so I can proceed with fee calculations. Page 2 of 2 Return Address: City Clerk City of Edmonds 121 - 5th Ave. N. Edmonds, WA 98020 PEDESTRIAN EASEMENT Property Address: Assessor's Property Tax Parcel No.: IN CONSIDERATION of benefits to accrue to the grantors herein, the undersigned, XXXXXX, ("GRANTORS") hereby grants to the CITY OF EDMONDS, a Washington Municipal Corporation ("GRANTEE"), a permanent public pedestrian easement for the location and operation of a sidewalk and necessary appurtenances, over, across, through, and below the following described property, together with the right of access to the easement at any time for the stated purposes of eein^*^•^*-0- ^a The easement hereby granted is located in the COUNTY OF SNOHOMISH, STATE OF WASHINGTON, and is more particularly described and depicted As fel I ows in Exhibit A, attached hereto and incorporated herein by this -reference - GRANTORS understand and agree for themselves and their successors and assigns not to cause or allow the construction or maintenance of any building or other structure in or upon the area conveyed without the prior written consent of GRANTEE, which may be granted or allowed in GRANTEE'S sole discretion. GRANTORS understand and agree that GRANTEE may cause the summary removal of any such building or structure so placed without GRANTORS' consent and that GRANTORS shall make no claim for and shall hold GRANTEE harmless from any claim by a third person for damage to or destruction of the property so removed. GRANTEE agrees to indemnify, defend and hold GRANTORS harmless from any and all liability or damage, including attorneys' fees and costs, incurred or arisingdirectly irectly from GRANTEE's use of the easement as stated above, except those arising from any of GRANTORS' acts, omissions or negligence. GRANTORS expressly reserve all rights not inconsistent with those granted to GRANTEE herein. DATED THIS DAY OF M... XXXX STATE OF WASHINGTON ) ) ss COUNTY OF SNOHOMISH) 2019 On this day personally appeared before me to me known to be the individuals described in and who executed the within and foregoing instrument and acknowledged that signed the same as free and voluntary act and deed, for the uses and purposes therein mentioned. UNDER MY HAND AND OFFICIAL SEAL THIS DAY OF 920 NOTARY PUBLIC in and for the State of Washington, residing at Pedestrian Easement - 7.8.19.doc Accepted by the City Council dated day of 2019. CITY OF EDMONDS ATTEST/AUTHENTICATED: David O. Earling, Mayor Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney Pedestrian Easement - 7.8.19.doc After recording return to: City Clerk City of Edmonds 121 Fifth Avenue North Edmonds, WA 98020 Document Title(s) Declaration of Covenant - Private Stormwater Facility Reference Number(s) of Related Documents City of Edmonds (permit number) Grantor(s) (Last, First and Middle Initial) Grantee(s) (Last, First and Middle Initial) City of Edmonds Legal Description (abbreviated form; i.e., lot, plat or section, township, range, quarter/quarter) Assessor's Property Tax Parcel/Account Number at the Time of Recording: The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or completeness of the indexing information provided herein. DECLARATION OF COVENANT Private Stormwater Facility WHEREAS, the undersigned Declarant(s) have installed one or more stormwater facilities under Edmonds Community Development Code Chapter 18.30 known as a "low impact development best management practices (LID BMP)" as selected below: ❑ Permeable Pavement ❑ ❑ Rain Garden / Bioretention Cell ❑ ❑ Drywell ❑ Infiltration Trench Gravelless Chamber Other WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the execution and recording of this Declaration of Covenant; NOW, THEREFORE, THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the Property") located at the following address: in the City of Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of himself/herself/themselves/itself and his/her/their/its successors and assigns, as follows: Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit A and have the authority to impose this covenant on the property and bind all future owners, successors, and assigns of the Declarant(s). The Declarant(s), future owners, successors, and assigns of the Declarant(s) shall be referred to collectively as "Owners." 2. The Owners of the Property agree that the Property contains one or more stormwater management facilities referred to as an "LID BMP," which was installed to mitigate the stormwater quantity and quality impacts of some or all of the impervious or non-native pervious surfaces on the property. "Low impact development" means development conducted in a way that seeks to minimize or completely prevent alterations to the natural hydrology of the site. Low impact development includes site planning and design to reduce alterations of natural soil and vegetation cover, minimize impervious surfaces, and specific practices that help to replicate natural hydrology such as permeable pavements, green roofs, soil amendments, bioretention systems, and dispersion of runoff. 3. The Owners shall maintain the size, placement, and design of the LID BMP as depicted on the approved site plan, Exhibit B, and design details shall be maintained and may not be changed without written approval either from the Engineering Division of the City of Edmonds or through a future development permit from the City of Edmonds. Chemical fertilizers and pesticides shall not be used where LID BMP is located. All costs of maintenance and repair shall be the sole responsibility of the Owners. 4. The Owners shall inspect LID BMPs annually for physical defects. After major storm events, the system shall also be checked to ensure that the overflow system is working properly. The Owners also shall maintain all LID BMPs so they function as designed on a year-round basis. 5. The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to enter upon the Property described on Exhibit A at all reasonable times for the purpose of inspecting the private stormwater LID BMP facility. If, as the result of any such inspection, the City of Edmonds determines that the LID BMP is in disrepair, requires maintenance or repair, or is otherwise not functioning as provided in the BMP site plan, the City Engineer or his designee shall have the right, but not the obligation, to order the Owners to maintain or repair the same. 6. If the City of Edmonds determines that the LID BMP requires maintenance or repair pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the deadline within which such maintenance or repair must be completed. Said notice may further advise that, should the violator fail to perform required maintenance or make repairs within the established deadline, the work may be done by the city or a contractor designated by the City Engineer and the expense thereof shall be charged to the Owners. The City's officers, agents, employees, and contractors shall have the right, which is hereby granted by the Owners, to enter upon the Property described on Exhibit A in order to perform such work. The Owners shall bear the cost of all work performed. 7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers, officials, employees and agents from any and all claims, demands, suits, penalties, losses, damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of or in any way resulting from the approval of the LID BMP(s), the installation and presence of the LID BMP(s), and the acts or omissions of the Owners, their officers, employees, contractors, and agents relating to the construction, operation and maintenance of the LID BMP(s) on the Property, except for the City's intentional and willful tortious acts, and waive and release the City of Edmonds from any and all claims for damages and injunctive relief which the Owners may themselves have now or in the future, by reason of the construction, maintenance and operation of said LID BMP(s). 8. This covenant shall run with the land and be binding upon the Owners. Dated: DECLARANT(S): (Signature) (Print Name) (Signature) (Print Name) State of Washington ss. County of Snohomish APPROVED: CITY OF EDMONDS (Signature) (Print Name) (Title) On this day personally appeared before me {Declarant(s)} to me known to be the individual, or individuals described in and who executed the within and foregoing instrument, and acknowledged that he/she/they signed the same as his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned. SUBSCRIBED AND SWORN before me this day of , 201_. (Signature) (Name legibly printed or stamped) Notary Public in and for the State of Washington. Residing at: My commission expires Exhibit A Legal description Exhibit B Site Plan Web date: 0�/03/2015 Site Improvement Bond Quantity Worksheet S15 RECEIVED La King County JUN 27 2019 Department of Permitting & EhVironroental Review OFUELOPMENT SERVICES 35030 SE Douglas Streit, Suite 210 COUNTER Snoqualmie, Washington 98065-9266 For alternate formats, dill 206-296-6600. 206-296-6600 TTY Relay 711 Project I4pme: Clear Vision Short Plat _ Date: 3/29/2019 L_ocgtion: 18227 80th Avenue W Pr*ct No.: PLN20070059 Actkrity No.: Clearing greater than or equal to 5,000 board feet of tim0er? yes X no If yes, Forest Praciice Permit Number: (RCW 76.09) Note: All prices iticlude labor, equipment, materials, overhead and profit. Prices are from R8 Means data tidjusted for the Seattle area or from local sourees if not included in the RS Means database. } 4 � �c 18 of x 12-0 °l o = 3, 5 q I • `10 i3o tJ 0 To 5TARJ' c0N-6 T-. PP, 1o1*� 11 Ric UvZ,t� KILP bZ8 .Sce PvON0 To P(56T-pbKtr CONC07. ¢ ct)P,D r9o, 3. 3 % 'e 5, 1t.P8' �o V)5PV-A'0-n Page 1 of 9 Unit prices updated: 3/2/2015 VQrsion: 3/2/2015 Bond Quantitips Wor;ksheet.xlsx Report Cate: 3129/2019 Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015 Reference # Un{! Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTRO Number Backfill & compaction -embankment ESC-1 $ 6.00 CY Check dams, 4" minus rack ESC-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 95.00 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY j Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF r b0 faw\ 1 Sqo Fence, Temporary NGPE) ESC-7 $ 1.50 LF V ( 0 Ft droseeding ESC-8 SWUM 5.4.2.4 $ 0.80 SY .J,ute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY Mulch, by hand, straw, 3" deep ESC-10 SWUM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESC-11 SWUM 5.4.2.1 $ 2.00 SY Piping, temporary, CPP, 6" ESC-12 $ 12.00 LF Piping, temporary, CPP, 8" ESC-13 $ 14.00 LF Piping, temporary, CPP, 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWUM 5.4.2.3 $ 4.00 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'xl5'xl' ESC-17 SWDM 5.4.4.1 $ 1,800.00 Each 1 1 1800 Rock Construction Entrance, 100'xl5'xl' _ ESC-18 SWDM 5.4.4.1 $ 3,200.00 Each Sediment pond riser assembly ESC-19 SWUM 5.4.5.2 $ 2,200.00 Each Sediment trap, 5' high berm ESC-20 SWUM 5.4.5.1 $ 19.00 LF Sped. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWUM 5.4.2.4 $ 1.00 SY ESC-23 SWUM 5.4.2.5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR 20 1 2200 Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR 5 1 700 RITE -IN -IT MS **** see a e J9 Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 Bond Quantities Worksheet.xlsx $ 4,700-.W- t. -IZb $ 1,410.00 $ 6,110.00 A Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right -of -Way Future Public Right of Way $ Drainage Facilities Quant. Cost Private Improvements Quant. Cost Unit Price Unit Quant Cost GENERAL ITEII,S o. BUckfill & Compaction- embankment GI - 1 $ 6.00 CY Beckfill & Compaction- trench GI , 2 $ 9.00 CY 49 440.00 67 602.00 Clear/Remove Brush, by hand GI - 3 $ 1.00 SY Glearin /Grubbin /Ttee Removal GI - 4 $ 10,000.00 Acre 0.1 1,000.00 Excavation - bulk GI - 5 $ 2.00 CY E'(Cavatlon - Trendh GI - 6 $ 5.00 CY 40 244.44 67 334.44 Fencing, cedar. 6' h' h GI-7 $ 20.00 LF Fencing, chain link, vinyl coated, 6' hi h GI - 8 $ 20.00 LF Fencing, chain link, gate, vinyl coated, 20 GI-9 $ 1.400.00 Each Fencing, split rail, Thigh GI.- 10 $ 15.00 LF Fill & compact - common barrow GI - 11 $ 25.00 CY Fill & compact - gravel base GI - 12 $ 27.00 CY Fill & compact - screened topsoil GI - 13 $ 39.00 CY Gabion, 12" deep, stone filled mesh GI.- 14 $ 65.00 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 90.00 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading, fine, by hand GI - 17 $ 2.50 SY Grading, fine, with grader GI - 18 $ 2.00 SY Monuments, 3' Ion GI - 19 $ 250.00 Each Sensitive Areas Sign GI - 20 $ 7.00 Each Sodding, 1" deep, sloped grolind GI - 21 $ 8.00 SY Surveying, line & grade GI - 22 $ 850.00 Day 4 3,400.00 SUrve ing, lot location/lines GI - 23 $ 1,800.00 Acre Traffic control crew 2 flaggers) GI - 24 $ 120.00 HR 40 4,800.00 Trail, 4" chipped wood GI - 25 $ 8.00 SY Trail, 4" crushed cinder GL- 26 $ 9.00 SY Trail, 4" top course- GI - 27 $ 12.00 SY Wall, retaining, concrete GI - 28 $ 55.00 SF Wall, rockery I GI - 29 $ 15.00 SF 264 3,960.00 Page 3 of 9 SUBTOTAL 5,484.44 9,296.44 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Ver,5ion: 03/02/2015 Bond Quantities Worksheet.xlsx Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 _ Existing Right-of-way Futurr Public Right (if Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. i Cost ROAD IMPROVEMENT Imo, AC Grinding, 4' wide machine < 1000sy RI - 1 $ 30.00 SY _ AC Grinding, 4' wide machine 1000-20M RI - 2 $ 16.00 SY _ AC Grinding, 4' wide machine > 2000sy RI - 3 $ 10.00 SY _ AC Removal/Disp6sal RI - 4 $ 35.00 SY 64 _ 392 13,708.33 BArricade, type III permanent) RI - 6 $ 56.00 LF _2_,255.56 _ Curb & Gutter, rolled RI - 7 $ 17.00 LF _ Curb & Gutter, vertical RI - 8 $ 12.50 LF 151 1,88750 144 1,800.00 Curb and Gutter, demolition end disposal RI -9 $ 18.00 LF _ _ Curb, extruded asphalt RI . 10 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF _ Sowcut, asphalt, 3" depth RI - 12 $ 1.85 LF 253 468.05 _ Sgwcut, concrete, p8r 1" depth RI - 13 $ 3.00 LF Sealant, asphalt RI - 14 $ 2.00 LF Shoulder, AC, ( see AC road unit price) RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY _ Sidewalk, 4" thick RI - 17 $ 38.00 SY 88 _ 3,348.22 Sidewalk, 4" thick, demolition and dispos RI - 18 $ 32.00 SY _ S dewalk, 5" thick RI - 19 $ 41.00 SY _ Sidewalk, 5" thick, demolition and dispose RI a 20 $ 40.00 SY _ ,fgn, handicap RI.21 $ 85.00 Each Striping, per stall RI = 22 $ 7.00 Each Striping, thermoplastic, ( for prosswalk ) RI - 23 $ 3.00 SF Striping, 4" reflectarized line RI 24 $ 0.50 LF Page 4 of 9 SUBTOTAL 7,959.33 15,508.33 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet.xlsx Report Date: 3/29/2019 Site Improvement Band Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & DrainaFacilities Private ImproveMents Quant. T Cost Unit Price Unit Quant. Cost Quant. Cost ROAD SURFACING No.. (4" Rock = 2.5 base 1.5" top course) 9 1/2"_Rock= 8" base & 1.5" trap course) Additional 2.5" Crushed Surfacing RS - 1 $ 3.60 SY HMA 1/2" Overlay, 1,5' RS-2 $ 14.00 SY HMA 1/2" Overlay 2" RS 3 $ 18.00 SY HMA Road, 2", 4" dock, First,2500 SY RS . 4 $ 28.00 SY HMA Road, 2", 4" ruck, Qty. over 2500 S RS, 5 $ 21.00 SY 4MA Road, 3", 9 1/2" Rock, First 2500 S RS - 6 $ 42.00 SY HMA Road, 3", 9 112' Rock, Qty Over 25C RS , 7 $ 35.00 SY _ Not Used RS 8 Not Used RS - 9 _ IHMA Road, 6" Depth, First 2500 SY RS, 10 $ 33.10 SY 68 2,261.83 IHMA Road, 6" Depth, Qty, Over 2500 SY RS - 11 $ 30.00 SY HMA 3/4" or 1 ", 4" Depth RS - 12 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 13 $ 15.00 SY _ _ Gravel Road, 4" rock, Qty, over 2500 SY RS - 14 $ 10.00 SY _ PCC Road (Add Under Write -Ins w/Desig RS - 15 Thickened Edge IRS - 17 $ 8.60 LF Page 5 of 9 SUBTOTAL 2,261.83 Unit prices updated: 03/02/2015 "KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet.xlsx Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Privatte Improvements Unit Price Unit Quant. Cost Quant. Cost Quant, Cost 131RAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Cuivert prices, Avr ra e of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road. R/D D r 1 $ 21.00 SY Mllards - fixed _ D = 2 $ 240.74 Each Bollards - removable D 3 $ 452.34 Each _ * (CBs include frame and lid T CS Type I D - 4 $ 1,500.00 Each _ 1 1,500.00 3,000.00 CB Type IL D q 5 $ 1,750.00 Each _ CB Type II, 48" diameter D - 6 $ 2,300.00 Each fi -i Cliff i V1 JW lM for additional depth over 4.' D = 7 $ 480.00 FT M Type II, 54" diameter D - 8 $ 2,500.00 Each _ 41 Ali C 1 for additional depth over 4' D 9 $ 495.00 FT _ CB Type II, 60" diameter D.10 $ 2,800.00 Each for additional depth over 4' D . 11 $ 600.00 FT _ M Type II, 72" diameter D . 12 $ 3,600.00 Each +_ for additional depth over 4' D . 13 $ 850.00 FT Through -curb Inlet Ftamewodc (Add) D - 14 $ 400.00 Each _ Cleanout, PVC, 4" D . 15 $ 150.00 Each T Cleanout, PVC, 6" D . 16 $ 170.00 Each _ �J_ (O�U 1,020.00 ,Cleanout, PVC, 8" D • 17 $ 200.00 Each Z� Culvert, PVC, 4" _ D . 18 $ 10.00 LF _ 3b- Culvert, PVC, 6" D . 19 $ 13.00 LF Culvert, PVC, 8" _ D < 20 $ 15.00 LF _ Culvert, PVC, 12" D < 21 $ 23.00 LF _ Culvert, CMP, 8" D < 22 $ 19.00 LF _ Culvert, CMP, 12" D < 23 $ 29.00 LF Culvert, CMP, 15" D � 24 $ 35.00 LF _ Culvert, CMP, 18" D < 25 $ 41.00 LF Culvert, CMP, 24" D � 26 $ 56.00 LF _ Culvert, CMP, 30" D < 27 $ 78.00 LF _ Culvert, CMP, 36" D,28 $ 130.00 LF Culvert, CMP, 48" D,29 $ 190.00 LF _ Culvert, CMP, 60" D < 30 $ 270.00 LF _ Culvert, CMP, 72" D . 31 $ 350.00 LF Page6of9 SUBTOTAL 1,500.00 q Z Ll 6 4;92.OM-. *KCC 27A authorizes only one bond reduction. Bond Quantities Worksheet.xlsx Unit prices updated: 03/02/2015 Version: 03/02/2015 Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant. Cost_ Quant. Cost Quant. Cost Culvert, Concrete, 80 D - 32 $ 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF . Culvert, Concrete, 15" D - 34 $ 42.00 LF 4 Culvert, Concrete, 18" D - 35 $ 48.00 LF Culvert, Concrete, 24" D - 36 $ 78.00 LF Culvert, Concrete, 30" D - 37 $ 125.00 LF Culvert, Concrete, 36" D - 38 $ 150.00 LF Culvert, Concrete, 42" D - 39 $ 175.00 LF Culvert, Concrete, 48" D - 40 $ 205.00 LF Culvert, CPP, 6" D - 41 $ 14.00 LF _ 66 924 Culvert, CPP, 8" D - 42 $ 16.00 LF Culvert, CPP, 12", D - 43 $ 24.00 LF 165 3960 Culvert, CPP, 15" D - 44 $ 35.00 LF _ Culvert, CPP, 18" D - 45 $ 41.00 LF _ Culvert, CPP, 24" D . 46 $ 56.00 LF Culvert, CPP, 30" D - 47 $ 78.00 LF ^_ Culvert, CPP, 36" D . 48 $ 130.00 LF Dttching D - 49 $ 9.50 CY Flow Dispersal Trench (1,436 base+) D - 50 $ 28.00 LF _ French Drain (3' depth) D - 51 $ 26.00 LF _ 70 1820 ,Geotextile, laid in trench, polypropylene D - 52 $ 3.00 SY Mid -tank Access Ri$4er, 48" d}a. 6' deep D - 54 $ 2,000.00 Each Pond Overflow Spillway D - 55 $ 16.00 SY _ _ Restrictor/Oil Sepal@tor, 12" D - 56 $ 1,150.00 Each Restrictor/Oil Separator, 15" D - 57 $ 1,350.00 Each Restrictor/Oil Sepwator, 18" _ D - $8 $ 1,700.00 Each Rlprap, placed D - 59 $ 42.00 CY _ Tank End Reducer (36" diameter) D . 60 $ 1,200.00 Each Trash Rack, 12" D - 61 $ 350.00 Each Trash Rack, 15" _ D - 62 $ 410.00 Each _ Trash Rack, 18" D - 63 $ 480.00 Each Trash Rack, 21" D - 64 $ 550.00 Each Page 7 of 9 SUBTOTAL 3960 2744 Unit prices updated: 03/02/2015 ''KCC 27A authorizes orljy one bond reduction. Version: 03/02/2015 Bond Quantities Workshf)et.xlsx Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unityrice Unit Quant, Price Quant. Cost Quant. Cost PARKING LOT §URF6PING Not To Be Used For Roads Or Shoulders 2" AC, 2" top course rock & 4" borrow PL � 1 $ 21.00 SY NA NA 2" AC, 1.5" top course & 2.5' base cours PL, 2 $ 28.00 SY NA NA 4" select borrow PL � 3 $ 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL = 4 $ 14.00 SY NA NA UTILITY POLES & SIBEET LIGHTING Utility We relocation costs must -be accompanied by Franchise Utility's Cost E*timate L tllity Pole(s) Relocation UP-1 Lump Sum Street Light Poles W/Luminalms UP-2 $ 7,500.00 Each WRITE-IN-ITE (Such as detention/water quality vaults. No- Mywell WI.1 $ 10,000.00 Each 1 10,000.00 krmeable Pavemeht WI = 2 $ 15.00 SF 3713 55,695.00 WI=3 CY WI=4 LF W I t 5 FT WI-6 WI-7 WI-8 WI=9 WHO SU&OTAL SUBTgTAL (SUISI ALL PAGES): 30% CONTINGENCY & MOBILIZATION: GRANDTOTAL: COLUMN: Page 8 of 9 T 2.9,levl-U6 Ioa,4Ql. 17 24;'f89:81 .97..7.6&-7B 29�f t9� 4"s 7 i l�KZ.•C?j 1 2,Z;595.29• 1a�26,442. B C D Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantities Worksheet.xlsx Report Date: 3/29/2019 Site Improvement Bond Quantity Worksheefi Web date: 04/03/2015 original bond corhputatiops prepared by: Niame: _ William N. -r_aylor PE Registration Nrimber: 26198 Date: 3/29/2019 Tel. #: 425-391-1415 Ftrm Name: TEC, Inc. liWdress: PO Box 1787, Issaquah, WA 98027 Project No: PLN20070059 Stabilization/Erosion Sediment Control (ESC) Existing Right-of4ay Irnprovements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/qr Site Restoration Bond*/** (First $7,500 of bond* shall bb cash.) Performance Bond* Amount (A+B+C+Q) = TOTAL Maintenance/Defect BonO* Total NAME OF PERSON PREPARING BOND* REDUCTION: FINANCIAL GUARANTEE REQUIREMENTS MRFORMANCE SOND* AMOUNT (A) S _ ] y 34 B04" (B) $ 1, (g2.N2*;645-3 (C) $ (D) $ 13 (e, ��. V216;442.9 1 (A+B) _ $ L4d I V A5. 0g 33;fi2" (T) $ 90, D51 3� 16 M8-.2 Minimum is $2000. MINIMUM BOPID* AMOUNT REQUIRED FOR%RECORDING OR TEMPORARY WCUPANCY AT SUBSTANTIAL COMPLETION *** x 0.30 $ 48, 020.5 Minimum is:,$2000. PUBLIC ROAD & DRAINAGE MAINTENANCE/DEFECT BOND* (B+C) x 0-25 = $ 6,878.8 Minimum is $2000. Date: * NOTE: The word "band" as used in this docurorent means a financial guarantee acceptable to King County. ** NOTE: KCC 27A aL4thorizes right of Way and sate restoration bonds to be combined when both are required. The restorabion requirement shall include the total cost for all TESC as a minimum., not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case sedharios not just minimum requirements. For example, if a salmonid stream may,loe damaged, some estimated costs for restoration needs to be reflected in this amount. 'The 30% contingency and mobilization costs are coMputed in this quantity. *** NOTE: Pei: KCC 27A, total bond amounts remaining after reduetion shall not be less than 30% of the original amount (T) or as, revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJE QT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of 9 Unit prices updated: 03/02(2015 Check out the DDT Web site at www.kin_gcounty.gov/permits Version: 03/02/2015 Bond Quantities Worksheet.xlsx Report Date: 3/29/2019