Engineering Correction Notice-11.22.2019.pdfCITY OF EDMONDS
CORRECTION NOTICE
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: November 22, 2019 PERMIT NUMBER: BLD20180503
OWNER: Robert Reichler SITE CONTACT: Mike Toups
ADDRESS: 21827 761h Ave W
TYPE OF INSPECTION: FINAL INSPECTION
❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED
❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR
ON SITE
® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE
APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED.
® RECALL FOR INSPECTION
❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST.
❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR
1. Prior to receiving final construction approval from the Engineering Division, the parking lot
revision currently under review shall be approved and issued to the applicant.
2. Permanently stabilize exposed soils. It appears that most of the landscaping is complete,
however, there will still some exposed soils on the west side of the lower driveway approach.
3. Remove filter socks from all catch basins and clean storm structures as needed.
4. Complete parking lot striping consistent with approved plans, whether that's the original plan or
an approved revision.
5. An asbuilt was emailed on 11/18/2019. Please address the following:
a. Revise to accurately reflect the frontage improvements.
b. Revise the pervious and impervious surface areas as shown on the original approved
plans by adding a strikethrough line and updating the square footage as appropriate.
c. The new pervious and impervious surface areas shall clearly be shown on the plans.
d. The asbuilt provides updated parking stall numbers. Please confirm that the number of
proposed stalls matches that required in the approved plans or approved revision.
For inspection scheduling call 425-771-0220 x1326
OR
Schedule on-line through Citizens Connect
Page 2 of 2